Florida District Court Finds That “Unrelated” Design Errors Sufficient to Trigger “Related Claims” Provision in Architects & Engineers Policy
March 02, 2020 —
Jason Taylor - Traub LiebermanMost professional liability polices include some form of a “related claims” provision that generally provides where two or more claims or wrongful acts are causally or logically related, they will be deemed to constitute a single claim. Importantly, these provisions typically provide that those “claims” are then deemed to have been “first made” at the time the first claim or act was committed for purposes of the policy’s claims-made and reporting requirements. Understandably, these provisions provide insurers and insureds with some clarity over the number and timing of claims that could involve multiple errors or omissions, and potentially aggregate all related claims or acts into a single policy period. While reasonable in principle, application of such provisions, especially involving large scale design and construction projects, is not always so easy.
Nova Southeastern University, Inc. v. Continental Cas. Co., 18-cv-61842 (S.D. Fla. Dec. 27, 2019), involved such an insurance coverage dispute with a design project gone wrong. DeRose Design Consultants, Inc. (“DeRose”) was hired as a structural engineer to design “ice tanks” to store and chill water for an energy efficient air conditioning facility constructed on the campus of Nova Southeastern University (“NSU”). An early water test on one of the tanks determined the walls of the ice tank deflected, leaked, and cracked when the tank was filled with water. DeRose later discovered that the problems with the ice tank were caused by a structural design error.
The first errors were discovered in early 2009, and reported under DeRose’s professional liability policy with Evanston. DeRose then created a remedial design to repair the tanks, which involved strengthening repairs. Additional leaking and an early indication of corrosion involving the Remedial Design arose as early as October 25, 2009. Several field investigation reports were prepared in 2011 and 2012 confirming these issues with the Remedial Design. A third report in February 2012, however, identified a new error involving the concrete slab under the ice tanks also designed by DeRose. The third report concluded that the concreate slab was overstressed and could not handle the loads of the ice tanks. The report also concluded, however, that the design defects in the concrete slab were “unrelated” to the original design defect of the ice tank walls or Remedial Design.
Read the court decisionRead the full story...Reprinted courtesy of
Jason Taylor, Traub LiebermanMr. Taylor may be contacted at
jtaylor@tlsslaw.com
Construction News Roundup
September 19, 2022 —
Christopher G. Hill - Construction Law MusingsMuch happened in the last week or so in Virginia construction, both legally and otherwise. I thought a quick roundup was in order.
On the green front we has a great article in ENR relating to the liability risk of green building and the great interest in the
AGCVA Green Building Breakfast.
Also, the Virginia courts decided several interesting cases:
The first is Travelers Property Cas. Co. of America a/s/o Covenant Woods v. Premier Project Mgmt. Group LLC v. Haskell Co. a case that reminds everyone that waivers of third party rights under the contract will be enforced in Virginia.
Read the court decisionRead the full story...Reprinted courtesy of
The Law Office of Christopher G. HillMr. Hill may be contacted at
chrisghill@constructionlawva.com
New Mexico Adopts Right to Repair Act
April 25, 2023 —
William L. Doerler - The Subrogation StrategistOn April 7, 2023, New Mexico’s governor, Michelle Lujan Grisham, signed into law New Mexico’s Right to Repair Act (Act), 2023 N.M. SB 50. The Act’s effective date is July 1, 2023. The Act applies to construction defects in dwellings, i.e., newly constructed single family housing units designed for residential use. The Act applies to not only newly constructed housing units but also to systems and other components and improvements that are part of the housing unit at the time of construction.
Pursuant to the Act, except for construction defect claims that involve an immediate threat to the life or safety of persons occupying the dwelling, that render the dwelling uninhabitable or in which the seller, after notice, refused to make a repair pursuant to any applicable express warranty, a purchaser must comply with the provisions of the Act before filing a complaint or pursing an alternative dispute mechanism related to a construction defect in the dwelling. A seller who receives a notice complying with the provisions of the Act must give notice to all construction professionals who may be responsible for the defect.
Read the court decisionRead the full story...Reprinted courtesy of
William L. Doerler, White and Williams LLPMr. Doerler may be contacted at
doerlerw@whiteandwilliams.com
Cable-Free Elevators Will Soar to New Heights, and Move Sideways
January 14, 2015 —
Belinda Lanks – BloombergI live in one of the few buildings in New York that still has a manual elevator. When I ask the operator on the morning shift how he's doing, his well-oiled response is "up and down." For the last 160 years, elevators have travelled a predictably vertical path. That will soon change when the German manufacturer ThyssenKrupp introduces the first fleet of cable-free cars that can also move sideways.
The system, dubbed MULTI, will allow multiple cabs to motor along a single, looping shaft. The cars move by magnetic levitation (the same technology behind some high-speed trains), rather than being pulled by the heavy steel ropes that limit how high skyscrapers can stretch. With MULTI, architects will be able to build spindly towers on small plots formerly deemed untenable for high-rises.
