Washington Court of Appeals Divisions Clash Over Interpretations of the Statute of Repose
August 07, 2023 —
Masaki Yamada & Ryanne Mathisen - Ahlers Cressman & Sleight PLLCThe construction statute of repose under RCW 4.16.310 bars any claims arising from construction, design, or engineering of any improvement upon real property that has not accrued within six years after substantial completion or termination of services, whichever is later, even if the injury has not yet occurred.
On June 20, 2023, Division One of the Washington Court of Appeals (Div. I) published its decision in
Welch v. Air & Liquid Systems severely criticizing and rejecting the statute of repose reasoning contained in
Maxwell v. Atlantic Richfield Co., 15 Wn. App. 2d 569, 476 P.3d 645 (2020), a Division Two (Div. II) opinion.
More than a mere difference of opinion, the courts in Welch and Maxwell reached different results as to whether claims asserted against Brand Insulations, Inc. were barred by the statute of repose despite involving (i) the same procedural posture, both appeals from summary judgment decisions; (ii) the same facility, Atlantic Richfield Corporation’s (ARCO) petroleum refinery at Cherry Point in Ferndale; (iii) the same activity of installation of asbestos laden insulation on pipes; (iv) the same type of injury, mesothelioma; and (v) application of the same test set forth in Condit v. Lewis Refrigeration Co., 101 Wn.2d 106, 676 P.2d 466 (1984).
Reprinted courtesy of
Masaki Yamada, Ahlers Cressman & Sleight PLLC and
Ryanne Mathisen, Ahlers Cressman & Sleight PLLC
Mr. Yamada may be contacted at masaki.yamada@acslawyers.com
Ms. Mathisen may be contacted at ryanne.mathisen@acslawyers.com
Read the court decisionRead the full story...Reprinted courtesy of
EPA Can't Evade Enviro Firm's $2.7M Cleanup Site Pay Claim, US Court Says
January 25, 2021 —
Mary B. Powers - Engineering News-RecordA Richmond, Va., federal appeals court has restored an environmental consultant's legal fight for $2.7 million in federal funds to cover work at a Superfund cleanup site it managed, rejecting a lower court’s dismissal of its claim over a technicality.
Reprinted courtesy of
Mary B. Powers, Engineering News-Record
ENR may be contacted at ENR.com@bnpmedia.com
Read the full story... Read the court decisionRead the full story...Reprinted courtesy of
Homeowner's Claim for Collapse Survives Summary Judgment
September 20, 2017 —
Tred R. Eyerly - Insurance Law HawaiiThe insurer failed to present adequate evidence on summary judgment that damage caused by the collapse of a swimming pool was not covered. Klein v. State Farm Ins. Co., 2017 N.Y. Misc. LEXIS 3030 (Sup. Ct. N.Y. July 11, 2017).
Klein notified State Farm that his in-ground pool collapsed on February 5, 2014, with a side wall falling into the pool, causing damage to brick, borders and the patio around the pool. Upon inspection, State Farm's agent found that the cover of the pool had partially fallen into the pool, and that the vinyl pool liner had a tear. State Farm covered the damage to the pool liner, but denied coverage for the in-ground swimming pool walls, the brick border and the patio surrounding the pool. State Farm maintained that the loss was due to a "collapse," which was excluded under the homeowner's policy.
Read the court decisionRead the full story...Reprinted courtesy of
Tred R. Eyerly, Insurance Law HawaiiMr. Eyerly may be contacted at
te@hawaiilawyer.com
OSHA Finalizes PPE Fitting Requirement for Construction Workers
December 31, 2024 —
Jonathan H. Schaefer - Construction Law ZoneOn December 11, 2024, the Occupational Safety and Health Administration (OSHA) announced it finalized a revision to the personal protective equipment (PPE) standard for the construction industry. The
final rule adds specific language to the existing standard requiring employers to provide properly fitting PPE for construction industry workers. This change aligns the construction industry with the standards in place for the general industry.
According to OSHA, many types of PPE must properly fit workers. Improperly sized PPE can ineffectively protect workers, creating new hazards for them, such as oversized gloves or protective clothing being caught in machinery and discouraging use because of discomfort or poor fit. OSHA stated that the longstanding issue with improperly fitting PPE particularly impacted women, as well as physically smaller or larger workers.
Read the court decisionRead the full story...Reprinted courtesy of
Jonathan H. Schaefer, Robinson+ColeMr. Schaefer may be contacted at
jschaefer@rc.com
Construction Contract Terms Matter. Be Careful When You Draft Them.
February 01, 2022 —
Christopher G. Hill - Construction Law MusingsIn a prior post, I discussed the case of Fluor Fed. Sols., LLC v. Bae Sys. Ordinance Sys in the context of the interplay between fraud, contract, and statutes of limitation. Some cases just keep on giving. This time the case illustrates the need for careful drafting of those
pesky, and highly important, clauses in your construction documents.
