Traub Lieberman Partner Bradley T. Guldalian Wins Summary Judgment
November 19, 2021 —
Bradley T. Guldalian - Traub LiebermanOn September 14, 2021, Traub Lieberman Partner Bradley T. Guldalian secured summary judgment on behalf of a City which operated a park containing a natural bathing spring in Sarasota County, Florida. The underlying loss occurred when the Plaintiff went to the park, entered the spring without incident, swam for more than an hour, then exited the spring and was returning to the area where she had stored her belongings when she slipped and fell on mud and grass, sustaining an open angulated fracture of her right tibia and fibula. The Plaintiff was rushed to the hospital where she underwent open reduction, internal fixation surgery on her right leg which consisted of implantation of a metal rod into the medullary cavity of her tibia that was secured by two proximal and two distal interlocking screws. She was in the hospital for four days. Upon discharge, the Plaintiff was placed in a walking boot and confined to a wheelchair for several months. The Plaintiff incurred nearly $100,000 in medical expenses. The Plaintiff filed a premises liability action against the City claiming it failed to maintain its premises in a reasonably safe condition. The Plaintiff also alleged that the City failed to warn her that the area where she had stored her belongings had become saturated and slippery proximately causing her fall and resulting injuries.
After the close of discovery, Mr. Guldalian filed a Motion for Summary Judgment on behalf of the City arguing the wet grass and mud upon which the Plaintiff fell and injured herself was a byproduct of patrons going in and out of the water and walking to and from the area where they stored their belongings, was open and obvious, and did not constitute a dangerous condition as a matter of law. Citing to case law from the Florida Supreme Court which held that it is common knowledge that walks adjacent to, leading to, or surrounding a bathing area generally have water constantly thrown upon them and are in a slippery condition, as well as deposition testimony from the Plaintiff confirming she had been swimming at the spring for the past eighteen plus years and was “very familiar” with the park, the spring, and the area where she normally stored her belongings, Mr. Guldalian argued that some injury-causing conditions, like wet grass and mud surrounding a swimming area, are simply so open and so obvious that they cannot be held, as a matter of law, to give rise to liability as dangerous conditions.
Read the court decisionRead the full story...Reprinted courtesy of
Bradley T. Guldalian, Traub LiebermanMr. Guldalian may be contacted at
bguldalian@tlsslaw.com
6 Ways to Reduce Fire Safety Hazards in BESS
January 02, 2024 —
The Hartford Staff - The Hartford InsightsRenewable energy sources, such as solar and wind, are projected to generate 44% of all power in the U.S. by 2050, which is increasing the need for battery energy storage systems (BESS).1
BESS are electrochemical devices that collect energy from a power grid, power plant or renewable source, hold it, and then discharge that energy later to provide electricity on demand.
“A BESS does not itself create or produce energy, it is a storage system. The energy is produced by other means, including different types of renewable sources. Think of a cellphone – you charge it overnight and then it runs throughout the day off that battery power,” says Stacie Prescott, head of energy for middle and large commercial at The Hartford.
Read the court decisionRead the full story...Reprinted courtesy of
The Hartford Staff, The Hartford Insights
Client Alert: Naming of Known and Unknown Defendants in Initial Complaints: A Cautionary Tale
September 24, 2014 —
R. Bryan Martin & Whitney L. Stefko – Haight Brown & Bonesteel LLPOn September 12, 2014, the Ninth Circuit Court of Appeals, in Butler v. National Community Renaissance of California, upheld a district court's dismissal of certain defendants named in amended complaints, affirming the necessity of naming those known and unknown defendants in Plaintiff's original complaint.
In April 2009, Plaintiff Zina Butler filed an action in federal district court, naming a single defendant, National Community Renaissance Corporation ("National"), for an alleged warrantless search of Plaintiff's apartment on April 18, 2007. The single page complaint asserted that the apartment manager provided a Section 8 investigator, a City employee and Sherriff deputies keys to Plaintiff's apartment and conducted a search in violation of her Fourth Amendment rights. Shortly after, Plaintiff filed a first amended complaint, with the only change being the addition of defendant, the Housing Authority of the County of Los Angeles ("HACoLA") in the caption. In May 2009, the court (on its own accord) dismissed the first amended complaint with leave to amend as "it [was] unclear whom Plaintiff intend[ed] to sue."
In June 2009, Plaintiff filed a second amended complaint, identifying National and HACoLA in the caption as defendants, but separately identifying several other individuals and entities allegedly involved in the incident occurring in April of 2007 in the complaint's statement of facts. The Court, once again, dismissed the second amended complaint with leave to amend for the same reasons it dismissed Plaintiff's first amended complaint.
