Bar to Raise on Green Standard
November 07, 2012 —
CDJ STAFFNext June, members of the U.S. Green Building Council will be voting on changes to the LEED green building standard. “The bar is getting raised,” said Navad Malin of BuildingGreen, a consulting and publishing firm, in an article in USA Today. Under the proposed guidelines, builders would have to project energy and water use for five years as part of the certification process. However, if the occupants aren’t as green as the builders anticipated, the buildings will not lose their certification.
The new rules will include higher energy standards, award points for avoiding potentially hazardous materials, and even determine what kind of plumbing items can be used.
Read the court decisionRead the full story...Reprinted courtesy of
Exception to Watercraft Exclusion Does Not Apply
September 24, 2014 —
Tred R. Eyerly – Insurance Law HawaiiThe court determined that an additional insured was not entitled to coverage despite an exception to the watercraft exclusion. Holden v. U.S. United Ocean Serv., LLC, 2014 U.S. App. LEXIS 15954 (5th Cir. Aug. 19, 2014).
United entered a contract with Buck Kreihs Company, Inc. under which Buck Kreihs would perform ship-repair work for United. Under the contract, Buck Kreihs would indemnify United for all liabilities arising out of the work or services performed by Buck Kreihs for United. The contract further provided that Buck Kreihs was to procure general liability coverage and name United as an additional insured. Buck Kreihs did so under a policy issued by St. Paul.
Holden, an employee of Buck Kreihs, was injured while preparing to remove a gangway that led from a dock at Buck Kreihs's facility to a barge owned by United. Holden sued United, which tendered to St. Paul as an additional insured. St. Paul denied coverage under the policy's watercraft exclusion. Holden and United settled. United pursued its third party suit against St. Paul. The district court granted summary judgment to St. Paul.
Read the court decisionRead the full story...Reprinted courtesy of
Tred R. Eyerly, Insurance Law HawaiiMr. Eyerly may be contacted at
te@hawaiilawyer.com
New Jersey Supreme Court Issue Important Decision for Homeowners and Contractors
September 08, 2016 —
Wally Zimolong – Supplemental ConditionsThe lack of insurance coverage for a contractor’s faulty workmanship is the bane of both homeowners looking to recover damage for defective work and contractors seeking to defend against such claims. In many states, like Pennsylvania, courts hold that faulty workmanship is not an “occurrence” that is covered by a standard commercial general liability insurance policy. In other words, courts hold that CGL policies cover damage to other property not part of the construction project itself.
This is problematic for both the homeowner and the insured. For the homeowner, the lack of a policy providing indemnification sometimes means the homeowner is left trying to collect against a defendant, who is otherwise but has little to no assets against which to collect a judgment. For the contractor, the lack of a policy providing coverage means that assets are at risk and it could be forced to spend significant sums in attorneys fees defending the case.
Read the court decisionRead the full story...Reprinted courtesy of
Wally Zimolong, Zimolong LLCMr. Zimolong may be contacted at
wally@zimolonglaw.com
Tennessee Court: Window Openings Too Small, Judgment Too Large
November 18, 2011 —
CDJ STAFFThe Tennessee Court of Appeals has issued a ruling in the case of Dayton v. Ackerman, upholding the decision of the lower court, even as they found that the award was incorrectly computed. The Daytons purchased a house that had been designed and built by the Ackermans, who operated a construction business. The court noted that the warranty with the house promised that “for a period of 60 days, the following items will be free of defects in materials or workmanship: doors (including hardware); windows; electric switches; receptacles; and fixtures; caulking around exterior openings; pluming fixtures; and cabinet work.”
Soon, the Daytons began to experience problems with the house. Many were addressed by the Ackermans, but the Daytons continued to have problems with the windows. Neither side could specify a firm date when the Ackermans were contacted by the Daytons about the window problems. The Ackermans maintained that more than two years passed before the Daytons complained about the windows. The lower court found the Daytons more credible in this.
Initially, the Daytons included the window manufacturer in their suit, but after preliminary investigations, the Daytons dropped Martin Doors from their suit. Martin Doors concluded that the windows were improperly installed, many of them “jammed into openings that were too small for them.”
After the Daytons dismissed Martin Doors, the Ackermans sought to file a third party complaint against them. This was denied by the court, as too much time had elapsed. The Ackermans also noted that not all of the window installations were defective, however, the courts found that the Daytons ought not to have mismatched windows.
Unfortunately for the Daytons, the window repair was done incorrectly and the windows were now too small for the openings. The firm that did the repair discounted the windows and Daytons concealed the problem with plantation shutters, totalling $400 less than the original lowest estimate. However, the appeals court noted that it was here that the trial court made their computation error. Correcting this, the appeals court assessed the Ackermans $12,016.20 instead of $13,016.20.
