Federal Magistrate Judge Recommends Rescission of Policies
February 12, 2024 —
Craig Rokuson - Traub LiebermanIn the recent case of Union Mut. Fire Ins. Co. v. 142 Driggs LLC, 2023 U.S. Dist. LEXIS 220393, Magistrate Judge Lois Bloom of the United States District Court for the Eastern District of New York recommended granting the insurer's default judgment and holding that of three policies issued to 142 Driggs LLC ("Driggs") be rescinded ab initio.
Driggs had represented on its insurance applications that it did not provide parking to anyone other than itself, tenants, and its guests at the subject insured premises. However, Union Mutual learned that Driggs had been renting out three garages to non-tenants. Second, Driggs represented that the mercantile square footage was around 1,000 square feet, when in actuality, it was larger than allowed under the policies.
Union Mutual provided underwriting guidelines in connection with its default motion, which state that "parking provided for anyone other than the insured, tenants and their guests," presents an "unacceptable risk." The guidelines also state that answering yes to any "preliminary application questions (which presumably included those regarding mercantile square footage and parking) is an "unacceptable risk." The court held that these guidelines supported a finding that Driggs made material misrepresentation and that Union Mutual relied on these misrepresentations in issuing the policies. The court, as such, recommended that the policies at issue be rescinded from inception.
Read the court decisionRead the full story...Reprinted courtesy of
Craig Rokuson, Traub LiebermanMr. Rokuson may be contacted at
crokuson@tlsslaw.com
Baltimore Bridge Collapse Occurred After Ship Lost Power Multiple Times
May 28, 2024 —
Allyson Versprille - BloombergThe container ship that rammed into Baltimore’s Francis Scott Key Bridge in March lost power multiple times on both the day of the fatal accident and the day before, according to a preliminary report.
The Dali, which sails under the flag of Singapore, lost power twice on March 26 before hitting the bridge and causing it to collapse, killing six construction workers who were on the structure at the time. The first blackout was caused when electrical breakers powering most of the vessel’s equipment and lighting unexpectedly tripped, the National Transportation Safety Board said in a report Tuesday.
The crew eventually was able to restore electrical power, but then a second blackout occurred only 0.2 miles from the bridge. They regained power, but the ship lacked the propulsion needed to avoid striking the bridge, safety inspectors found.
Read the court decisionRead the full story...Reprinted courtesy of
Allyson Versprille, Bloomberg
Colorado Court of Appeals Decides the Triple Crown Case
January 17, 2014 —
Berkeley W. Mann, Jr. – Higgins, Hopkins, McLain & Roswell, LLCIn an earlier blog post, I discussed the case of Triple Crown Observatory Village Assn., Inc. v. Village Homes of Colorado, Inc., et al (2013 WL 5761028) because it presented the rare case where the Colorado Court of Appeals accepted an interlocutory appeal. Notably, the interlocutory appeal resulted from dismissal of the HOA case in which the trial judge directed the parties to arbitrate in lieu of a jury trial, under the declaration of covenants, conditions, and restrictions that governed the community. The Court of Appeals decided the case on its merits on November 7, 2013, and its decision can be found at 2013 WL 6502659. (Note: this presently unpublished opinion may be subject to further appeal to the Colorado Supreme Court.)
The case resulted from an attempt by the HOA’s counsel to amend the mandatory arbitration provisions of the declarations before it filed suit. This amendment process took the form of soliciting signature votes of homeowners on a revocation resolution to repeal the specific provisions of the declarations that provided mandatory, binding arbitration as the sole remedy for disputes between the HOA and the developer and/or general contractor. The declarations required that 67% of homeowners vote in favor of amendment in order to modify the declarations.
Read the court decisionRead the full story...Reprinted courtesy of
Berkeley W. Mann, Jr., Higgins, Hopkins, McLain & Roswell, LLCMr. Mann may be reached at
mann@hhmrlaw.com
Is Your Construction Business Feeling the Effects of the Final DBA Rule?