Reprinted courtesy of
R. Bryan Martin, Haight Brown & Bonesteel LLP and
Whitney L. Stefco, Haight Brown & Bonesteel LLP
Mr. Martin may be contacted at bmartin@hbblaw.com; Ms. Stefko may be contacted at wstefko@hbblaw.com
Read the court decisionRead the full story...Reprinted courtesy of
Traub Lieberman Partner Colleen Hastie Wins Summary Judgment in Favor of Sub-Contracted Electrical Company
February 14, 2023 —
Colleen E. Hastie - Traub LiebermanIn a case brought before the New York State Supreme Court, Kings County, Plaintiff alleged injury while performing work at a commercial premises in Brooklyn when he rolled his ankle on a jackhammered/chopped cellar floor slab while carrying a metal pipe from the main floor to the cellar on the subject premises. The property was owned by New York City entities, who were listed as Defendants in the underlying suit. A Construction Company was hired as the general contractor and construction manager for the work, who hired the Electrical Contractor to perform the main electrical fit out for the subject premises. The Electrical Contractor then hired Traub Lieberman’s client, the Electrical Subcontractor, to work on cellar-level conduit, cabling, backboxes, and lighting control systems. The Electrical Contractor, as Second Third-Party Plaintiff, brought suit against the Electrical Subcontractor, as Second Third-Party Defendant, for damages related to the underlying suit.
Read the court decisionRead the full story...Reprinted courtesy of
Colleen E. Hastie, Traub LiebermanMs. Hastie may be contacted at
chastie@tlsslaw.com
The OFCCP’s November 2019 Updated Technical Assistance Guide: What Every Federal Construction Contractor Should Know
March 23, 2020 —
Sarah K. Carpenter - Smith CurrieThe Department of Labor (“DOL”) Office of Federal Contract Compliance Programs (“OFCCP”) issued its 148-page Updated Construction Contractor Technical Assistance Guide (the “Guide”) on November 13, 2019. A complete copy of the Guide can be found
here, but the below provides a summary of what every Federal Construction Contractor should know regarding the OFCCP’s November 2019 update to its prior 2006 publication.
The DOL has identified the Guide as a “self-assessment tool” to assist contractors in meeting “their legal requirements and responsibilities for equal employment opportunity by preventing violations before they occur.” However, the Guide does not create or impose new requirements for Federal Construction Contractors. Instead, the Guide provides an overview of anti-discrimination and affirmative action requirements and obligations under existing laws and regulations, and suggests best practices and guidance. Specifically, the Guide provides:
- A concise summary of Federal Construction Contractors’ legal obligations under the three main laws enforced by the OFCCP: Executive Order 11246, Section 503 of the Rehabilitation Act of 1973, and the Vietnam Era Veterans’ Readjustment Assistance Act of 1974;
- A detailed explanation of requirements for written Affirmative Action Plans;
- A clear schedule of Standard Federal Equal Employment Opportunity Construction Contract Specifications;
- A reorganized recap of the sixteen affirmative action steps Federal Construction Contractors are required to implement in good-faith; and
- A user-friendly roadmap of what to expect during an OFCCP audit, including a discussion of record keeping requirements.
Read the court decisionRead the full story...Reprinted courtesy of
Sarah K. Carpenter, Smith CurrieMs. Carpenter may be contacted at
skcarpenter@smithcurrie.com
Engineers Propose 'River' Alternative to Border Wall
May 10, 2017 —
Frank K. Johnson - Engineering News-RecordOf all the ideas that have been suggested for the border wall, there is one that may help to bring together Mexico and the U.S., instead of pitting the countries against each another over illegal immigration. I’m part of a group of civil engineers in Massachusetts that has conceived of a program that is based on a recently acquired patent for an advanced concrete construction technology for building large-scale, monolithic concrete structures capable of physically partitioning two countries while serving to promote economic development. This fast and thrifty construction method and our proposed program prove that, as far as creativity is concerned, civil engineering isn’t dead yet.
Read the court decisionRead the full story...Reprinted courtesy of
Frank K. Johnson, ENRENR may be contacted at
ENR.com@bnpmedia.com
Defects, Delays and Change Orders
November 01, 2021 —
Jacob A. Epstein - Construction ExecutiveAs every construction professional is aware, unexpected events and problems are guaranteed on every large project. Defects, delays and change orders are sure to arise, and depending on how they are dealt with and addressed at the time, they can either have minimal effects on the overall project or they can have drastic, long-term and often costly effects, including but not limited to thousands of dollars in legal fees, increases in insurance premiums and/or years of litigation down the road.
There are many reasons why so many large construction projects end up in some type of litigation. Delay claims, construction contract disputes and construction defect lawsuits are so prevalent in certain parts of the country that certain judges designate specific time blocks in their courtrooms for construction cases only—just to deal with the large portions of their case dockets dealing with construction issues at the same time.
Reprinted courtesy of
Jacob A. Epstein, Construction Executive, a publication of Associated Builders and Contractors. All rights reserved.
Read the court decisionRead the full story...Reprinted courtesy of
Mr. Epstein may be contacted at
jepstein@haber.law
General Contractor Cited for Safety Violations after Worker Fatality
September 17, 2015 —
Beverley BevenFlorez-CDJ STAFFThe general contractor of Washington’s SR 520 Floating Bridge Project was cited by the Washington Department of Labor & Industries (L&I) “for serious safety violations following the death of worker Joe Arrants in March.” According to EHS Today, “Arrants was killed when he fell approximately 60 feet to the dock below.”
EHS Today reported that during the investigation, L&I found that the fall protection systems were not used “in accordance with fall protection standards and the manufacturer’s recommendation during forming and stripping operations.” Furthermore, there was no “lifesaving skiff immediately available,” or “a ring buoy with at least 90 feet of line, which would make rescue difficult if a worker fell into the water,” and the contractor did not ensure that the hand tools and equipment were in good, working condition.
Read the court decisionRead the full story...Reprinted courtesy of