Finally, the Ackerman’s expert was excluded as he had changed his testimony between deposition and trial. The trial reviewed the expert’s testimony and had it been admissible, it would not have changed the ruling.
Read the court’s decision…
Read the court decisionRead the full story...Reprinted courtesy of
Will The New U.S.-Mexico-Canada Trade Deal Calm Industry Jitters?
January 13, 2020 —
Bruce Buckley - Engineering News-RecordNews that House Democrats and the Trump administration have come to an agreement on the United States-Mexico-Canada Agreement (USMCA) provided a bit of calm in the storm over trade policies that have roiled the construction market since 2017.
Bruce Buckley, Engineering News-Record
ENR may be contacted at ENR.com@bnpmedia.com
Read the full story... Read the court decisionRead the full story...Reprinted courtesy of
It’s a COVID-19 Pandemic; It’s Everywhere – New Cal. Bill to Make Insurers Prove Otherwise
August 17, 2020 —
Scott P. DeVries & Andrea DeField - Hunton Andrews KurthOn June 29, in a development that may fundamentally change the landscape for California businesses which have sustained COVID-19 related business interruption loss, two California legislators amended pending legislation to address several of the most hotly contested issues regarding insurance recovery for these devastating losses.
The bill, Assembly Bill 1552, focuses on All-Risk property insurance policies. As amended, it would create a “rebuttable presumption” that COVID-19 was present on and caused physical damage to property which was the direct cause of business interruption. A similar rebuttable presumption would apply to orders of civil authority coverage and to ingress/egress coverage. The bill would further prohibit COVID-19 from being construed as a pollutant or contaminant for purposes of any policy exclusion unless the exclusion specifically referred to viruses. The bill would apply to any All-Risk policy in effect on or after March 4, 2020 and is written to satisfy the standards for an “urgency” statute, taking effect immediately upon being signed into law.
Reprinted courtesy of
Scott P. DeVries , Hunton Andrews Kurth and
Andrea DeField, Hunton Andrews Kurth
Mr. DeVries may be contacted at sdevries@HuntonAK.com
Ms. DeField may be contacted at adefield@HuntonAK.com
Read the court decisionRead the full story...Reprinted courtesy of
Considerations in Obtaining a Mechanic’s Lien in Maryland (Don’t try this at home)
December 21, 2020 —
Christopher G. Hill - Construction Law MusingsFor this week’s Guest Post Friday at Construction Law Musings I welcome Matthew Evans. Matt is the owner of Law Offices of Matthew S. Evans, III, LLC located in Annapolis, Maryland. He has practiced construction, real estate and land use law in Maryland and D.C. for thirteen years. Prior to opening his own firm in May 2011, Mr. Evans was a partner at a mid-sized firm in Anne Arundel County, Maryland. Mr. Evans lives in Historic Annapolis (only three short blocks from his office) with his wife Margaret, and three children, Matthew (5), Bo (4) and Peyton (2).
Some of the most common calls I get are from irate contractor or subcontractor clients who have not been paid demanding that I “lien the property”. Many times after calming the client down, I determine, to their dismay, that they are not entitled to a mechanic’s lien. In Maryland, the mechanic’s lien law is driven by statute, which contains specific requirements which must be met before the client is entitled to a lien.
Read the court decisionRead the full story...Reprinted courtesy of
The Law Office of Christopher G. HillMr. Hill may be contacted at
chrisghill@constructionlawva.com
Approaching Design-Build Projects to Avoid (or Win) Disputes
August 07, 2023 —
Stuart Eisler - Construction ExecutiveStakeholders engage in design-build projects believing the collaborative nature better aligns parties' interests and reduces overall risk exposure. Each of the lead parties bases this belief on different factors—the owner sees an opportunity to reduce change-order exposure and improve delivery times, the design-builder (or contractor) aims to control design volatility by ensuring project components match budgeted projections, and the designer intends to benefit by greater constructability review from the design-builder team and often additional time to detail designs. Rarely do design-build parties contemplate claims arising while initiating a project.
This being said, design-build projects carry unique, inherent risks due to the award of often fixed-price contracts utilizing incomplete, preliminary designs. As scopes creep and costs balloon, previously harmonious parties experience discord and lurking claims. While the majority of design-build projects are completed without major dispute, there are strategies available to further avoid disputes and prevail in those that are unavoidable.
Reprinted courtesy of
Stuart Eisler, Construction Executive, a publication of Associated Builders and Contractors. All rights reserved.
Read the court decisionRead the full story...Reprinted courtesy of