3D Printing Innovations Enhance Building Safety
October 07, 2019 —
Mahmut Ekenel & Melissa Sanchez - Construction ExecutiveThe mention of 3D printing alone is enough to get people excited, often conjuring images of a desktop console that can download and create three dimensional objects such as prototypes, or mechanical parts. And yet, in recent years the technology has given way to a slight impatience, as people begin to wonder how and when it will have a direct impact on both their lifestyles and their businesses.
The construction industry has been quick to take advantage of these innovations, and the effects are tangible, especially regarding building safety. The 3D construction technology allows for several key advantages in terms of faster construction times, uncompromised quality of construction and lower costs—allowing for affordable dwellings to be quickly built for people in need.
These advantages also lead to safety improvements during the building process. The ability to accelerate construction time without requiring an increase in labor results in a fewer construction-related workplace injuries and a reduction in material waste, making it an environmentally friendly construction method as well.
ICC-Evaluation Service (ICC-ES), a subsidiary of the International Code Council (ICC) which develops model codes and standards (i.e. International Building Code, International Residential Code) and delivers a wide array of building safety services, has taken the lead on developing acceptance criteria to address building code compliance of 3D printed construction. Currently, 3D construction technology is not within the provisions of the International Building Code (IBC) or International Residential Code (IRC). The acceptance criteria introduces new compliance measures for interior and exterior 3D printed concrete walls (with and without structural steel reinforcement), load-bearing and non-load-bearing walls, and shear walls in one-story, single-unit, residential dwellings. The 3D walls are constructed by printing two outer layers of 3D concrete and then filling the core with 3D concrete to form a solid wall.
Reprinted courtesy of
Mahmut Ekenel & Melissa Sanchez, Construction Executive, a publication of Associated Builders and Contractors. All rights reserved.
Mr. Ekenel may be contacted at mekenel@icc-es.org
Ms. Sanchez may be contacted at msanchez@icc-es.org
Read the court decisionRead the full story...Reprinted courtesy of
US Appeals Court Halts OSHA Vaccine Mandate, Unclear How Long
November 15, 2021 —
Debra K. Rubin & Jeff Yoders - Engineering News-RecordThe U.S. Court of Appeals in New Orleans on Nov. 6 stayed the Biden administration's requirement that workers at U.S. companies with at least 100 employees be vaccinated against COVID-19 or be tested weekly, citing potential "grave statutory and constitutional" issues raised by opponents of the US Occupational Safety and Health Administration's emergency temporary standard announced on Nov. 4.
Reprinted courtesy of
Debra K. Rubin, Engineering News-Record and
Jeff Yoders, Engineering News-Record
Ms. Rubin may be contacted at rubind@enr.com
Mr. Yoders may be contacted at yodersj@enr.com
Read the full story... Read the court decisionRead the full story...Reprinted courtesy of
Edgewater Plans to Sue Over Pollution During Veterans Field Rehab
August 13, 2014 —
Beverley BevenFlorez-CDJ STAFFIn New Jersey, “Borough officials have announced plans to sue ‘all responsible parties’ over new contaminants inadvertently brought onto Veterans Field during soil remediation that was halted last year,” reported The Record.
According to The Record, Waterside Construction “trucked in contaminated crushed concrete” and has “been in mediation for months” with the borough over the issue.
“Waterside violated the sanctity of the public trust by improperly disposing of PCB waste materials at Veterans Field,” Timothy Corriston, special counsel to the borough, told The Record. “They believe that others are partly responsible. That is ultimately what will be litigated.”
Spokesman Alan Marcus wrote in an email to The Record, “Waterside continues to be willing to participate in mediation and hopes to reach an amicable settlement among all of the parties.”
Read the court decisionRead the full story...Reprinted courtesy of
How to Get Your Bedroom Into the Met Museum
February 23, 2016 —
James Tarmy – BloombergA dressing room, i.e., a large closet devoted explicitly to the putting on and taking off of clothing, has just gone on permanent display at the Metropolitan Museum of Art in New York. The room, labeled the Worsham-Rockefeller Dressing Room after its two previous owners, is a dizzying, gilded-age assemblage of competing wallpaper patterns, woodwork, and metal ornament.
Still. The Met has one of the largest and most important collections of art in the world: Why did a dressing room end up migrating from a house slated for demolition on West 54th Street to a museum's hallowed halls? And what, for that matter, did every owner of the three-dozen period rooms do to get their homes on display?
By narrating the history of the following rooms, three of the Met's curators have helped supply an answer to what it takes to get your bedroom into the Met.
Read the court decisionRead the full story...Reprinted courtesy of
James Tarmy, Bloomberg
Mexico Settles With Contractors for Canceled Airport Terminal
August 26, 2019 —
Eric Martin - BloombergMexico City's airport authority settled a dispute with builders on an 85 billion peso ($4.45 billion) contract for the terminal at a new Mexico City airport that President Andres Manuel Lopez Obrador canceled a month before taking office.
Grupo Aeroportuario Ciudad de la Mexico will pay 14.2 billion pesos, equivalent to 16.7% of the contract's total cost, to Constructora Terminal de Valle de Mexico, a consortium that includes Carlos Slim's Operadora Cicsa, the Communications and Transportation Ministry said in an emailed statement. The contracts represented 45% of the airport's total cost, the ministry said.
Read the court decisionRead the full story...Reprinted courtesy of
Eric Martin, Bloomberg
Sinking Buildings on the Rise?
July 01, 2019 —
Jason M. Adams - Gibbs GidenBy now everyone in the construction and insurance industries is familiar with the 58-story Millennium Tower building in San Francisco that has sunk 17 inches and tilted another 14 inches to the northwest. Another recent New York lawsuit alleges that a 58-story luxury Manhattan condo high-rise is also sinking and causing significant damage. With construction booming in the Southeast and other areas with questionable soils, sinking building cases may be on the rise. Given this reality, the issue of subsidence should be of paramount importance to every construction and insurance professional when insuring a project.
