#6 CDJ Topic: Construction Defect Legislative Developments
December 30, 2015 —
Beverley BevenFlorez-CDJ STAFFRichard H. Glucksman,
Jon A. Turigliatto, and
David A. Napper of
Chapman Glucksman Dean Roeb & Barger discussed Right to Repair developments occurring in Nevada, Arizona, Florida, and Colorado in their article, “Right to Repair Reform: Revisions and Proposals to State’s ‘Right to Repair Statutes.”
Read the full story...
Texas also had changes that affected construction defect claims, as covered by
David H. Fisk of
Coleman & Logan PC: “Before filing a lawsuit or initiating an arbitration proceeding pertaining to a construction defect, a condominium association in Texas with eight or more units must now comply with the newly added Section 82.119 to Chapter 82 of the Texas Property Code. This is in addition to compliance with the Texas Residential Construction Liability Act (RCLA) and any preconditions included in the condominium association’s declarations.”
Read the full story...
Read the court decisionRead the full story...Reprinted courtesy of
Insurance Company Must Show that Lead Came from Building Materials
August 17, 2011 —
CDJ STAFFThe Fourth Circuit Court of Appeals for Louisiana has reversed the summary judgment of a lower court in the case of Widder v. Louisiana Citizens Property Insurance Company. Judge Roland L. Belsome wrote the opinion for the panel of three judges. Ms. Widder discovered that her home and its content were contaminated by lead. She applied to her insurer, Louisiana Citizens Property Insurance, which denied her claim.
In response to Ms. Widder’s suit, LCPIC applied for a summary judgment on the grounds that there was no physical loss and that the policy did not cover defective material, latents defects, and pollution damage.
The appeals court found that the lead contamination of Widder’s home did meet the standards of a direct physical loss, citing a recent Chinese Drywall case. There, it was found, “when a home has been rendered unusable or uninhabitable, physical damage is not necessary.”
The lower court addressed only one of LCPIC’s exclusions, addressing only the exclusion on basis of “faulty, inadequate or defective material.” The appeals court noted that the evidence offered at trial does not show that the building materials were the source of the lead. This provided the appeals court with a matter of fact to remand to the lower court.
Read the court’s decision…
Read the court decisionRead the full story...Reprinted courtesy of
Coping With The New Cap And Trade Law
January 04, 2023 —
John P. Ahlers - Ahlers Cressman & SleightOn May 17, 2021, Governor Jay Inslee signed a new carbon pricing bill making Washington only the second in the nation to have such an extensive climate-change reduction policy (Senate Bill 5126).
The Stated Purpose of the New Law:
SB5126 creates a system to cap carbon pollution and greenhouse gas emissions, and individual businesses are provided specific limits on emissions (“Cap”). Those businesses then have to purchase credits for allowed emissions.
The businesses which emit fewer greenhouse gases than the credits allotted them can sell their credits to businesses that are not reducing emissions as quickly (“Trade”). The overall pool of carbon credits are to be gradually reduced by 2050 to hit a goal of net-zero emissions. This bill is colloquially known as the “Cap and Trade Law.”
Read the court decisionRead the full story...Reprinted courtesy of
John P. Ahlers, Ahlers Cressman & SleightMr. Ahlers may be contacted at
john.ahlers@acslawyers.com
Trucks looking for Defects Create Social Media Frenzy
July 23, 2014 —
Beverley BevenFlorez-CDJ STAFFAccording to Willits News, slow-moving trucks with cameras attached rolled through Fort Briggs, attracting attention from homeowners in the community. People began mentioning the trucks on social media sites, with questions regarding what the cameras on the trucks were recording.
Osmose Utilities General Manager, Jason Milligan, told Willits News that the trucks were “surveying overhead power poles and lines for PG&E.”
"We're not looking for anything but what's overhead," Mulligan said, according to Willits News. "We find defects or issues with construction ... 20 or 30 feet off the ground, which are safety issues. We don't scan anything down towards people's homes."
Read the court decisionRead the full story...Reprinted courtesy of
Homeowner’s Policy Excludes Coverage for Loss Caused by Chinese Drywall
November 18, 2011 —
Tred R. Eyerly - Insurance Law HawaiiExclusions barred the homeowners from recovering for losses caused by Chinese drywall in their home. Ross v. C. Adams Const. & Design, L.L.C., 2011 La. App. LEXIS 769 (La. Ct. App., released for publication Oct. 5, 2011).
Two years after purchasing their home, the Rosses began experiencing chronic malfunctions in the heating, ventilation and air conditioning system. After discovering the presence of gypsum drywall, or "Chinese drywall", they submitted a claim to their insurer, Louisiana Citizens Property Insurance Company, for damages caused by the Chinese drywall. Louisiana Citizens denied the claim.