In the
current iteration of this ongoing saga, the Court considered the contractual aspects of the matter. As a reminder, the facts are as follows: In May 2011, the United States Army (“Army) awarded BAE Systems Ordnance Systems, Inc. (“BAE”) a contract to design and construct a natural gas-fired combined heating and power plant for the Radford Army Ammunition Plant (“RAAP”). On October 7, 2015, BAE issued a request for a proposal from Fluor Federal Solutions, LLC (“Fluor”) to design and build a temporary boiler facility at a specific location on the RAAP property. On October 13, 2015, the Army modified the prime contract to change the location of the boiler facility. On December 10, 2015, the Army modified the prime contract to require BAE to design and construct a permanent boiler facility. On December 30, 2015, Fluor and BAE executed a fixed-price subcontract for Fluor to design and construct the temporary boiler. Throughout 2016, BAE issued several modifications to Fluor’s subcontract to reflect the modifications BAE received from the Army on the prime contract. On March 23, 2016, BAE directed Fluor to build a permanent – rather than temporary – boiler facility. On March 28, 2016, Fluor began construction of the permanent facility and began negotiations with BAE about the cost of the permanent facility. On September 1, 2016, the parties reached an agreement on the cost for the design of the permanent facility, but not on the cost to construct the permanent facility. On November 29, 2016, the parties executed a modification to the subcontract, officially replacing the requirement to construct a temporary facility with a requirement to construct a permanent facility and agreeing to “negotiate and definitize the price to construct by December 15, 2016.” The parties were unable to reach an agreement on the construction price.
Read the court decisionRead the full story...Reprinted courtesy of
The Law Office of Christopher G. HillMr. Hill may be contacted at
chrisghill@constructionlawva.com
Construction Jobs Expected to Rise in Post-Hurricane Rebuilding
November 07, 2012 —
CDJ STAFFBusinessweek reports that construction jobs and materials will see increased demand as property owners in New York and New Jersey rebuild after hurricane Sandy. Tom Jeffery, of Irvine, California-based CoreLogic, a real estate information service, noted that “a high percent of damaged properties are going to be repaired.” Experts estimate property damage to total anywhere from $7 billion to $40 billion.
It is also estimated that about 739,000 properties in the area are underwater in the way that has nothing to do with flooding, with negative equity of 25 percent or more. Many of these homeowners are likely to walk away from their mortgages.
Ken Simonson, chief economist of the Associated General Contractors of America, expects “localized spikes in construction employment throughout November and the winter.” Martin Connor, the chief financial officer of Toll Brothers, expects to see more a rise in labor costs than in materials.
Read the court decisionRead the full story...Reprinted courtesy of
Elevators Take Sustainable Smart Cities to the Next Level
May 26, 2019 —
Chris Smith - Construction ExecutiveFrom electric cars to solar panels, technology has been at the forefront of innovation in sustainability efforts. As greenhouse gas emissions continue to be a critical global concern, developing smart cities and sustainable energy practices are more important than ever.
In fact, Gartner predicts that by 2020, half of all smart city objectives will be centered around climate change, resilience and sustainability. To build truly intelligent cities, we need to optimize the sharing of information at a foundational level, starting with the structures on which these cities are built.
Where do we begin?
The United Nations estimates that almost 40 percent of today’s global greenhouse gas emissions come from buildings. To reduce these levels, the industry needs to begin creating smarter structures that use data insights to streamline functions in the building, and this starts with the infrastructural backbone: the elevator.
Reprinted courtesy of
Chris Smith, Construction Executive, a publication of Associated Builders and Contractors. All rights reserved.
Read the court decisionRead the full story...Reprinted courtesy of
New York Court of Appeals Takes Narrow View of Labor Law Provisions in Recent Cases
July 03, 2022 —
Lisa M. Rolle & Matthew Feinberg - Traub LiebermanSince the end of March, the New York State Court of Appeals has issued decisions in favor of the defense concerning New York Labor Law §240 and §241. These pro-defendant decisions take a narrow view of the scope of the Labor Law provisions. However, while it remains to be seen how the Court’s below will apply the Court of Appeal’s reasoning, these recent decisions are beneficial for the defense bar going forward.
In Toussaint v Port Auth. of N.Y. & N.J March 22, 2022 N.Y. LEXIS 391 | 2022 NY Slip Op 01955 | 2022 WL 837579, the Court held that 12 NYCRR 23-9.9 (a), does not set forth a concrete specification sufficient to give rise to a non-delegable duty under Labor Law § 241 (6). In Toussaint Plaintiff, who was an employee of Skanska USA Civil Northeast, Inc., brought the lawsuit against the Port Authority asserting claims under Labor Law § 200 (1) and Labor Law § 241 (6) after he was struck by a power buggy while operating a rebar-bending machine at the World Trade Center Transportation Hub construction site owned by the Port Authority of New York and New Jersey. Power buggies are small, self-operated vehicles used to move materials on construction sites. On the day of the accident, a trained and properly designated operator drove the buggy into the area near the plaintiff's workstation. That vehicle operator got off the vehicle, but short time thereafter, another worker—who was not designated or trained to do so—drove the buggy a short while prior to losing control and striking plaintiff. Plaintiff relied upon 12 NYCRR 23-9.9(a) which states that “[no person other than a trained and competent operator designated by the employer shall operate a power buggy.” In rejecting plaintiff’s argument the Court held that the "trained and competent operator" requirement is general, as it lacks a specific requirement or standard of conduct.
Reprinted courtesy of
Lisa M. Rolle, Traub Lieberman and
Matthew Feinberg, Traub Lieberman
Ms. Rolle may be contacted at lrolle@tlsslaw.com
Mr. Feinberg may be contacted at mfeinberg@tlsslaw.com
Read the court decisionRead the full story...Reprinted courtesy of