Failure to Consider Safety Element in Design Does Not Preclude Public Entity’s Discretionary Authority Under Design Immunity Defense
May 16, 2018 —
Garret Murai - California Construction Law BlogIn Rodriguez v. Department of Transportation, Case No. F074027 (March 27, 2018), the Court of Appeals for the Fifth District considered the following mind-twister: Can you knowingly approve something (which does not include something else) if you never considered the absence of that “something else?” Think about that for a moment . . . or, better yet, just read on.
Rodriguez v. Department of Transportation
In 2013, a pickup truck traveling westbound on State Route 152 toward Los Banos, California, ran off the road injuring Erik Rodriguez and the driver and killing another passenger. Rodriguez sued the California Department of Transportation (Caltrans) on the ground that the accident was caused by a dangerous condition on public property.
Read the court decisionRead the full story...Reprinted courtesy of
Garret Murai, Wendel Rosen Black & Dean LLPMr. Murai may be contacted at
gmurai@wendel.com
Building Growth Raises Safety Concerns
November 20, 2013 —
CDJ STAFFWith the resurgence of the construction industry, another trend is going up and it’s not good. The workplace fatality rate for the construction industry has increased for the first time since 2006, according to a new report from Marsh Risk Consulting, based on data from the U.S. Bureau of Labor Statistics.
The increase to 9.5 deaths per 100,000 workers is attributed to “an influx of new, inexperienced workers” and that “some contractors are stretching their hiring standards to meet project demands.”
Read the court decisionRead the full story...Reprinted courtesy of
No Coverage for Restoring Aesthetic Uniformity
December 10, 2015 —
Tred R. Eyerly – Insurance Law HawaiiThe court found there was no coverage regarding aesthetic uniformity between new materials installed after water damage occurred and the rest of the building. Great Am. Ins. Co. of New York v. The Towers of Quayside No. 4 Condominium Assoc., Case No. 15-CV-20056-King (U.S. Dist. Ct., S.D. Fla., Nov. 5, 2015).
The insured's high rise condominium suffered water damage when a valve on the air conditioning unit damaged the drywall, carpeting, baseboards, insulation and wallpaper in the east hallways of the eleventh floor and the floors below. Floors three through twenty-five had a uniform appearance by design with respect to the carpet, wallpaper, and woodwork in the common area hallways.
The insured submitted a claim under its property policy with Great American. A payment of $170,291.84 was made for damage to the east hallways of the eleventh floor and the floors below. The insured sought coverage to repair or replace undamaged carpeting, wallpaper, baseboards, and woodwork in (1) the west hallways and elevator landings of the eleventh floor and the floors below and in (2) floors twelve through twenty-five.The insured contended that the loss of aesthetic uniformity devalued the building and constituted a loss to the building.
Read the court decisionRead the full story...Reprinted courtesy of
Tred R. Eyerly, Insurance Law HawaiiMr. Eyerly may be contacted at
te@hawaiilawyer.com
Charges in Kansas Water Park Death
March 28, 2018 —
David Suggs - CDJ STAFFCaleb Schwab, a 10-year old boy was killed by decapitation on a water slide at a Kansas City water park, Schlitterbahn in 2016. Thirteen other people had suffered injuries on the ride prior to Caleb’s death ranging in severity from broken toes to concussions. Schlitterbahn employees have since claimed that park officials covered up past occurrences of water slide injuries.
Three people have been indicted in this case according to a CNN report by Marlena Baldacci, Sheena Jones and Hollie Silverman. Jeffrey Henry, the co-owner of the Schlitterbahn water park, Tyler Austin Miles, the park’s former director of operations and John Schooley.
Charges include second-degree murder, involuntary manslaughter, aggravated battery and aggravated child endangerment. Caleb suffered a fatal injury when the raft that he and the two women who were riding with him became airborne and contacted the netting attached overhead.
