BERT HOWE
  • Nationwide: (800) 482-1822    
    high-rise construction building expert Seattle Washington housing building expert Seattle Washington industrial building building expert Seattle Washington multi family housing building expert Seattle Washington office building building expert Seattle Washington condominiums building expert Seattle Washington mid-rise construction building expert Seattle Washington low-income housing building expert Seattle Washington Subterranean parking building expert Seattle Washington custom homes building expert Seattle Washington custom home building expert Seattle Washington Medical building building expert Seattle Washington institutional building building expert Seattle Washington production housing building expert Seattle Washington hospital construction building expert Seattle Washington townhome construction building expert Seattle Washington condominium building expert Seattle Washington retail construction building expert Seattle Washington tract home building expert Seattle Washington landscaping construction building expert Seattle Washington structural steel construction building expert Seattle Washington concrete tilt-up building expert Seattle Washington
    Seattle Washington structural engineering expert witnessesSeattle Washington expert witness commercial buildingsSeattle Washington construction expertsSeattle Washington construction code expert witnessSeattle Washington defective construction expertSeattle Washington soil failure expert witnessSeattle Washington stucco expert witness
    Arrange No Cost Consultation
    Building Expert Builders Information
    Seattle, Washington

    Washington Builders Right To Repair Current Law Summary:

    Current Law Summary: (SB 5536) The legislature passed a contractor protection bill that reduces contractors' exposure to lawsuits to six years from 12, and gives builders seven "affirmative defenses" to counter defect complaints from homeowners. Claimant must provide notice no later than 45 days before filing action; within 21 days of notice of claim, "construction professional" must serve response; claimant must accept or reject inspection proposal or settlement offer within 30 days; within 14 days following inspection, construction pro must serve written offer to remedy/compromise/settle; claimant can reject all offers; statutes of limitations are tolled until 60 days after period of time during which filing of action is barred under section 3 of the act. This law applies to single-family dwellings and condos.


    Building Expert Contractors Licensing
    Guidelines Seattle Washington

    A license is required for plumbing, and electrical trades. Businesses must register with the Secretary of State.


    Building Expert Contractors Building Industry
    Association Directory
    MBuilders Association of King & Snohomish Counties
    Local # 4955
    335 116th Ave SE
    Bellevue, WA 98004

    Seattle Washington Building Expert 10/ 10

    Home Builders Association of Kitsap County
    Local # 4944
    5251 Auto Ctr Way
    Bremerton, WA 98312

    Seattle Washington Building Expert 10/ 10

    Home Builders Association of Spokane
    Local # 4966
    5813 E 4th Ave Ste 201
    Spokane, WA 99212

    Seattle Washington Building Expert 10/ 10

    Home Builders Association of North Central
    Local # 4957
    PO Box 2065
    Wenatchee, WA 98801

    Seattle Washington Building Expert 10/ 10

    MBuilders Association of Pierce County
    Local # 4977
    PO Box 1913 Suite 301
    Tacoma, WA 98401

    Seattle Washington Building Expert 10/ 10

    North Peninsula Builders Association
    Local # 4927
    PO Box 748
    Port Angeles, WA 98362
    Seattle Washington Building Expert 10/ 10

    Jefferson County Home Builders Association
    Local # 4947
    PO Box 1399
    Port Hadlock, WA 98339

    Seattle Washington Building Expert 10/ 10


    Building Expert News and Information
    For Seattle Washington


    Contract, Breach of Contract, and Material Breach of Contract

    California Court of Appeal Holds That the Right to Repair Act Prohibits Class Actions Against Manufacturers of Products Completely Manufactured Offsite

    No Occurrence Found for Damage to Home Caused by Settling

    No Coverage For Construction Defects When Complaint Alleges Contractual Damages

    Lessons from the Sept. 19 Mexico Earthquake

    For Whom Additional Insured Coverage Applies in New York

    Previously Owned U.S. Home Sales Rise to Eight-Month High

    Fed. Judge Blocks Release of Records on FIU Bridge Collapse, Citing NTSB Investigation

    Best Practices in Construction– What are Yours?

