L.A.’s Modest Solution to the ‘Missing Middle’ Housing Problem
May 24, 2021 —
Kriston Capps - BloombergPractical ideas aren’t often the stuff of architecture contests. Right off the bat, that set Los Angeles’s Low-Rise design challenge apart.
A project led by the mayor’s office and the city’s chief design officer, Christopher Hawthorne, Low-Rise asked entrants to reimagine what an L.A. urban landscape with abundant housing could look like in the years to come. The organizers wanted the participating designers to think about their submissions the way they might approach a project for a local client or community. The results, which were unveiled this week, don’t look like future-forward science fiction, but rather doable local solutions to a thorny problem: the stubborn lack of affordable options across the city.
Read the court decisionRead the full story...Reprinted courtesy of
Kriston Capps, Bloomberg
No Third-Quarter Gain for Construction
November 18, 2011 —
CDJ STAFFThe Associated Builders and Contractors released their analysis of construction work under contract and found that there was no increase in construction backlog from the second quarter of 2011. There was still improvement, however, over 2010, as the third quarter backlog is 16.3 percent higher than that of a year ago.
The current backlog is 8.1 months, which according to Anirban Basu, the chief economist of the ABC, “is consistent with flat construction spending.” He noted that less than 8 months indicated a decline.
Read the full story…
Read the court decisionRead the full story...Reprinted courtesy of
Home Prices Rose in Fewer U.S. Markets in Fourth Quarter
February 12, 2014 —
Prashant Gopal – BloombergPrices for single-family homes rose in 73 percent of U.S. cities in the fourth quarter, fewer than in the previous three months, as surging values in the past two years started to reduce affordability.
The median transaction price for an existing home climbed from a year earlier in 119 of 164 metropolitan areas measured, the National Association of Realtors said in a report today. In the third quarter, 88 percent of markets had increases.
While tight inventories and improving employment are bolstering the housing recovery, home-price gains are poised to decelerate as an increase in mortgage rates from record lows cuts into affordability. Values have been rising faster than incomes, particularly in the West, the Realtors group said.
Read the court decisionRead the full story...Reprinted courtesy of
Prashant Gopal, BloombergMr. Gopal may be contacted at
pgopal2@bloomberg.net
Sometimes You Just Need to Call it a Day: Court Finds That Contractor Not Entitled to Recover Costs After Public Works Contract is Invalidated
June 29, 2020 —
Garret Murai - California Construction Law BlogJanuary was a tough month in the courts for Hensel Phelps Construction Company. Hot off the heels of Hensel Phelps Construction Co. v. Superior Court, a case concerning the 10-year statute of limitations under Civil Code section 941, comes Hensel Phelps Construction Co. v. California Department of Corrections and Rehabilitation, Case No. B293427 (January 28, 2020), a bid dispute case . . .
The Tale of a Bid, a Bid Protest, and Two Cases
A. The Bid and Bid Protest
On March 15, 2015, the California Department of Corrections and Rehabilitation (CDCR) issues an Invitation for Bid for the HVAC project at the Ironwood State Prison. The deadline to submit bids was April 30, 2015. Hensel Phelps Construction Co. submitted a timely bid and was determined to be the “apparent low bidder” with a bid of $88,160,000.
Read the court decisionRead the full story...Reprinted courtesy of
Garret Murai, Nomos LLPMr. Murai may be contacted at
gmurai@nomosllp.com
3D Printing Innovations Enhance Building Safety
October 07, 2019 —
Mahmut Ekenel & Melissa Sanchez - Construction ExecutiveThe mention of 3D printing alone is enough to get people excited, often conjuring images of a desktop console that can download and create three dimensional objects such as prototypes, or mechanical parts. And yet, in recent years the technology has given way to a slight impatience, as people begin to wonder how and when it will have a direct impact on both their lifestyles and their businesses.
The construction industry has been quick to take advantage of these innovations, and the effects are tangible, especially regarding building safety. The 3D construction technology allows for several key advantages in terms of faster construction times, uncompromised quality of construction and lower costs—allowing for affordable dwellings to be quickly built for people in need.
These advantages also lead to safety improvements during the building process. The ability to accelerate construction time without requiring an increase in labor results in a fewer construction-related workplace injuries and a reduction in material waste, making it an environmentally friendly construction method as well.