Investigators have found maintenance issues and ride design flaws that violate safety standards leading to lack of prevention of rafts becoming airborne during the ride. Caleb’s family will receive nearly $20 million in the settlement. Caleb’s father Scott, released a statement about placing full trust in the Attorney General Derek Schmidt who is presiding over the investigation and indictments.
Read the court decisionRead the full story...Reprinted courtesy of
AB 1701 Has Passed – Developers and General Contractors Are Now Required to Double Pay for Labor Due to Their Subcontractors’ Failure to Pay
October 19, 2017 —
Clayton T. Tanaka – Newmeyer & Dillion LLPOn September 13, 2017, the California State Legislators passed a bill that would make developers and general contractors responsible for subcontractors who fail to pay their employees even though they already paid the subcontractors for the work. Assembly Bill 1701 (AB 1701), sponsored by unions who represent carpenters and other building trades, would require general contractors to “assume, and [be] liable for . . . unpaid wage, fringe or other benefit payment or contribution, including interest owed,” which subcontractors owe their employees. Despite vehement opposition from the California Building Industry Association and the Associated General Contractors of California, this bill has been submitted to the Governor and is expected to be signed into law.
NEW REQUIREMENTS
Once signed, this bill would impose the following requirements under Labor Code section 218.7:
- Applies to All Private Works Contracts That Are Entered Starting January 1, 2018.
For private works contracts entered on or after January 1, 2018, a “direct contractor” (i.e., prime contractor or contractor who has direct contractual relationship with an owner) must assume and be liable for any debt which its subcontractor or a lower tier subcontractor incurs “for [a] wage claimant’s performance of labor included in the subject of the contract between the direct contractor and the owner.” (Lab. Code, § 218.7, subds. (a)(1) and (e).)
- The Labor Commissioner and Joint Labor-Management Cooperation Committees May Bring Action to Recover Unpaid Wages on Behalf of Wage Claimants.
The California Labor Commissioner and joint Labor-Management Cooperation Committees established under the federal Labor Management Cooperation Act of 1978 (29 U.S.C. § 175a) (typically comprised of labor unions and management) may bring a civil action against the direct contractor for unpaid wages owed to a wage claimant. (Lab. Code, § 218.7, subds. (b)(1) and (3).) The Labor Commissioner may also bring its claims through administrative hearings (Labor Code section 98) or by citations (Labor Code section 1197.1). (Lab. Code, § 218.7, subd. (b)(1).)
- Third Parties That Are Owed Fringe or Other Benefit Payments or Contribution on Behalf of Wage Claimants (Labor Unions) May Bring Action.
Third parties who are owed fringe or other benefit payments or contributions on a wage claimant’s behalf (e.g., labor unions) may bring a civil action against the direct contractor for such unpaid benefit payments or contributions. (Lab. Code, § 218.7, subd. (b)(2).)
- It Does Not Confer Wage Claimants With Any Right to Sue Direct Contractors.
AB 1701 gives the Labor Commissioner, Labor-Management Cooperation Committees and the unions standing to bring an action against the direct contractor, but it does not confer any private right of action by the wage claimants against the direct contractor.
- Labor-Management Cooperation Committees and Labor Unions Shall Recover as Prevailing Plaintiffs Their Attorneys’ Fees and Costs, Including Expert Fees.
For actions brought by Labor-Management Cooperation Committees or labor unions, “[t]he court shall award a prevailing plaintiff in such an action its reasonable attorney’s fees and costs, including expert witness fees.” (Lab. Code, § 218.7, subds. (b)(2)-(3).)
- Direct Contractor’s Property May Be Attached to Pay for Judgment.
AB 1701 authorizes the attachment of direct contractor’s property to pay for any judgment that is entered pursuant to this section. (Lab. Code, § 218.7, subd. (c).)
- One-Year Statute of Limitation to Bring Action under This Section.
