California Court of Appeal Holds That the Right to Repair Act Prohibits Class Actions Against Manufacturers of Products Completely Manufactured Offsite
February 06, 2019 —
Gus Sara - The Subrogation StrategistIn Kohler Co. v. Superior Court, 29 Cal. App. 5th 55 (2018), the Second District of the Court of Appeal of California considered whether the lower court properly allowed homeowners to bring class action claims under the Right to Repair Act (the Act) against a manufacturer of a plumbing fixture for alleged defects in the product. After an extensive analysis of the language of the Act, the court found that class action claims under the Act are not allowed if the product was completely manufactured offsite. Since the subject fixture was completely manufactured offsite, the Court of Appeal reversed the lower court’s decision. The court’s holding establishes that rights and remedies set forth in the Right to Repair Act are not available for class action claims alleging defects in products completely manufactured offsite.
In Kohler Co., homeowners instituted a class action against Kohler, the manufacturer of water pressure and temperature regulating valves that were installed into their homes during original construction. The class action was filed on behalf of all owners of residential dwellings in California in which these Kohler valves were installed as part of original construction. The complaint asserted, among other claims, a cause of action under the Act. Kohler filed a motion for anti-class certification on the ground that causes of actions under the Act cannot be certified as a class action. The trial court denied the motion with respect to the Act but certified its ruling for appellate review. Kohler filed a petition with the Court of Appeals, arguing that certain sections of the Act explicitly exclude class action claims under the Act.
Read the court decisionRead the full story...Reprinted courtesy of
Gus Sara, White and Williams LLPMr. Sara may be contacted at
sarag@whiteandwilliams.com
Design-Build Contracting: Is the Shine Off the Apple?
March 09, 2020 —
John P. Ahlers - Ahlers Cressman & Sleight PLLCThe design-build delivery method offers many benefits to owners. Among the cited benefits are that projects are generally completed faster, at a lower cost, by allowing innovative approaches through early and continual contractor involvement in the design process. The design contractor serves as a single point of contact responsible for both the design and construction of the project.
The Washington State Department of Transportation (“WSDOT”) utilized the design-build procurement method on the largest project ($2 billion) of its type in the state of Washington: the Highway 99 Tunnel, which was finished almost three years late after the tunnel-boring machine (“Bertha”) broke down six years ago. The sorted tale of the SR-99 Tunnel Project was the source of many of this firm’s blog articles.[1] The State of Washington staunchly maintained that the design-build contract protected its taxpayers from covering the repair costs to the tunnel-boring machine when it broke down in 2013. Bertha did not resume tunneling for almost two years, putting on hold removal of the Alaska Way viaduct and rebuilding of the Seattle Waterfront without an elevated highway.
In December 2013, the contractor for the project, Seattle Tunnel Partners (“STP”), contended that a 110-foot long 8” steel pipe which Bertha hit caused the breakdown. That pipe had been installed for groundwater testing by WSDOT in 2002 during its preliminary engineering for the viaduct replacement project. The project’s Dispute Review Board (“DRB”) composed of three tunneling experts found that the pipe constituted a “differing site condition” for which the State was responsible to disclose to contractors. The Board, whose views were non-binding, did not opine about how much damage the undisclosed pipe cost.[2] In other words, the mere fact that a differing site condition occurred did not establish that there was a causal connection between the damages which STP was seeking (in excess of $600 million) and the differing site condition (the 8” steel pipe which WSDOT lawyers at trial derisively referred to as “nothing more than a toothpick for Bertha’s massive cutter head”). STP maintained that Bertha had made steady progress except for three days immediately after hitting the pipe. It didn’t help the contractors’ case that during the discovery phase of the two-month trial, WSDOT lawyers uncovered documents showing that the contractor’s tunnel workers encountered and logged the pipe before digging began.[3]
Read the court decisionRead the full story...Reprinted courtesy of
John P. Ahlers, Ahlers Cressman & Sleight PLLCMr. Ahlers may be contacted at
john.ahlers@acslawyers.com
Faulty Workmanship Exclusion Does Not Bar Coverage
November 18, 2011 —
Tred R. Eyerly - Insurance Law HawaiiThe court determined that the Faulty Workmanship Exclusion only barred coverage for damages arising from problems with the property under construction itself and not to losses incurred to correct damage from accidents during construction. See 1756 First Associates, LLC v. Continental Casualty Co., 2011 U.S. Dist. LEXIS 117100 (S.D.N.Y. Oct. 3, 2011).
A tower crane collapsed at the construction site, causing damage. First Associates tendered the claim to its insurer, Continental. Continental reimbursed First Associates for certain costs arising from damage to and cleanup of the construction site and building stemming from the crane collapse. Continental refused, however, to reimburse First Associates for costs associated with construction delays resulting from the collapse.
