Court Affirms Summary Adjudication of Bad Faith Claim Where Expert Opinions Raised a Genuine Dispute
July 06, 2020 —
Christopher Kendrick & Valerie A. Moore – Haight Brown & Bonesteel LLPIn 501 East 51st Street etc. v. Kookmin Best Ins. Co., Ltd. (No. B293605, filed 4/2/20, ordered pub. 4/16/20), a California appeals court affirmed summary adjudication and dismissal of a bad faith claim based on the genuine dispute doctrine.
501 East 51st Street Long-Beach-10, LLC (501) was the owner of a 10-unit apartment complex, insured by Kookmin Best. In 2017, an underground water main alongside the building burst which, according to 501, caused the building to move and crack. 501 made a claim and supplied a geotechnical report finding cracks in the foundation walls, cracks in the stucco and significant floor deformation and tilting near the water leak. The engineer’s opinion concluded that that “existing building distress was substantially contributed to by the water main break. The water introduced to the soil medium appears to have triggered differential foundation movement causing the stress features to develop.”
Kookmin retained its own engineers to investigate, who returned an opinion that the leak had exacerbated long-term pre-existing settlement which would continue. Under the policy, damage to the building caused by earth movement and settlement were excluded, but water damage resulting from an “accidental discharge” of water was covered. Kookmin then obtained an opinion from coverage counsel, who opined that only damage allocable to the water leak would be covered.
Reprinted courtesy of
Christopher Kendrick, Haight Brown & Bonesteel LLP and
Valerie A. Moore, Haight Brown & Bonesteel LLP
Mr. Kendrick may be contacted at ckendrick@hbblaw.com
Ms. Moore may be contacted at vmoore@hbblaw.com
Read the court decisionRead the full story...Reprinted courtesy of
Ahlers Cressman & Sleight PLLC Recognized Among The Top 50 Construction Law Firms by Construction Executive
June 20, 2022 —
Scott R. Sleight - Ahlers Cressman & Sleight PLLCACS is proud to announce it has once again been ranked among The Top 50 Construction Law FirmsTM in the Construction Executive 2022 rankings. ACS is the highest ranked law firm in the US practicing out of a single office.
ACS specializes in delivering the highest quality construction law services. ACS prides itself on providing excellent services to clients in matters relating to contract documents, construction dispute resolution, and government contracts. If resolution efforts fail, ACS has the experience and ability to represent clients in high-stakes litigation. Since 2018, ACS has obtained three significant jury verdicts in favor of its general contractor clients, including awards of prevailing party attorneys’ fees and costs and expenses.
Founded in 2007, ACS’ vast knowledge and industry experience led our lawyers to hold many leadership positions. Three of our lawyers are past chairs of the Washington State Bar Association’s Construction Law Section, five of our lawyers have served as the Chair of the Associated General Contractors of Washington’s Legal Affairs Committee, and many of our lawyers are recognized as Super Lawyers and Rising Stars in Super Lawyers Magazine/Thomson Reuters. We have represented construction firms before the Supreme Court and the Court of Appeals in numerous precedent-setting cases, and have testified before the Legislature. ACS’ commitment to the construction industry shows in our results.
Read the court decisionRead the full story...Reprinted courtesy of
Scott R. Sleight, Ahlers Cressman & Sleight PLLCMr. Sleight may be contacted at
scott.sleight@acslawyers.com
When is a Contract not a Contract?
January 21, 2019 —
Christopher G. Hill - Construction Law MusingsAs I’ve stated numerous times here at Musings, in Virginia the contract is king. The courts of Virginia will read a contract as written and where there is a contract (read as foreshadowing), the courts will assume the parties knew what they were doing and enforce it by its terms. However, there has to be a contract in the first place.
When can something look like a contract but still not be a contract? When there isn’t mutual assent according to the case of Knox Energy, LLC v. Gasco Drilling, Inc. In the Knox case, along with a ruling on discovery abuse that is a topic of other blogs, considered a jury instruction on mutual assent given by the district court in a case where Knox contended that it inadvertently sent an unexecuted drilling contract form to Gasco and then inadvertently executed it when Gasco returned it. While this would not normally cause this series of events to be a non-contract, Knox also contended that Gasco knew that Knox had no intention to enter into the drilling contract and that Gasco jumped at the deal.