June 04, 2024 —
Nathaniel Peniston - Construction ExecutiveThe Biden administration’s final rule “Updating the Davis-Bacon and Related Acts Regulations” took effect on Oct. 23, 2023. In “the first comprehensive regulatory review in nearly 40 years,” the Department of Labor has returned to the definition of “prevailing wage” it used from 1935 to 1983—before Microsoft released the first Windows operating system.
Construction industry leaders must be aware that this is the most comprehensive review and overhaul of the act in 40 years; with it, the DOL has attempted to modernize its approach to wage creation and fringe benefit allocation. There are more than 50 procedural changes to the act, which means it is very important for contractors to be aware of wage classifications when bidding, performing work on Davis-Bacon Act projects and using applicable fringe dollars for bona fide benefits.
UNDERSTANDING THE CHANGES
Some of the critical adjustments included in the final rule that contractors should be aware of include:
Wage determination changes during a project: Historically, contractors could rely on the wage determinations used to win a project for the life of the project. However, the final rule now requires the contractor to use current wage determinations when a contract is changed or extended. The DOL “proposed this change because—like a new contract—the exercise of an option requires the incorporation of the most current wage determination.”
Reprinted courtesy of
Nathaniel Peniston, Construction Executive, a publication of Associated Builders and Contractors. All rights reserved.
Read the court decisionRead the full story...Reprinted courtesy of
Mr. Peniston may be contacted at
npeniston@fbg.com
Michigan Supreme Court Finds Faulty Subcontractor Work That Damages Insured’s Work Product May Constitute an “Occurrence” Under CGL Policy
November 02, 2020 —
Jason Taylor - Traub Lieberman Insurance Law BlogIn Skanska USA Bldg. Inc. v. M.A.P. Mech. Contractors, Inc., 2020 WL 3527909 (Mich. June 29, 2020), the Michigan Supreme Court addressed whether unintentionally faulty subcontractor work that damages an insured’s work product constitutes an “accident” under a commercial general liability insurance policy. In aligning itself with a growing number of jurisdictions, the Michigan Supreme Court answered, “yes.” In Skanska, a construction manager brought an action against a commercial general liability (CGL) insurer seeking coverage as additional insured for the cost of repairs to correct faulty work performed by its subcontractor in renovation of medical center. In 2009, the construction manager hired MAP to install a steam boiler and related piping for the medical center’s heating system. MAP’s installation included several expansion joints, which it was later discovered, were installed backward. Significant damage to concrete, steel, and the heating system occurred as a result. The construction manager performed the work of repairing and replacing the damaged property to the tune of $1.4 million, and submitted a claim to MAP’s CGL insurer, Amerisure, seeking coverage as an additional insured.
Amerisure denied the claim contending that MAP’s defective construction was not a covered “occurrence” within the CGL policy. The policy defined “occurrence” as “an accident, including continuous or repeated exposure to substantially the same general harmful conditions,” but did not define the term “accident.” The trial court looked to the Court of Appeal’s decision in Hawkeye-Sec. Ins. Co. v. Vector Const. Co., 185 Mich. App. 369 (1990), which defined “accident” as “…a result which is not anticipated and…takes place without the insured’s foresight or expectation and without design or intentional causation on his part.” But, again citing Hawkeye, the trial court concluded that “[d]efective workmanship, standing alone, is not an occurrence within the meaning of a[ ] general liability insurance contract[;] an occurrence exists where the insured’s faulty work product damages the property of another.”
Read the court decisionRead the full story...Reprinted courtesy of
Jason Taylor, Traub LiebermanMr. Taylor may be contacted at
jtaylor@tlsslaw.com
Want to Build Affordable Housing in the Heart of Paris? Make It Chic.
November 01, 2022 —
Marie Patino & Kriston Capps - BloombergThe project at 12 Rue Jean-Bart is a modest one, just eight units of affordable housing on a narrow lot in Paris near the Luxembourg Gardens. The social housing project nevertheless caused a stir with neighbors in the 6th arrondissement, one of the city’s more affluent areas.