Read the full story…
Reprinted courtesy of Tred R. Eyerly, Insurance Law Hawaii. Mr. Eyerly can be contacted at te@hawaiilawyer.com
Read the court decisionRead the full story...Reprinted courtesy of
2018 California Construction Law Update
January 10, 2018 —
Garret Murai – California Construction Law Blog The California State Legislature introduced 2,495 bills during the first year of the 2017-2018 Legislative Session. Of these, 859 were signed into law.
While much political attention was focused on several California laws that could be viewed as California’s rebuke of Washington, including California’s legalization of marijuana, enactment of “sanctuary state” legislation, and bills focused on climate change, 2017 also saw the enactment of a package of bills intended to address the state’s housing affordability crises (for a great summary of these bills see Wendel Rosen’s Landuse Group’s recent article
Slate of New Housing Bills Takes Effect January 1, 2018 ), as well as a range of other bills of interest to the construction industry including bills related construction financing, alternative project delivery methods, and solar construction.
Each of the bills discussed below took effect on January 1, 2018, except as otherwise stated.
Read the court decisionRead the full story...Reprinted courtesy of
Garret Murai, Wendel, Rosen, Black, Dean, LLPMr. Murai may be contacted at
gmurai@wendel.com
Fraudster Sells 24-Bedroom ‘King’s Speech’ London Mansion
May 20, 2015 —
Neil Callanan – BloombergEdward Davenport, jailed for fraud for his role in a fake lender, sold a 24-bedroom mansion in London’s Marylebone district that was featured in the film “The King’s Speech.”
The money raised from the sale will be used to repay 13 million pounds ($20 million) from a confiscation order by Her Majesty’s Courts and Tribunals Service, the Serious Fraud Office said in a statement Wednesday.
Davenport was jailed for more than seven years in October 2011 for his role in Gresham Ltd., a company that said it offered to provide commercial funding in return for advance fees, the SFO said. After securing the payments, employees would make deceptive assertions to extract further fees, the SFO said in 2011.
Read the court decisionRead the full story...Reprinted courtesy of
Neil Callanan, Bloomberg
Massive Wildfire Near Boulder, Colo., Destroys Nearly 1,000 Homes and Businesses
January 03, 2022 —
Mark Shaw - Engineering News-RecordA wildfire, driven by wind gusts up to 105 mph, swept through 6,000 acres in suburban neighborhoods east of Boulder, Colo., destroying 991 homes and damaging 127 others in the towns of Superior and Louisville, according to estimates from the Boulder County sheriff’s office.
Reprinted courtesy of
Mark Shaw, Engineering News-Record
Mr. Shaw may be contacted at shawm@enr.com
Read the full story... Read the court decisionRead the full story...Reprinted courtesy of
OIRA Best Practices for Administrative Enforcement and Adjudicative Actions
November 23, 2020 —
Anthony B. Cavender - Gravel2GavelOn March 2, 2020, the Environmental Protection Agency revised its “On-Site Civil Inspection Procedures” in accordance with Executive Order 13892 . (The rules are located at 40 CFR Part 31.) These rules set forth the components of an appropriate inspection procedure. Briefly, the rules require that, after the inspector’s credential are made available, the object of the inspection will be discussed (and most inspections will be held during regular working hours), consent to enter must be obtained, there should be an opening and a closing conference with facility representatives, safety protocols must be observed, confidential business information must be protected, and there will be an opportunity for split sampling. Once the report is completed, it will be shared with the facility.
A few months later, on August 31, 2020, the Office of Management and Budget’s Office of Information and Regulatory Affairs (OIRA) circulated a memo to the heads of all federal agencies to implement the principles of fairness in administrative enforcement and adjudication. This directive implements Executive Order 13924, and includes a comprehensive list of “best practices” that should be employed in their administrative enforcement and adjudicative actions. Briefly, these best practices (which are framed in broad terms) are:
1. The government has the burden of proving a violation of the rules or other authorities;
Read the court decisionRead the full story...Reprinted courtesy of
Anthony B. Cavender, PillsburyMr. Cavender may be contacted at
anthony.cavender@pillsburylaw.com
Sales of New U.S. Homes Slump to Lowest Level Since November
October 28, 2015 —
Victoria Stilwell – BloombergPurchases of new U.S. homes slumped in September to a 10-month low, disrupting a trend of steady improvement this year in the industry.
Sales dropped 11.5 percent to a 468,000 annualized pace and the prior two months were revised lower, Commerce Department figures showed Monday. The September rate, which included a record percentage decline in the Northeast, was weaker than all economists’ forecasts in a Bloomberg survey.
Limited inventory of affordable homes and viable lots on which to build them may be holding back progress in housing, which has helped buffer the U.S. from slower growth abroad. Builders may need confirmation that fundamentals supporting the housing recovery -- job growth and cheap borrowing costs -- remain in place before investing in additional land and labor.
Read the court decisionRead the full story...Reprinted courtesy of
Victoria Stilwell, Bloomberg