Construction Lien Needs to Be Recorded Within 90 Days from Lienor’s Final Furnishing
March 22, 2018 —
David Adelstein – Florida Construction Legal UpdatesA lienor needs to record its construction lien within 90 days of its final furnishing date. This final furnishing date excludes punchlist, warranty, or the lienor’s own corrective work. A lien recorded outside of the 90-day window will be deemed invalid.
The opinion in In re: Jennerwein, 309 B.R. 385 (M.D. Fla. 2004) provides a good discussion of this 90-day window. This matter dealt with a debtor / owner’s bankruptcy where the owner was contesting the validity of a construction lien by its pool contractor. The owner contended that the lienor’s lien was recorded outside of this 90-day window thus rendering the lien invalid. The bankruptcy court was determining the validity of the lien.
In this matter, the owner hired a swimming pool contractor to construct a pool. On October 25, 2002, the pool contractor installed pavers around the pool. After this was performed, the pool contractor realized the owner was unable to obtain the financing to pay for the pool. As a result, the pool contractor ceased doing any more improvements. But, neither the pool contractor nor the owner terminated the contract. Then, on November 27, 2002, the pool contractor sent a supervisor to the property to inspect the pool (work-in-place), the pool equipment, the installed pavers, made a list of the unfinished work, and remove any debris. On January 27, 2003, the pool contractor recorded its lien.
Read the court decisionRead the full story...Reprinted courtesy of
David Adelstein, Florida Construction Legal UpdatesMr. Adelstein may be contacted at
dadelstein@gmail.com
Eleventh Circuit Finds No “Property Damage” Where Defective Component Failed to Cause Damage to Other Non-Defective Components
October 11, 2021 —
Anthony L. Miscioscia & Margo Meta - White and WilliamsIn Florida, damage caused by faulty workmanship constitutes “property damage;” however, the cost of repairing or removing defective work does not. Amerisure Mutual Insurance Company v. Auchter Company, 673 F.3d 1294 (11th Cir. 2012) (Auchter). But what happens when the cost of repairing or removing defective work results in loss of use of the tangible property which is not physically injured?
The United States Court of Appeals for the Eleventh Circuit was recently faced with this question in Tricon Development of Brevard, Inc. v. Nautilus Insurance Company, No. 21-11199, 2021 U.S. App. LEXIS 27317 (11th Cir. Sep. 10, 2021). Tricon arose out of the construction of a condominium. Tricon was hired to serve as general contractor for the project and hired a subcontractor to fabricate and install metal railings. The railings installed by the subcontractor were defective and damaged, improperly installed, and failed to meet the project’s specifications. Tricon filed an insurance claim with Nautilus Insurance Company, the subcontractor’s commercial general liability insurer, for the cost to remove and replace the railings.[1]
Reprinted courtesy of
Anthony L. Miscioscia, White and Williams and
Margo Meta, White and Williams
Mr. Miscioscia may be contacted at misciosciaa@whiteandwilliams.com
Ms. Meta may be contacted at metam@whiteandwilliams.com
Read the court decisionRead the full story...Reprinted courtesy of
Florida’s Construction Defect Statute of Repose
August 24, 2017 —
David Suggs – Bert L. Howe & Associates, Inc.Butler Weihmuller of Katz Craig LLP discussed Florida’s 10-year statute of repose law: “Under § 95.11(3)(c), the action must commence within 10 years after the date of actual possession by the owner, the date of the issuance of a certificate of occupancy, the date of abandonment of construction if not completed, or the date of completion or termination of the contract between the professional engineer, registered architect, or licensed contractor and his or her employer, whichever date is latest.”
However, Weihmuller explains that parties may disagree on the specific date For instance, in Busch v. Lennar Homes, LLC, Florida’s 5th DCA recently “reversed a trial court’s dismissal of a homeowner’s construction defect claim that was filed just beyond 10 years after the closing date on the property.” The previous decision had been based on the notion that the contract had been completed upon the date of closing. The 5th DCA declared that “a contract is not completed until both sides of a contract have been performed” and “pointed to the ‘inspection and punch-list clause’ of the contract.” The clause indicated that “[a]ny remaining items that Seller has agreed to correct will be corrected by Seller at Seller’s sole cost and expense prior to closing or at Seller’s option within a reasonable time after closing.” Since not all punch-list items had been completed prior to closing, the 5th DCA held that the contract had not been completed at closing, and therefore the statute of repose did not begin until the punch-items had been accomplished.
Read the court decisionRead the full story...Reprinted courtesy of
Blackstone Said in $1.7 Billion Deal to Buy Apartments
January 21, 2015 —
Hui-yong Yu – BloombergBlackstone Group LP (BX), the biggest owner of U.S. single-family houses, agreed to buy 36 apartment properties across the country for about $1.7 billion as it expands its rental business, according to two people with knowledge of the transaction.