The Rosses sued. The trial court granted summary judgment to Louisiana Citizens based upon exclusions in the policy.
On appeal, the appellate court first agreed the Rosses had sustained a direct physical loss. The inherent qualities of the Chinese drywall created a physical loss to the home and the drywall had to be removed and replaced.
Read the full story…
Reprinted courtesy of Tred R. Eyerly, Insurance Law Hawaii. Mr. Eyerly can be contacted at te@hawaiilawyer.com
Read the court decisionRead the full story...Reprinted courtesy of
Digital Twins – Interview with Cristina Savian
February 11, 2019 —
Aarni Heiskanen - AEC BusinessIn this interview with Cristina Savian, we discuss the present and future of digital twins in the construction industry.
Cristina Savian is the founder and managing director at BE-WISE, a London based consultancy firm specialized in helping start-ups and SMEs to scale-up and bring new technologies into the construction market.
Cristina has over twenty years’ experience in the civil engineering and technology industries, working from small-scale traffic calming and parking schemes in UK and Italy, through to planning major events such as playing a key role as transport manager of the Greenwich Park venue during the London 2012 Olympic and Paralympic Games. She then moved to work for a multinational leading technology company, Autodesk, covering several global roles as technical and commercial lead across Europe and America.
Read the court decisionRead the full story...Reprinted courtesy of
Aarni Heiskanen, AEC BusinessMr. Heiskanen may be contacted at
aec-business@aepartners.fi
Consult with Counsel when Preparing Construction Liens
April 13, 2017 —
David Adelstein – Florida Construction Legal UpdatesAll too often entities prepare their own construction liens. Sure, it is an effective way to save a few bucks. No doubt about it. But, by doing so, you are (i) not relying on advice of counsel that is important when it comes to lien preparation and (ii) not relying on strategy that goes along with the preparation of a lien. When you are liening, the reason you are doing so is because you have not been paid. You therefore want to collateralize your nonpayment against the real property—the leverage of a construction lien. This is a very beneficial statutory tool if implemented correctly, so it only makes sense to do it “strategically” right.
A construction lien is a statutory form. So, how hard can it be? Filling out the “form” is not hard, however, there is legal significance to the information and amounts included in a lien. For instance:
- There is significance to the amount you are liening. Are you liening for disputed change order work? Are you liening for amounts unrelated to base contract work?
- There is significance to the final furnishing date. Are you liening within 90 days of performing base contract work unrelated to punchlist or warranty work?
- There is significance to date the Notice to Owner was served (if you are not in privity with the owner). Was the Notice to Owner served within 45 days of initial furnishing?
- There is significance to the legal description identified in the lien. Are you liening the right property based on the type of project you are working on?
- There can even be significance to the initial furnishing date. Assuming you are the general contractor, what was your initial furnishing date in comparison with when the Notice of Commencement was recorded? If you are not a general contractor, when was the initial furnishing date in comparison with when you served the Notice to Owner?
Read the court decisionRead the full story...Reprinted courtesy of
David Adelstein, Florida Construction Legal UpdatesMr. Adelstein may be contacted at
dadelstein@gmail.com
Courthouse Reporter Series: Two Recent Cases Address Copyright Protection for Architectural Works
January 16, 2024 —
Stu Richeson - The Dispute ResolverRecent decisions by the Seventh Circuit and the Eight Circuit have addressed the scope of protection afforded to architectural works under copyright law. The Seventh Circuit case of Design Basics, LLC v. Signature Constr., Inc., 994 F.3d 879 (7th Cir. 2021), took a somewhat narrow view of the copyright protection afforded to the design of an “affordable, multipurpose, suburban, single-family home.” In Designworks Homes, Inc. v. Columbia House of Brokers Realty, Inc., 9 F.4th 803 (8th Cir. 2021), cert. denied, 142 S. Ct. 2888, 213 L. Ed. 2d 1103 (2022) the Eight Circuit held that the publication of floor plans of a house in a real estate listing was not protected from claims of copyright infringement.
Design Basics, LLC v. Signature Constr., Inc., involved a plaintiff that the court described as holding registered copyrights in thousands of floor plans for suburban, single-family homes that are basic schematic designs, largely conceptual in nature, and depict layouts for one- and two-story single-family homes that include the typical rooms: a kitchen, a dining area, a great room, a few bedrooms, bathrooms, a laundry area, a garage, stairs, assorted closets, etc. The court described the plaintiff as a “copyright troll” and noted that litigation proceeds had become the principal revenue stream for the plaintiff. The plaintiff sued a contractor and related businesses contending hat the defendants had infringed plaintiff’s copyrighted floor plans.
Read the court decisionRead the full story...Reprinted courtesy of
Stu Richeson, PhelpsMr. Richeson may be contacted at
stuart.richeson@phelps.com