Actions brought pursuant to this section must be filed within one year of the earliest of: (1) recordation of a notice of completion of the direct contract; (2) recordation of a notice of cessation of the work covered by direct contract; or (3) actual completion of work covered by direct contract. (Lab. Code, § 218.7, subd. (d).)
- Rights to Receive Payroll Records and Project Award Information from Subcontractors and to Withdraw All Payments Owed for Their Failure to Comply.
Upon the direct contractor’s request, subcontractors and lower tier subcontractors must provide payroll records and project award information. (Lab. Code, § 218.7, subds. (f)(1)-(2).) Direct contractor may withhold as “disputed” all sums owed if a subcontractor does not timely provide the requested records and information without specifying what is untimely and such failure to comply does not excuse direct contractor from any liability under this section. (Lab. Code, § 218.7, subds. (f)( 3) and (i).)
- Rights to Receive Payroll Records and Project Award Information from Subcontractors and to Withdraw All Payments Owed for Their Failure to Comply.
Upon the direct contractor’s request, subcontractors and lower tier subcontractors must provide payroll records and project award information. (Lab. Code, § 218.7, subds. (f)(1)-(2).) Direct contractor may withhold as “disputed” all sums owed if a subcontractor does not timely provide the requested records and information without specifying what is untimely and such failure to comply does not excuse direct contractor from any liability under this section. (Lab. Code, § 218.7, subds. (f)( 3) and (i).)
- Further Legislative Efforts on Subdivision (h) Are Expected in 2018.
Subdivision (h), which states that “[t]he obligations and remedies provided in this section shall be in addition to any obligations and remedies otherwise provided by law . . .” (emphasis added) is potentially misleading since the author and sponsor of the bill have indicated that the bill is not intended to punish direct contractors with liquidated damages or penalties. As such, further legislative efforts on subdivision (h) are expected in 2018.
ADDITIONAL CONSIDERATIONS
While workers should be paid for the work they perform, AB 1701 would place undue burden on general contractors to monitor their subcontractors’ payroll, confirm that all wages and benefits are paid timely and withhold disputed payments from non-compliant subcontractors. General contractors would also need to caution against the chain reaction that could result from such withholding, including work stoppage, increased change order requests, and an overall increase in construction costs. Finally, general contractors would need to brace themselves for at least a year after project completion against any union or a Labor-Management Cooperation Committee actions armed with a prevailing party’s right to recover attorneys’ fees and expert fees, for previously unidentified subcontractor or sub-subcontractor workers.
STRATEGIES DEVELOPERS AND GENERAL CONTRACTORS SHOULD LOOK FOR
In anticipation of AB 1701 being signed into law and its potentially harsh effects, developers and general contractors are advised to consult their attorneys for a review and revision of their existing contracts, to develop plans for accessing and monitoring subcontractor payroll records, and to consider strategies for mitigating claims that may be brought against them, as follows:
- Execute all pending agreements
before January 1, 2018 to avoid the effects of AB 1701;
- Include an audit provision
requiring subcontractors and sub-subcontractors to provide payroll records (at minimum, information set forth in Labor Code section 226) and project award information, regularly and/or upon request, with specific deadlines for such production, as subdivision (f) does not specify what is untimely;
- Include defense and indemnity provisions
that would require subcontractors to defend and indemnify the general contractor for claims that are brought pursuant to this section arising from labor performed by employees for subcontractors and sub-subcontractors, and require subcontractors to include a similar provision in their own contracts with sub-subcontractors that would require lower tier subcontractors to also defend and indemnify the general contractor for claims arising from their respective employees’ work;
- Require subcontractors to provide a payment bond and/or a letter of credit
to satisfy claims that are made against the general contractor under this section;
- Require personal guarantees
from owners, partners or key subcontractor personnel;
- Include withholding and back-charge provisions
that would allow general contractors to withhold or charge back the subcontractors for disputed amounts, for claims brought against them, and for failure to comply with the audit, bond, and guarantee requirements.