The low-rise, garden-style properties are being sold by Praedium Group, a New York-based real estate investment firm, and contain about 11,000 apartments, said the people, who asked not to be identified because the deal is private. About half of the buildings are in California, Washington, D.C., and Boston, with the rest located around the U.S., they said.
Read the court decisionRead the full story...Reprinted courtesy of
Hui-yong Yu, BloombergHui-yong Yu may be contacted at
hyu@bloomberg.net
Lessons Learned from Implementing Infrastructure BIM in Helsinki
February 07, 2018 —
Aarni Heiskanen – AEC Business BlogFinland’s capital is currently experiencing a construction boom. Old industrial citadels are turning into residential areas with new commercial centers. Consequently, Helsinki needs to build new infrastructure. To improve the efficiency and quality of infrastructure construction, the city has started using BIM, and is now learning how to get the most value from it.
Ville Alajoki, Team Leader in Helsinki’s Urban Development Division, is a keen proponent of BIM. “Infrastructure construction is still in its early stages when it comes to using BIM. For the most part, BIM implementation has not been systematic in our city yet. We tend to use it in our own structural design and often in building construction. However, in infrastructure project management, its active individuals who have set the pace,” Ville admits. He believes that the city’s strategy for 2017–2021 will spur the use of new technologies, including BIM. “Helsinki aims to be the city in the world that makes the best use of digitalization,” Mayor
Jan Vapaavuori has declared.
A good start, but there’s room for improvement.
Read the court decisionRead the full story...Reprinted courtesy of
Aarni Heiskanen, AEC Business Blog Mr. Heiskanen may be contacted at
info@aepartners.fi
Claim for Punitive Damages Based on Insurers' Alleged Bad Faith Business Practices Fails
September 05, 2022 —
Tred R. Eyerly - Insurance Law HawaiiThe court granted the insurer's motion to dismiss the bad faith claim based upon allegations of a general business practice of acting recklessly toward an insured's rights under the policy. Sandpiper Isle Condo. Ass'n v. Empire Indem. Ins. Co., 2022 U.S. Dist. LEXIS 114279 (M.D. Fla. June 28, 2022).
Sandpiper suffered property damage from Hurricane Irma. Empire accepted the claim but there was disagreement on the value of the damage. An appraisal issued an award in favor of Sandpiper but Empire failed to pay the benefits for two years.
Read the court decisionRead the full story...Reprinted courtesy of
Tred R. Eyerly, Damon Key Leong Kupchak HastertMr. Eyerly may be contacted at
te@hawaiilawyer.com
UCP Buys Citizen Homes
March 31, 2014 —
Beverley BevenFlorez-CDJ STAFFUCP, a home builder and land developer based in San Jose, California, has purchased “Charlotte-based Southeast regional home building venture Citizens Homes, whose chairman is well-known home building industry veteran Tony Mon, and whose president and chief operating officer is third-generation home builder Scott Thorson,” according to Big Builder.
According to a UCP press statement, as quoted by Big Builder, “[t]he purchase price, estimated to be approximately $15 million, is based on the total assets of Citizens at the closing of the acquisition, less cash and cash equivalents, and less certain assumed trade payables. In addition, Citizens is eligible to receive earnout payments from UCP of up to $6 million in the aggregate based on performance over the next five years.”
The acquisition is expected to close during the second quarter of 2014.
Read the court decisionRead the full story...Reprinted courtesy of
"Repair Work" Endorsements and Punch List Work
May 20, 2019 —
Jeremiah M. Welch - Saxe Doernberger & Vita, P.C.The recent white paper on
Repair Work Endorsements by
Jeremiah Welch, drew a storm of responses. Most were appreciative and included follow up questions, but there were those that lamented along the lines of: “How can that be? We’ve been doing it this way for years…”. For the skeptics, the best approach to test the premise of the paper (that most “repair work endorsements” are at best redundant with the PCO extension and at worst restrictive) is to try to formulate a scenario where coverage would be available under a “repair work endorsement” but not under a PCO extension.
Several folks asked about the impact of PCO extensions and repair work endorsements on “punch list” work. “Punch list” work presents a related but different problem. The first issue is understanding what is meant by the term “punch list”. You won’t find that term in an ISO CGL policy. You may find it defined in a construction contract and a Google search will yield several similar definitions. In general, our industry uses the term “punch list” to describe items identified toward the end of a project (often after the contractually defined point of “substantial completion”) which must be completed in order to fully comply with the contract requirements/scope. In short, “punch list” items are items necessary to complete the work.
Read the court decisionRead the full story...Reprinted courtesy of
Jeremiah M. Welch, Saxe Doernberger & Vita, P.C.Mr. Welch may be contacted at
jmw@sdvlaw.com