    New Jersey Appellate Court Reinstates Asbestos Action

    Court Confirms No Duty to Reimburse for Prophylactic Repairs Prior to Actual Collapse

    2024 Update to CEB’s Mechanics Liens Now Available

    Construction Contracts Fall in Denver

    Is Modular Construction Destined to Fail?

    New Jersey Appellate Decision Reminds Bid Protestors to Take Caution When Determining Where to File an Action

    Alabama Limits Duty to Defend for Construction Defects

    Subrogation 101 (and Why Should I Care?)

    Surety Trends to Keep an Eye on in the Construction Industry

    One Shot to Get It Right: Navigating the COVID-19 Vaccine in the Workplace

    Supreme Court Eliminates Judicial 'Chevron' Deference to Federal Agency Statutory Interpretations

    Business Solutions Alert: Homeowners' Complaint for Breach of Loan Modification Agreement Can Proceed Past Pleading Stage

    COVID-19 Damages and Time Recovery: Contract Checklist and Analysis

    Cogently Written Opinion Finds Coverage for Loss Caused By Defective Concrete

    Packard Condominiums Settled with Kosene & Kosene Residential

    Working Safely With Silica: Health Hazards and OSHA Compliance

    Construction Defects could become Issue in Governor’s Race

    Expanded Virginia Court of Appeals Leads to Policyholder Relief

    Part I: Key Provisions of School Facility Construction & Design Contracts

    Manufacturer of Asbestos-Free Product May Still Be Liable for Asbestos Related Injuries

    Plaintiff’s Mere Presence in Area Where Asbestos is Present Insufficient to Establish Bystander Exposure

    Contract Terms Can Impact the Accrual Date For Florida’s Statute of Repose

    Exceptions to Privette Doctrine Do Not Apply Where There is No Evidence a General Contractor Affirmatively Contributed to the Injuries of an Independent Contractor's Employee

    Quick Note: Attorney’s Fees on Attorney’s Fees

    Aging-in-Place Features Becoming Essential for Many Home Buyers

    Traub Lieberman Partner Michael K. Kiernan and Associate Brandon Christian Obtain Dismissal with Prejudice in Favor of Defendant

    Apprentices on Public Works Projects: Sometimes it’s Not What You Do But Who You Do the Work For That Counts

    Napa Quake Seen Costing Up to $4 Billion as Wineries Shut

    Hurricane Laura: Implications for Insurers in Louisiana

    Supreme Court Holds That Prevailing Wage Statute is Constitutional

    Right to Repair Reform: Revisions and Proposals to State’s “Right to Repair Statutes”

    Scope of Alaska’s Dump Lien Statute Substantially Reduced For Natural Gas Contractors

    Colorado’s New Construction Defect Law Takes Effect in September: What You Need to Know

    Kiewit Selected for Rebuild of Collapsed Baltimore Bridge

    Contractor Sentenced to Seven Years for Embezzling $3 Million

    Third Circuit Holds No Coverage for Faulty Workmanship Despite Insured’s Expectations

    Kushner Company Files Suit Against Jersey City Over Delays to Planned Towers

    Gene Witkin Joins Ross Hart’s Mediation Team at AMCC

    Trump Soho May Abandon Condos to Operate Mainly as Hotel

    What is the True Value of Rooftop Solar Panels?

    Six-Month Prison Term for Role in HOA Scam
    Corporate Profile

    SEATTLE WASHINGTON BUILDING EXPERT
    DIRECTORY AND CAPABILITIES

    Leveraging from more than 7,000 construction defect and claims related expert witness designations, the Seattle, Washington Building Expert Group provides a wide range of trial support and consulting services to Seattle's most acknowledged construction practice groups, CGL carriers, builders, owners, and public agencies. Drawing from a diverse pool of construction and design professionals, BHA is able to simultaneously analyze complex claims from the perspective of design, engineering, cost, or standard of care.