- Consider implementing a system to confirm evidence of payments,
such as signed acknowledgment of payment by each subcontractor and sub-subcontractor employees and by third parties entitled to recover fringe and other benefit payments or contribution, possibly working with electronic billing software providers to implement such system.
Clay Tanaka is a partner in the Newport Beach office of Newmeyer & Dillion, focusing on construction, real estate, business and insurance disputes in both California and Nevada. As a licensed civil engineer, Clay has significant experience in design and construction of all types of construction projects, which he has effectively utilized in his litigation, trial and arbitration practice to obtain great results for his clients. For questions related to AB1701, please contact Clay Tanaka (clay.tanaka@ndlf.com) or Newport Beach Partner Mark Himmelstein (mark.himmelstein@ndlf.com).
Read the court decisionRead the full story...Reprinted courtesy of
Clayton T. Tanaka, Newmeyer & Dillion LLPMr. Tanaka may be contacted at
clay.tanaka@ndlf.com
The Contractor’s Contingency: What Contractors and Construction Managers Need to Know and Be Wary Of
December 04, 2023 —
Skyler L. Santomartino - Peckar & Abramson, P.C.Contractors and construction managers who enter into cost reimbursable contracts subject to a guaranteed maximum price (GMP) are responsible for all project costs exceeding the GMP. For this reason, it is imperative that contractors negotiate and incorporate into the GMP a financial buffer that accounts for the unanticipated project costs that are not reimbursable as change orders or costs of the work. This is where the contractor’s contingency comes into play.[
1]
The contractor’s contingency is a vehicle that allows contractors to mitigate some of the risks inherent in GMP contracts. When drafted properly, a contingency clause allows the contractor and only the contractor to access funds set aside by the owner to address unpredictable or unknown project costs.
Read the court decisionRead the full story...Reprinted courtesy of
Skyler L. Santomartino, Peckar & Abramson, P.C.Mr. Santomartino may be contacted at
ssantomartino@pecklaw.com
Reminder: Know Your Contractor Licensing Rules
January 09, 2023 —
Christopher G. Hill - Construction Law MusingsIn the course of my construction law practice, I have the pleasure of speaking with and talking to contractors and subcontractors that are based in Virginia and also based in other states. With the more nationalized construction landscape due to the constricted construction economy, I have more and more interaction with the latter category.
When I get a call from an out of state contractor (often when that construction company has an issue), one of my first questions is always whether that contractor has obtained its contractors license here in Virginia. In most cases, the answer is “Yes” and we can move on. However, in some instances, the answer is no and we have to discuss the potential consequences.
Among the consequences for failure to obtain the proper contractor license prior to performing work in Virginia are as follows:
- Inability to record a mechanic’s lien
- Possible criminal charges
- Possible inability to collect for construction work performed
Read the court decisionRead the full story...Reprinted courtesy of
The Law Office of Christopher G. HillMr. Hill may be contacted at
chrisghill@constructionlawva.com
Edgewater Plans to Sue Over Pollution During Veterans Field Rehab
August 13, 2014 —
Beverley BevenFlorez-CDJ STAFFIn New Jersey, “Borough officials have announced plans to sue ‘all responsible parties’ over new contaminants inadvertently brought onto Veterans Field during soil remediation that was halted last year,” reported The Record.
According to The Record, Waterside Construction “trucked in contaminated crushed concrete” and has “been in mediation for months” with the borough over the issue.
“Waterside violated the sanctity of the public trust by improperly disposing of PCB waste materials at Veterans Field,” Timothy Corriston, special counsel to the borough, told The Record. “They believe that others are partly responsible. That is ultimately what will be litigated.”
Spokesman Alan Marcus wrote in an email to The Record, “Waterside continues to be willing to participate in mediation and hopes to reach an amicable settlement among all of the parties.”
Read the court decisionRead the full story...Reprinted courtesy of