Read the court decisionRead the full story...Reprinted courtesy of
The Law Office of Christopher G. HillMr. Hill may be contacted at
chrisghill@constructionlawva.com
Texas exclusions j(5) and j(6).
April 27, 2011 —
CDCoverage.comIn Evanston Ins. Co. v. D&L Masonry of Lubbock, Inc., No. 07-10-00358-CV (Tex. Ct. App. April 18, 2011), insured masonry subcontractor D&L sued its CGL insurer Evanston to recover costs incurred by D&L for the replacement of window frames damaged by D&L while performing masonry work adjacent to the window frames. The trial court granted summary judgment for D&L.
Read the full story…
Reprinted courtesy of CDCoverage.com
Read the court decisionRead the full story...Reprinted courtesy of
Subrogation Waiver Unconscionable in Residential Fuel Delivery Contract
April 29, 2024 —
Ryan A. Bennett - The Subrogation StrategistIn a matter of first impression, the Superior Court of Connecticut (Superior Court), in American Commerce Ins., Co. v. Eastern Fuel Corp., No. CV-206109168-S, 2024 Conn. Super. LEXIS 380, held that a waiver of subrogation provision in a consumer fuel service/delivery contract violated public policy. The Superior Court overruled the motion for summary judgment filed by Eastern Fuel Corporation (Eastern) and determined that the clause was impermissible as the contract was entered into by two parties with unequal bargaining power.
American Commerce Insurance Company (American) provided property insurance to Arlene and James Hillas (the Insureds) for their home in Woodbridge, Connecticut. The Insureds hired Eastern to service their heating system on or around October 25, 2018. The service work at the property included inspecting the oil filters and flushing the fuel lines. On November 1, 2018, when the Insureds turned the heating system on for the first time that season, the two oil tanks on the property were allegedly full. After a series of deliveries, claims that the oil levels were lower than expected, discovering oil staining on the floor and Eastern’s replacement of the oil lines, Eastern delivered another 429 gallons. However, after the delivery, additional leaks were discovered relating to the oil line replacements. Ultimately, the Insureds submitted a claim to American and American paid in excess of $59,000 for the damage incurred.
Read the court decisionRead the full story...Reprinted courtesy of
Ryan A. Bennett, White and Williams LLPMr. Bennett may be contacted at
bennettr@whiteandwilliams.com
Touchdown! – The Construction Industry’s Winning Audible to the COVID Blitz
February 08, 2021 —
Bill Shaughnessy, Jones Walker, LLP - ConsensusDocsCOVID-19 has changed the way we live, work, play football, and build. As with all of society (and our football leagues and teams), the construction industry was impacted over the last year through the implementation of new safety protocols in response to COVID-19. While some construction projects were delayed or put on hold, much of the construction industry was fortunate to continue to build throughout the pandemic. Building under COVID-19 safety protocols led contractors to “call an audible” in order to make up for lost time and to save costs. In doing so, many contractors started incorporating or expanding the use of under-utilized tools, resources, capabilities, and technology such as pre-fabrication, and modular construction, while at the same time reexamining planning methods, monitoring critical schedule activities, and ways to better execute construction.
In many ways, the effects of COVID-19 safety protocols and measures implemented by contractors in the past year have led to more efficient and cheaper construction projects now and for the future. So, it is not surprising as we turn our calendars to 2021 that contractors can expect these tools, resources, and technologies to be utilized more in the years ahead, even once the pandemic subsides. This article highlights some of the “positive” effects of COVID-19 on projects and highlights several ways contractors attempted to increase efficiency and reduce costs in response to the pandemic.