Read the court decisionRead the full story...Reprinted courtesy of
Belinda Lanks, BloombergMs. Lanks may be contacted at
blanks@bloomberg.net
Second Circuit Denies Petitions for Review of EPA’s Final Regulations to Establish Requirements for Cooling Water Intake Structures
August 20, 2018 —
Anthony B. Cavender - Gravel2GavelOn July 23, 2018, the U.S. Court of Appeals for the Second Circuit decided the case of Cooling Water Intake Structure Coalition v. EPA. Environmental conservation groups and industry associations petitioned for review of a final rule promulgated by the U.S. Environmental Protection Agency (EPA) pursuant to section 316(b) of the Clean Water Act (CWA), establishing requirements for cooling water intake structures at existing facilities. Denying the petitions for review, the Court of Appeals summarized:
“Because we conclude, among other things, that both the Rule and the biological opinion are based on reasonable interpretations of the applicable statutes and sufficiently supported by the factual record, and because the EPA 3 gave adequate notice of its rulemaking, we DENY the petitions for review.”
This is a significant CWA and Endangered Species Act (ESA) decision involving the operation of major industrial facilities requiring the daily use of large amounts of water taken from adjacent bodies of water.
Read the court decisionRead the full story...Reprinted courtesy of
Anthony B. Cavender, PillsburyMr. Cavender may be contacted at
anthony.cavender@pillsburylaw.com
Bert Hummel Appointed Vice Chair of State Bar of Georgia Bench & Bar Committee
October 24, 2021 —
Bert Hummel - Lewis BrisboisAtlanta, Ga. (October 4, 2021) – Atlanta Partner Bert Hummel was recently named Vice Chair of the State Bar of Georgia's Bench & Bar Committee for the 2021-2022 year.
The Bench & Bar Committee identifies and facilitates solutions to issues of mutual interest between State judges and Georgia lawyers for the benefit of the bench, the bar and the public. It also oversees the annual Justice Thomas O. Marshall Professionalism Award, which honors one lawyer and one judge who have demonstrated the highest professional conduct and paramount reputation for professionalism.
Read the court decisionRead the full story...Reprinted courtesy of
Bert Hummel, Lewis BrisboisMr. Hummel may be contacted at
Bert.Hummel@lewisbrisbois.com
Pollution Exclusion Does Not Apply To Concrete Settling Dust
November 28, 2018 —
Tred R. Eyerly - Insurance Law HawaiiApplying Virginia law, the federal district court determined that the pollution exclusion did not bar coverage. Allied Prop. & Cas. Ins. Co. v. Zenith Aviation, Inc., 2018 U.S. Dist. LEXIS 14727 (E.D. Va. Aug. 29, 2018).
Zenith Aviation, Inc. hired Abby Construction Company to install an elevator at its warehouse. A wet saw was used to cut away concrete, but Abby did not use any water with the wet saw. This created a significant amount of concrete dust to leave the warehouse. Surrounding businesses contacted the fire department because they thought the dust was smoke from a fire. The concrete dust settled inside Zenith's building, damaging airplane parts stored in the warehouse.
Read the court decisionRead the full story...Reprinted courtesy of
Tred R. Eyerly, Damon Key Leong Kupchak HastertMr. Eyerly may be contacted at
te@hawaiilawyer.com
New York Assembly Reconsiders ‘Bad Faith’ Bill
May 31, 2021 —
Copernicus T. Gaza, Robert S. Nobel, Craig Rokuson, Eric D. Suben - Traub LiebermanThe New York State Assembly is considering A07285, which creates a private right of action for bad faith “if the insurer unreasonably refuses to pay or unreasonably delays payment without substantial justification.” The bill was first introduced in 2013 but was reintroduced on May 3, 2021 and has received some recent attention. According to the bill, an insurer acts unreasonably when it (among other things):
- Fails to provide the claimant with accurate information regarding policy provisions relating to the coverage at issue; or
- Fails to effectuate in good faith a prompt, fair, and equitable settlement of a claim or portion of a claim and where the insurer failed to reasonably accord at least equal or more favorable consideration to its insured's interests as it did to its own interests, and thereby exposed the insured to a judgment in excess of the policy limits or caused other damage to a claimant; or
- Fails to provide a timely written denial of a claimant's claim, or portion thereof, with a full and complete explanation of such denial, including references to specific policy provisions wherever possible; or
- Fails to act in good faith by compelling such claimant to initiate a lawsuit to recover under the policy by offering substantially less than the amounts ultimately recovered in such suit; or
- Fails to timely provide, on request of the policy holder or the policy holder's representative, all reports or other documentation arising from the investigation of a claim; or
- Refuses to pay a claim without conducting a reasonable investigation prior to such refusal.
Reprinted courtesy of
Copernicus T. Gaza, Traub Lieberman,
Robert S. Nobel, Traub Lieberman,
Craig Rokuson, Traub Lieberman and
Eric D. Suben, Traub Lieberman
Mr. Gaza may be contacted at cgaza@tlsslaw.com
Mr. Nobel may be contacted at rnobel@tlsslaw.com
Mr. Rokuson may be contacted at crokuson@tlsslaw.com
Mr. Suben may be contacted at esuben@tlsslaw.com
Read the court decisionRead the full story...Reprinted courtesy of