Oregon Courthouse Reopening after Four Years Repairing Defects
April 01, 2014 —
Beverley BevenFlorez-CDJ STAFFThe Courthouse Square in Marion County, Oregon is due to reopen after four years and nearly $23 million of repair costs to fix structural defects, according to the Statesman Journal. The square includes a courthouse building and bus mall, and is jointly owned by the county and transit district.
Two years after the Courthouse Square had been built, cracks were observed “in the building’s walls” and “paving stones on the bus mall shifted and settled.” A construction defect suit was filed in 2006.
However, the situation worsened in July of 2010 when “engineers determined that the entire complex was dangerous,” according to the Statesman Journal. “Building safety officials gave Courthouse Square’s occupants 60 days to move out, forcing county and transit district operations into temporary leased space.”
Now that the structural repairs have been completed, Dave Clark, project manager with Structural Preservation Systems LLC (the company awarded the repair contract), stated that the building’s structure is now stronger than most buildings. “If there’s an earthquake, come to this building,” Clark said.
Read the court decisionRead the full story...Reprinted courtesy of
Jersey City, New Jersey, to Get 95-Story Condo Tower
January 21, 2015 —
David M. Levitt and Terrence Dopp – BloombergA Chinese developer is planning a 95-story condominium tower for the Jersey City, New Jersey, waterfront that would be the tallest building in the state.
China Overseas America Inc. plans to construct the 950-foot (290-meter) building at 99 Hudson St., according to a statement on Tuesday from Mayor Steven Fulop. The skyscraper, with 760 for-sale dwellings, would surpass the Goldman Sachs Group Inc. tower two blocks to the south, which is 781 feet tall, according to the statement.
Mr. Levitt may be contacted at dlevitt@bloomberg.net; Mr. Dopp may be contacted at tdopp@bloomberg.net
Read the court decisionRead the full story...Reprinted courtesy of
David M. Levitt and Terrence Dopp, Bloomberg
English High Court Finds That Business-Interruption Insurance Can Cover COVID-19 Losses
November 02, 2020 —
Lorelie S. Masters, Scott P. DeVries, Patrick M. McDermott & Jorge R. Aviles - Hunton Insurance Recovery BlogIn a decision that will influence how policyholders and insurers around the world address business-interruption coverage for COVID-19 losses, the English High Court recently handed down its much-anticipated judgment in the “Test Case,” The Financial Conduct Authority (FCA) v. Arch et al. The High Court’s comprehensive analysis will likely serve as an additional tool in policyholders’ arsenal in the ongoing battles over COVID-19 coverage.
The Panel, composed of two well-respected judges, one from the High Court (the UK’s trial court) and the other from the English Court of Appeal, analyzed 21 sample policy wordings in coverage extensions for business-interruption losses due to disease or the issuance of public authority orders. (Many of these wordings are also found in policies sold to US policyholders.) The High Court found that the COVID-19 pandemic and ensuing government actions fell within the coverage provided by the sample policy wordings.
Reprinted courtesy of
Lorelie S. Masters, Hunton Andrews Kurth,
Scott P. DeVries, Hunton Andrews Kurth,
Patrick M. McDermott, Hunton Andrews Kurth and
Jorge R. Aviles, Hunton Andrews Kurth
Ms. Masters may be contacted at lmasters@HuntonAK.com
Mr. DeVries may be contacted at sdevries@HuntonAK.com
Mr. McDermott may be contacted at pmcdermott@HuntonAK.com
Mr. Aviles may be contacted at javiles@HuntonAK.com
Read the court decisionRead the full story...Reprinted courtesy of
Issue and Claim Preclusion When Forced to Litigate Similar Issues in Different Forums: White River Village, LLP v. Fidelity and Deposit Company of Maryland
October 10, 2013 —
Brady Iandiorio — Higgins, Hopkins, McLain & Roswell, LLC.Often in construction litigation the parties wish to move the case to arbitration. However, there are certain circumstances in which such change of litigation forums should be carefully analyzed. The case of White River Village, LLP v. Fidelity and Deposit Company of Maryland, serves as an example of one of those circumstances.
In March 2013, U.S. District Court Judge Blackburn ruled on a motion for summary judgment filed by Fidelity and Deposit Company of Maryland (“F&D”). The order grants the motion in part and denies it in part. White River Village, LLP (“White River”) was the owner of the project which hired S&S Joint Venture (“S&S”), the contractor, to build two similar developments, directly adjacent to each other. The contracts between Whiter River and S&S for the two projects were so substantially similar that the court referred to them as the S&S Contracts. F&D issued payment and performance bonds guarantying the obligations of S&S under the S&S Contracts.
After S&S defaulted on the construction contracts, F&D, as the surety, undertook to complete performance on the contracts. White River alleged that F&D was liable for construction defects and delays in completing the project, and failed to fulfill its obligations under the performance bonds after it overtook the construction of the projects.