ICC-Evaluation Service (ICC-ES), a subsidiary of the International Code Council (ICC) which develops model codes and standards (i.e. International Building Code, International Residential Code) and delivers a wide array of building safety services, has taken the lead on developing acceptance criteria to address building code compliance of 3D printed construction. Currently, 3D construction technology is not within the provisions of the International Building Code (IBC) or International Residential Code (IRC). The acceptance criteria introduces new compliance measures for interior and exterior 3D printed concrete walls (with and without structural steel reinforcement), load-bearing and non-load-bearing walls, and shear walls in one-story, single-unit, residential dwellings. The 3D walls are constructed by printing two outer layers of 3D concrete and then filling the core with 3D concrete to form a solid wall.
Reprinted courtesy of
Mahmut Ekenel & Melissa Sanchez, Construction Executive, a publication of Associated Builders and Contractors. All rights reserved.
Mr. Ekenel may be contacted at mekenel@icc-es.org
Ms. Sanchez may be contacted at msanchez@icc-es.org
Read the court decisionRead the full story...Reprinted courtesy of
AMLO Hits Back at Vulcan, Threatens to Use Environmental Decree
December 04, 2023 —
Maya Averbuch & Eric Martin - BloombergMexico’s president threatened to declare a disputed property owned by
Vulcan Materials Co. an environmentally protected area, after failing to reach an agreement with the US construction firm.
Andres Manuel Lopez Obrador said Vulcan continued work at the site even while in talks with his government over its potential purchase of the property, which was occupied by Mexican marines in March. Accusing the company of “vile trickery,” AMLO — as the president is known — told reporters Friday that he would act by decree if necessary to halt the destruction in “one of the most beautiful areas in the world.”
His comments came a day after Bloomberg reported that the Alabama-based firm was seeking the Biden administration’s protection from what it sees as the
threat of a hostile takeover of its property. The 2,400 hectare (5,930 acre) plot south of the resort city of Playa del Carmen includes a port and a quarry.
Reprinted courtesy of
Maya Averbuch, Bloomberg and
Eric Martin, Bloomberg Read the court decisionRead the full story...Reprinted courtesy of
Construction Law Client Alert: California’s Right to Repair Act (SB 800) Takes Another Hit, Then Fights Back
February 25, 2014 —
Steven M. Cvitanovic and Whitney L. Stefko - Haight Brown & Bonesteel, LLPLast week, the California appellate courts decided two cases with ramifications under the Right to Repair Act. The first case, Burch, addresses whether the Right to Repair Act is the exclusive remedy for the homeowner. The second case, KB Home, addresses a situation where a homeowner or the homeowner's insurer fails to follow the procedures under the Right to Repair Act.
Last August, the Fourth Appellate District announced its decision in Liberty Mutual Ins. Co. v. Brookfield Crystal Cove LLC (2013) 219 Cal.App.4th 98 holding that SB 800 is not a homeowner’s exclusive remedy in situations where defects cause actual damage. Many lawyers believed that Liberty Mutual would be a one-off because of its facts – it was a subrogation case brought by an insurance company. So much for that.
Now the Second Appellate District is getting into the act.
In Burch v. The Superior Court of Los Angeles County, et al., the Second Appellate District overturned an order granting summary adjudication in favor of a developer, general contractor, and their respective owners, in a construction defect action brought by a residential homeowner. The trial court found that the Right to Repair Act precluded the homeowner’s negligence and implied warranty claims but the Court of Appeal reversed.
Reprinted courtesy of
Steven M. Cvitanovic, Haight Brown & Bonesteel, LLP and
Whitney L. Stefko, Haight Brown & Bonesteel, LLP
Mr. Cvitanovic may be contacted at scvitanovic@hbblaw.com, Ms. Stefko may be contacted at wstefko@hbblaw.com
Read the court decisionRead the full story...Reprinted courtesy of
Real Estate & Construction News Round-Up 04/06/22
April 11, 2022 —
Pillsbury's Construction & Real Estate Law Team - Gravel2Gavel Construction & Real Estate Law BlogA growing proptech startup aims to pre-emptively identify needed home repairs, 3D-printed homes could become a workable solution to the housing shortage, and more.
- Concerns about a housing-market crash are growing as the Fed begins to hike interest rates, leaving industry experts to speculate on what’s next for the U.S. housing bubble. (William Edwards, Insider)
- Real-estate sales in Manhattan topped $7 billion in the first quarter of 2022, with the average price of apartments jumping 19% over the previous year. (Robert Frank, CNBC)
- Proptech startup DwellWell claims to have produced the first “check engine light” that can pre-emptively diagnose needed home repairs. (T.P. Yeatts, The Real Deal)
Read the court decisionRead the full story...Reprinted courtesy of
Pillsbury's Construction & Real Estate Law Team