When local politicians backing the project came to visit the building during its construction, neighbors shouted from windows across the street that it was a shame to build social housing here, according to Jean-Christophe Quinton, the Paris-based architect who designed the small in-fill development.
Local resistance was a persistent feature of the project throughout its three-year-long construction, Quinton says; the building regularly faced harsh scrutiny in local newspaper Le Parisien.
Reprinted courtesy of
Marie Patino, Bloomberg and
Kriston Capps, Bloomberg Read the court decisionRead the full story...Reprinted courtesy of
Traub Lieberman Attorneys Lisa M. Rolle and Vito John Marzano Secure Dismissal of Indemnification and Breach of Contract Claims Asserted against Subcontractor
November 24, 2019 —
Lisa M. Rolle & Vito John Marzano - Traub Lieberman PerspectivesOn August 7, 2019, TLSS Partner Lisa M. Rolle and associate Vito John Marzano obtained a dismissal of all claims on behalf of their client, the subfloor subcontractor at the worksite, in a severed action filed in the Supreme Court of the State of New York, County of Kings.
In April 2014, plaintiff commenced suit against several defendants, including the general contractor, after he sustained an injury when he fell through temporary plywood while installing a staircase at a worksite in Brooklyn. In May 2018, plaintiff filed a note of issue and certified the matter as ready for trial. Immediately thereafter, the general contractor initiated a second third-party action against the subcontractor seeking common-law and contractual indemnification and breach of contract. The Court subsequently granted Traub Lieberman’s motion to sever the second third-party action and instructed the general contractor to file a new action.
After the general contractor recommenced suit, Traub Lieberman, on behalf of its client, the subcontractor, immediately moved to dismiss for failure to state a cause of action. In relevant part, Traub Lieberman pointed to the deposition testimony of the general contractor’s principal to establish that the subcontractor had finished its work on the permanent subfloor no less ten months to over a year prior to plaintiff’s accident, and that the subfloor required no alteration, repair or maintenance prior to or as a result of plaintiff’s accident. Further, the general contractor’s testimony pointed to work performed by another subcontractor that directly resulted in plaintiff’s injuries. It was also brought to the Court’s attention that plaintiff had testified that he fell through a temporary plywood floor, and that the subcontractor had only installed a permanent subfloor.
Reprinted courtesy of
Lisa Rolle, Traub Lieberman and
Vito John Marzano, Traub Lieberman
Ms. Rolle may be contacted at lrolle@tlsslaw.com
Mr. Marzano may be contacted at vmarzano@tlsslaw.com
Read the court decisionRead the full story...Reprinted courtesy of
On Rehearing, Fifth Circuit Finds Contractual-Liability Exclusion Does Not Apply
November 26, 2014 —
Tred R. Eyerly – Insurance Law HawaiiOn rehearing, the Fifth Circuit determined that the contractual-liability exclusion did not apply to bar coverage for damage caused by the insured contractor to the home it constructed. Crownover v. Mid-Continent Cas. Co., 2014 U.S. App. LEXIS 20727 (5th Cir. Oct. 29, 2014).The court withdrew its prior opinion, summarized here.
Arrow Development, Inc. contracted with the Crownovers to construct a home. The contract had a warranty-to-repair clause, which, in paragraph 23.1, provided that Arrow would "promptly correct work . . . failing to confirm to the requirements of the Contract Documents." After the Crownovers moved in, cracks began to appear in the walls and foundation of the home. Additional problems with the heating, ventilation, and air conditioning ("HVAC") caused leaking in the exterior lines and air ducts inside the home. To compensate for defects in the HVAC system, the system's mechanical units ran almost continuously in order to heat or cool the home. Because they were overburdened, the mechanical units had to be replaced. The Crownovers paid several hundred thousand dollars to fix the problems with the foundation and HVAC system.
Read the court decisionRead the full story...Reprinted courtesy of
Tred R. Eyerly, Insurance Law HawaiiMr. Eyerly may be contacted at
te@hawaiilawyer.com