Read the court decisionRead the full story...Reprinted courtesy of
Brady IandiorioBrady Iandiorio can be contacted at
Iandiorio@hhmrlaw.com
Fifth Circuit Holds Insurer Owes Duty to Defend Latent Condition Claim That Caused Fire Damage to Property Years After Construction Work
September 21, 2020 —
Jeremy S. Macklin - Traub LiebermanMost general liability policies only provide coverage for “property damage” that occurs during the policy period. Thus, when analyzing coverage for a construction defect claim, it is important to ascertain the date on which damage occurred. Of course, the plaintiffs’ bar crafts pleadings to be purposefully vague as to the date (or period) of damage to property. A recent Fifth Circuit decision applying Texas law addresses this coverage issue in the context of allegations of a condition created by an insured during the policy period that caused damage after the policy expired.
In Gonzalez v. Mid-Continent Cas. Co., 969 F.3d 554 (5th Cir. 2020), Gilbert Gonzales (the insured) was a siding contractor. In 2013, the underlying plaintiff hired Gonzales to install new siding on his house. In 2016, the underlying plaintiff’s house was damaged in a fire. The underlying plaintiff sued Gilbert in Texas state court alleging that when Gonzalez installed the siding in 2013, he hammered nails through electrical wiring and created a dangerous condition that caused a fire three years later in 2016.
At the time Gilbert performed construction work, he was insured by Mid-Continent Casualty Company. Mid-Continent disclaimed coverage to Gonzales on the basis that the complaint unequivocally alleged that property was damaged in 2016 and there were no allegations that property damage occurred prior to 2016 or was continuing in nature.
Read the court decisionRead the full story...Reprinted courtesy of
Jeremy S. Macklin, Traub LiebermanMr. Macklin may be contacted at
jmacklin@tlsslaw.com
New York Shuts Down Majority of Construction
March 30, 2020 —
Laura Bourgeois LoBue & Matthew D. Stockwell - Gravel2Gavel Construction & Real Estate Law BlogDue to pressure from construction workers, officials, and some construction workers having tested positive for COVID-19, the Empire State Development Corp. (acting on behalf of Governor Cuomo) has frozen all construction in New York today, with the exception of work on hospitals and health care facilities, transit facilities, roads and bridges, affordable housing and homeless shelters.
As a result, commercial construction and condominium projects are on hold, with the exception of work that must be completed to prevent unsafe conditions. Until now, construction has been considered “essential” in New York.
Reprinted courtesy of
Laura Bourgeois LoBue, Pillsbury and
Matthew D. Stockwell, Pillsbury
Ms. LoBue may be contacted at laura.lobue@pillsburylaw.com
Mr. Stockwell may be contacted at matthew.stockwell@pillsburylaw.com
Read the court decisionRead the full story...Reprinted courtesy of
Vacation during a Project? Time for your Construction Documents to Shine!
October 09, 2023 —
Melissa Dewey Brumback - Construction Law in North CarolinaHappy Lazy Day Everyone! What’s that? You didn’t know that August 10th is considered National Lazy Day? Well, it is. And it ties nicely in with today’s theme: how to take a vacation during the thick of the construction project.
Everyone needs a break. You are no different. It can seem, however, that it is impossible to disconnect from the ongoing onslaught of questions, requests for information, change orders, pay applications, and the like. But you can. The key to taking–and enjoying–your vacation is to plan ahead. This is the time for your construction documents to shine. Make sure that your designs are on schedule; make sure that the change orders and RFIs have been processed so there is no backlog. And make sure that your second in command is familiar enough with the day to day details to step into your shoes for the duration.
Then– be sure to give everyone notice. Is it any of their business that you are taking some time off? No. However, everyone procrastinates. So, if you give the entire team advance notice that you will be “off grid” starting on X date, they will be more inclined to get pending issues to you sooner rather than later. They won’t want to be stalled on progress, and with a heads up on when you are out of pocket, they will make it a priority to get requests to you ahead of your departure date.
Read the court decisionRead the full story...Reprinted courtesy of
Melissa Dewey Brumback, Ragsdale LiggettMs. Brumback may be contacted at
mbrumback@rl-law.com
Negligence Claim Not Barred by Gist of the Action Doctrine
February 18, 2015 —
Tred R. Eyerly – Insurance Law HawaiiThe Pennsylvania Supreme Court held that the insureds' negligence claim survived because it was not based upon breach of a duty created by the policy, but upon the alleged breach of a duty imposed by tort law. Bruno v. Erie Ins. Co,, 2014 Pa. LEXIS 3319 (Dec. 15, 2014).
After purchasing their home, the insureds obtained a homeowner's policy from Erie. A separate endorsement covered loss to the property caused by "fungi," which was included as any form of mold. The endorsement obligated Erie to pay up to $5,000 for loss caused by mold. The policy required Erie to pay the cost of testing the air to confirm the absence or presence of mold. If mold was present, Erie was to pay for the cost of removal, including the cost of tearing out any part of the property needed to gain access to the mold.
While renovating the basement, the insureds discovered two areas of black mold in close proximity to leaking water pipes. Erie was notified and sent an adjuster to view the mold. The adjuster took no action, but returned a couple of days later with an engineer. The adjuster and engineer informed the insureds that the mold was harmless and that health problems associated with mold were a media frenzy and overblown.
Read the court decisionRead the full story...Reprinted courtesy of
Tred R. Eyerly, Insurance Law HawaiiMr. Eyerly may be contacted at
te@hawaiilawyer.com