Read the court decisionRead the full story...Reprinted courtesy of
Bill Shaughnessy, Jones Walker, LLPMr. Shaughnessy may be contacted at
bshaughnessy@joneswalker.com
Specific Source of Water Not Relevant in Construction Defect Claim
June 28, 2013 —
CDJ STAFFThe Nebraska Court of Appeals has concluded that a lower court came to the correct conclusion in a construction defect case involving water intrusion. The Hiatts built a home in North Platte, Nebraska, in in 2004 which they sold to the Oettingers in May, 2006. Shortly thereafter, the Oettingers started experiencing problems with water intrusion and contacted the Hiatts. The Hiatts responded by replacing the septic lift. Subsequently, the Oettingers landscaped their yard, which they allege was done with the assistance of the Hiatts. The water problems continued and “the parties took substantial remedial measures, including excavating the sidewalk and inspecting the downspouts.” The water problems continued, getting worse and requiring increasingly aggressive responses.
The Oettingers then had a series of inspections, and they hired the last of these inspectors to actually fix the water intrusion problem. At that point, they filed a lawsuit against the Hiatts alleging that the Hiatts “breached their contact by constructing and selling a home that was not built according to reasonable construction standards,” and that they “were negligent in the repair of the home in 2009.”
During the trial, Irving Hiatt testified that they “tarred the outside of the basement and put plastic into the tar and another layer of plastic over the top of that.” He claimed that the problem was with the Oettingers’ landscaping. This was further claimed in testimony of his son, Vernon Hiatt, who said the landscaping lacked drainage.
The Oettingers had three experts testify, all of whom noted that the landscaping could not have been the problem. All three experts testified as to problems with the Hiatts’ construction. The court concluded that the Hiatts had breached an implied warranty, rejecting the claim that the water intrusion was due to the landscaping. The Hiatts appealed the decision of the county court to the district court. Here, the judgment of the lowest court was confirmed, with the district court again finding a breach of the implied warranty of workmanlike performance.
The Hiatts appealed again. They alleged that the district court should not have held a breach of implied warranty existed without proving the source of the water intrusion, and that damages should have been apportioned based on the degree to which the Oettingers’ landscaping and basement alterations were responsible. The appeals court dispensed with the second claim first, noting that “they do not argue this error in their brief nor do they explain how or why the trial court should have apportioned damages.” The court also noted that although the Oettingers made a negligence claim in their suit, the case had been decided on the basis of a breach of implied warranty.
The appeals court upheld the Oettingers’ claim of a breach of implied warranty. In order to do this, the court noted that the Oettingers had to show that an implied warranty existed, that the Haitts breached that warranty, damage was suffered as a result, and that no express warranty limited the implied warranty. That court noted that “the record is sufficient to prove that the Hiatts breached the implied warranty in the method in which they constructed the basement” and that “this breach was the cause of the Oettingers’ damages.”
The court concluded that the Oettingers “provided sufficient evidence that the Hiatts’ faulty construction allowed water, whatever its source, to infiltrate the basement.” The court rejected the Hiatts’ claim that the Oettingers’ repairs voided the warranty, as it was clear that the Hiatts were involved in carrying out these repairs. The court’s final conclusion was that “the evidence in the record supports the trial court’s factual finding that the Hiatts’ flawed construction caused water damage to the Oettingers’ basement.”
Read the court decisionRead the full story...Reprinted courtesy of
South Carolina “Your Work” Exclusion, “Get To” Costs
July 30, 2014 —
Scott Patterson - CD CoverageIn Precision Walls, Inc. v. Liberty Mutual Fire Insurance Co., No. 2013-000787 (S.C. Ct. App. July 23, 2014), SYS was the general contractor for a project. SYS contracted with Precision for the supply and installation of exterior insulation board, to include the taping of all joints. After Precision completed its work, another subcontractor began construction of the brick veneer wall over the insulation board. During construction of the brick wall, some of the joint sealing tape installed by Precision began to come loose. To correct the problem, the existing portion of the brick veneer wall had to be torn down, all of the joint sealing tape removed and replaced, and the brick veneer wall rebuilt. SYS deducted the cost of tearing down and rebuilding the brick veneer wall from Precision’s contract. Precision sought reimbursement for this amount from its CGL policy issued by Liberty Mutual.
Read the court decisionRead the full story...Reprinted courtesy of
Scott Patterson, CD Coverage