    Building Expert News & Info
    Seattle, Washington

    With Trump's Tariff Talk, Time to Negotiate for Escalation Clauses in Construction Contracts

    December 17, 2024 —
    Remember 2019? That’s when contractors faced sudden material price surges from tariffs during then-President Donald Trump’s first term in office. How about 2021? That's when contractors saw new price surges and long delivery delays because of Covid-19. Read the court decision
    Read the full story...
    Reprinted courtesy of Richard Korman, ENR
    Mr. Korman may be contacted at kormanr@enr.com

    Court Finds Matching of Damaged Materials is Required by Policy

    April 02, 2024 —
    The court granted, in part, the insured's motion for summary judgment by finding that matching roof tiles were required under the policy. Bertisen v. Travelers Home and Marine Ins. Co., 2024 U.S. Dist. LEXIS 3907 (D. Colo. Jan. 8, 2024). The insureds sued Travelers for breach of contract, common law bad faith, and unreasonable delay or denial of benefits. They alleged that their residence was damaged by a hailstorm and that Travelers breached their policy and acted in bad faith in the handling of the claim. The insureds demanded an appraisal to determine the "amount of loss" under the policy and an appraisal award was issued. Travelers then denied payment for all roof tiles that were contemplated by the appraisal award. Read the court decision
    Read the full story...
    Reprinted courtesy of Tred R. Eyerly, Damon Key Leong Kupchak Hastert
    Mr. Eyerly may be contacted at te@hawaiilawyer.com

    Approaching Design-Build Projects to Avoid (or Win) Disputes

    August 07, 2023 —
    Stakeholders engage in design-build projects believing the collaborative nature better aligns parties' interests and reduces overall risk exposure. Each of the lead parties bases this belief on different factors—the owner sees an opportunity to reduce change-order exposure and improve delivery times, the design-builder (or contractor) aims to control design volatility by ensuring project components match budgeted projections, and the designer intends to benefit by greater constructability review from the design-builder team and often additional time to detail designs. Rarely do design-build parties contemplate claims arising while initiating a project. This being said, design-build projects carry unique, inherent risks due to the award of often fixed-price contracts utilizing incomplete, preliminary designs. As scopes creep and costs balloon, previously harmonious parties experience discord and lurking claims. While the majority of design-build projects are completed without major dispute, there are strategies available to further avoid disputes and prevail in those that are unavoidable. Reprinted courtesy of Stuart Eisler, Construction Executive, a publication of Associated Builders and Contractors. All rights reserved. Read the court decision
    Read the full story...
    Reprinted courtesy of

    The Top 10 Changes to the AIA A201: What You Need to Know

    May 24, 2018 —
    For this week’s Guest Post Friday here at Musings, we welcome back Melissa Dewey Brumback. Melissa is a construction law attorney with Ragsdale Liggett in Raleigh, North Carolina. Aside from the fact that she is a UNC grad and fan, she’s okay! In 2017, as it does every ten years, the American Institute of Architects (AIA) updated most of its standard form contract documents, including the A201 General Conditions. This cycle, the contract changes are evolutionary in nature, not revolutionary. Even so, it is crucial to know the changes to avoid making a fatal mistake that could cost you money on a construction project. In reverse order, the top 10 changes you need to know include: # 10: Differing Site Conditions Prior editions of the A201 provided that upon encountering differing site conditions, the Contractor was to promptly provide notice to the Owner and Architect, before the conditions are disturbed, and in no event later than 21 days after the conditions were first observed. A201–2017 shortens the time for notice from 21 to 14 days. Read the court decision
    Read the full story...
    Reprinted courtesy of Christopher G. Hill, The Law Office of Christopher G. Hill
    Mr. Hill may be contacted at chrisghill@constructionlawva.com

    US Homes Face Costly Retrofits for Induction Stoves, EV Chargers

    May 20, 2024 —
    Buyers of new homes in the US may find themselves saddled with electrical systems better suited to the 20th century than the 21st. The International Code Council, which sets model construction standards for new homes, was expected to include building electrification measures in its 2024 energy code on March 20. But following appeals lodged by industry groups, the ICC board moved the measures to the code’s appendices, effectively making them optional, as first reported by the Huffington Post. If new homes aren’t wired for increasing power needs from electric appliances and car chargers, it will bump the effort and cost of making such upgrades onto homeowners — a deterrent to going electric. Energy efficiency advocates say this could slow the pace of the energy transition, costing both jobs and the planet. Read the court decision
    Read the full story...
    Reprinted courtesy of Kendra Pierre-Louis, Bloomberg