Most insurance carriers will include a subsidence and/or other earth movement exclusion on a commercial general liability ("CGL") quote for insurance as a matter of course. Construction professionals (owners/developers, general contractors, and subcontractors) or their brokers may be under the mistaken impression that they have no choice but to accept these subsidence exclusions as part of a standard construction policy. This is not the case. To the contrary, most insurance carriers are willing to remove subsidence exclusions if the underwriters are provided with acceptable geotechnical/soils reports when considering the project.
The insured construction professional often pushes back on the insurance carrier's request for soils reports because the insured sees the request as an unnecessary hassle, expense or unwelcome interference in the job. However, the carrier's soils review is designed to benefit everyone. If potential soils issues are discovered during the underwriting process they can be addressed at the outset of the project rather than after the project is built, which will typically cost substantially more to remedy. Moreover, a thorough analysis of the condition of the soils at the outset of the project allows the risk management team to recognize any potential issues and ensure that the proper coverage is obtained in order to provide protection down the road. Even if the insurance carrier charges more money to sign off on questionable soils after a review of the reports, the slight increase in premium is likely a worthwhile investment in the event of a subsidence loss.
The lesson is that the insured should not blindly accept a subsidence exclusion and should negotiate its removal. The insured should provide its broker and the insurance carrier the information they need in order to make a fully-informed decision as it pertains to the soils. Once the insurance carrier has had the opportunity to review and sign off on the condition of the soil, the carrier should feel comfortable enough to remove any subsidence exclusions or other similar earth movement limitations.
Subsidence is a relatively straightforward issue to deal with as long as the project team’s lawyers, brokers, risk managers and insurance company underwriters are working together toward the common goal of properly evaluating the risk and adequately insuring the project. This simple cooperative process between the entire risk management team could mean the difference between being covered or not covered in the event of a loss related to earth movement.
Jason M. Adams, Esq. is Senior Counsel at Gibbs Giden representing construction professionals (owners/developers, contractors, architects, etc.) in the areas of Construction Law, Insurance Law and Risk Management, Common Interest Community Law (HOA) and Civil Litigation. Adams is also a licensed property and casualty insurance broker and certified Construction Risk & Insurance Specialist (CRIS). Gibbs Giden is nationally and locally recognized by U. S. News and Best Lawyers as among the “Best Law Firms” in both Construction Law and Construction Litigation. Chambers USA Directory of Leading Lawyers has consistently recognized Gibbs Giden as among California’s elite construction law firms. Mr. Adams can be reached at jadams@gibbsgiden.com.
The content contained herein is published online for informational purposes only, may not reflect the most current legal developments, verdicts or settlements, and does not constitute legal advice. Do not act on the information contained herein without seeking the advice of licensed counsel. The transmission of information by email, or any transmission or exchange of information over the Internet, or by any of the included links is not intended to create and does not constitute an attorney-client relationship. This publication may not be reproduced or used in whole or in part without written consent of the author. Copyright 2019 ©
Read the court decisionRead the full story...Reprinted courtesy of
How Does Weather Impact a Foundation?
December 27, 2021 —
Brent Pearson - Construction ExecutiveWhen it comes to commercial properties, it pays to be prepared. However, there are few things as unpredictable as the weather. With there being several weeks left in hurricane season, the weather can have quite an impact on the foundations of different properties. Whether it’s a new home or a century-old commercial property, preserving the integrity and safety of the structure is paramount. For those in construction looking to learn more about how the weather can sway a foundation, below are several examples along with tips on prevention.
Rain, Rain Go Away!
Hurricanes are known for bringing strong winds and plenty of rain. This can spell disaster for buildings with weak foundations. Torrential downpours can cause wet and weak soil. Too much rain—whether generated by hurricanes or frequent storms—can negatively impact the foundations of commercial properties and homes as well. It can also cause the soil to weaken, which can lead to a foundation sinking into the ground. For those that may have crawl spaces underneath their properties, heavy rains may cause water to seep under and into it. Water will sit in the crawl space, and it could take days or even weeks to dry out, causing moisture and possible mold damage.
Reprinted courtesy of
Brent Pearson, Construction Executive, a publication of Associated Builders and Contractors. All rights reserved.
Read the court decisionRead the full story...Reprinted courtesy of
Claim for Collapse After Demolition of Building Fails
January 09, 2023 —
Tred R. Eyerly - Insurance Law HawaiiAfter several city citations and the eventual demolition of the insureds' apartment building, their claim for coverage based on collapse was unsuccessful. Barker v. AmGuard Ins. Co., 2022 U.S. Dist. LEXIS 202069 (W.D. Mo. Nov. 7, 2022).
The plaintiffs purchased a three-story multi-family apartment building on March 9, 2009. Prior to the purchase, steel beams were installed in the basement along the east and south walls. By 2013, the south and east walls were leaning.
On March 13, 2017, the city building inspector observed "the foundation failing in several areas and deflection in the south wall." The building inspector issued a citation for a pubic nuisance in violation of the City Code. This was followed by several more citations against plaintiffs. The plaintiffs' inspector reported the basement walls were experiencing "extensive lateral deflections primarily due to the inadequate design of the basement walls."
Plaintiffs understood the issues to be "cosmetic.'" They had no work done on the property besides aesthetic upgrades. After additional citations were entered, the building was ordered demolished.
Read the court decisionRead the full story...Reprinted courtesy of
Tred R. Eyerly, Damon Key Leong Kupchak HastertMr. Eyerly may be contacted at
te@hawaiilawyer.com