    Contractor Covered for Voluntary Remediation Efforts in Completed Homes

    October 10, 2013 —
    The Texas Supreme Court held that a home builder was covered for the voluntary removal and replacement of a defective insulation product it had installed in hundreds of homes. Lennar Corp. v. Market Am. Ins. Co., 2013 Tex. LEXIS 597 (Tex. Sup. Ct. Aug. 23, 2013). Lennar built homes using an exterior insulation and finish system (EIFS). It was subsequently determined that EIFS trapped water inside homes with wood-frame walls, causing rot and structural damage, mildew and mold, and termite infestation. Lennar decided to contact all its homeowners and offer to remove the EIFS and replace it with conventional stucco. Lennar notified its insurers that it would seek indemnification for the costs. The insurers refused to participate in Lennar's proactive efforts, preferring to wait and respond to homeowners' claims one by one. Read the court decision
    Read the full story...
    Reprinted courtesy of Tred Eyerly
    Tred Eyerly can be contacted at te@hawaiilawyer.com

    Challenging and Defending a California Public Works Stop Payment Notice: Affidavit vs. Counter-Affidavit Process

    October 21, 2019 —
    One of the most effective collection procedures available to subcontractors and suppliers to California Construction projects is the “stop payment notice” procedure found under California Civil Code sections 9350 – 9364. Under this procedure, the unpaid subcontractor or supplier may serve the stop payment notice on the public entity and the direct or “prime” contractor and cause the public entity to withhold from the direct contractor 125% of the funds identified in the stop payment notice. Thereafter, funds will not generally be released unless the parties reach a settlement agreement or the issue is decided through litigation, arbitration or mediation. There is however an alternative procedure available to direct contractors to expedite the determination of whether a stop payment notice is valid and to possibly obtain an early release of the funds withheld by the public entity. This “summary proceeding” process could result in release of funds to the direct contractor in less than 30 days. The summary proceeding can also be challenged by the unpaid subcontractor or supplier. All public works contractors, subcontractors and suppliers should be aware of the process. The process for direct contractors to release a stop payment notice and for subcontractors and suppliers to challenge the process works as follows: After a California stop payment notice has been served and the public entity has withheld funds accordingly, the direct contractor may challenge the stop payment notice by serving an “affidavit” (basically a sworn statement showing why the stop notice is not valid) on the public entity, demanding that the public entity release all funds withheld. Upon receipt of such an affidavit, the public entity will serve the subcontractor or supplier who served the stop payment notice with a copy of the affidavit, along with a “demand for release of funds”. If the stop payment notice claimant does not respond with a “counter-affidavit” by the date stated on the notice sent by the public entity (“not less than 10 days nor more than 20 days after service on the claimant of a copy of the affidavit”), then the public entity will be within its rights to release the withheld funds to the direct contractor, and the stop payment notice claimant will relinquish its stop payment notice rights. Read the court decision
    Read the full story...
    Reprinted courtesy of William L. Porter, Porter Law Group
    Mr. Porter may be contacted at bporter@porterlaw.com

    Mitigating Mold Exposure in Manufacturing and Multifamily Buildings

    July 31, 2024 —
    As hurricanes season and summer storms approach, more apartment complexes, commercial and industrial properties, and public buildings are at risk of leaking and flooding. Water-saturated structures are prime breeding grounds for mold, but there are ways to prevent, detect and remove it before it becomes a serious and costly issue—for buildings and building residents alike. Being proactive limits an owner’s exposure to the liability of debilitating health effects and structural safety concerns. Mold requires three things to grow: water, food and humidity. Water will stealthily penetrate small porous surfaces of any building material, such as drywall, plaster, wood, concrete or even fabrics. These materials serve as a food source to quickly produce more fungus. Common sources of undetected water flow include foundation problems, poorly installed windows, roof malfunctions, gutter clogs, storm damage, leaky pipes, improper drainage, HVAC issues, faulty appliances, bathroom vent issues and wet building materials. Mold loves humidity and thrives in dark, warm environments, such as attics, basements, lofts, building corners and bathrooms. Reprinted courtesy of Laura Champagne, Construction Executive, a publication of Associated Builders and Contractors. All rights reserved. Read the court decision
    Read the full story...
    Reprinted courtesy of