Tred R. Eyerly - Insurance Law HawaiiAfter carefully dissecting the earth movement exclusion, the court denied the insurer’s motion for summary judgment. High Street Lofts Condominium Assoc., Inc. v. Am. Family Mut. Ins. Co., 2011 U.S. Dist. LEXIS 109043 (D. Colo. Sept. 26, 2011).
The City of Boulder performed road repair work near High Street’s property, some of which involved the use of a vibrating compactor to compact and set the roadbed. High Street noticed damage to its building, such as cracks in walls, sloping of floors and separations of porches from the building itself. High Street contacted the City of Boulder, who forwarded the complaint to its contractor, Concrete Express, Inc.
High Street also filed a claim with its business insurer, American Family, who denied the claim. American Family relied on an opinion letter by High Street’s engineer. The letter indicated that the damage was the result of "soil consolidation/settlement," in response to the construction activities. Based on this letter American Family concluded the claim was excluded under the policy’s earth movement exclusion.
High Street sued American Family, who moved for summary judgment.
Read the full story...
Reprinted courtesy of Tred R. Eyerly, Insurance Law Hawaii. Mr. Eyerly can be contacted at te@hawaiilawyer.com
Read the court decisionRead the full story...Reprinted courtesy of
A Quick Checklist for Subcontractors
January 26, 2017 —
Christopher G. Hill – Construction Law MusingsAfter the last two weeks’ analyses of a couple of big construction decisions that came out recently, I thought I’d keep this week’s post practical and short for those that are not construction lawyers. So without further ado, here is a short checklist of the top things (aside from calling their local experienced construction attorney) a construction subcontractor should do or look for when reviewing a construction contract from a general contractor (and for a couple of these that a general contractor can look for in its prime contract).
- ALWAYS get a copy of the Prime Contract between the Owner and the General Contractor. This contract will contain terms that will “flow down” to you through the incorporation clause that almost every subcontract contains. You can’t do much to change these terms, but you will need to know them as the job progresses.
- READ every provision of the subcontract. I know this sounds simple, but not all subcontracts hide the red flags in the same places. Remember the details of a subcontract can sink you later if you aren’t prepared.
Read the court decisionRead the full story...Reprinted courtesy of
Christopher G. Hill, The Law Office of Christopher G. HillMr. Hill may be contacted at
chrisghill@constructionlawva.com
Additional Elements a Plaintiff Must Plead and Prove to Enforce Restrictive Covenant
April 19, 2021 —
David Adelstein - Florida Construction Legal UpdatesFlorida Statute s. 542.335 is a statute that deals with restrictive covenants in contracts that impose a restraint on trade. It is an important statute to determine invalid restraints on trade that unreasonably or unfairly prevent competition. Any invalid restraint on trade is unenforceable. Restrictive covenants–or covenants in agreements that restrict you or prevent you from doing something–may unsuspectingly be included in contracts or the impact of the restrictive covenant may not be appreciated at the onset.
A party seeking to enforce a restrictive covenant in a contract has the additional burden of PROVING the validity and reasonableness of the restrictive covenant:
Under section 542.335, three requirements must be satisfied for a restrictive covenant to be enforceable: (1) the restrictive covenant must be “set forth in a writing signed by the person against whom enforcement is sought”; (2) the party seeking to enforce the restrictive covenant “shall plead and prove the existence of one or more legitimate business interests justifying the restrictive covenant”; and (3) the party seeking to enforce the restrictive covenant “shall plead and prove that the contractually specified restraint is reasonably necessary to protect the legitimate business interest or interests justifying the restriction.”
Read the court decisionRead the full story...Reprinted courtesy of
David Adelstein, Kirwin Norris, P.A.Mr. Adelstein may be contacted at
dma@kirwinnorris.com
Will The New U.S.-Mexico-Canada Trade Deal Calm Industry Jitters?
January 13, 2020 —
Bruce Buckley - Engineering News-RecordNews that House Democrats and the Trump administration have come to an agreement on the United States-Mexico-Canada Agreement (USMCA) provided a bit of calm in the storm over trade policies that have roiled the construction market since 2017.
Bruce Buckley, Engineering News-Record
ENR may be contacted at ENR.com@bnpmedia.com
Read the full story... Read the court decisionRead the full story...Reprinted courtesy of
President Trump’s “Buy American, Hire American” Executive Order and the Construction Industry
June 05, 2017 —
Garret Murai - California Construction Law BlogOn April 18, 2017, President Trump signed Executive Order No. 13788 implementing his “Buy American, Hire American” campaign promise.
Federal construction contractors familiar with “Buy American” clauses in federal contracts under the Federal Acquisition Regulations (FAR)–which require materials to be manufactured in the United States (or, depending on the clause, not manufactured in certain countries) unless a waiver is obtained–have waited anxiously to see what Trump’s “Buy American, Hire American” promise would mean for them.
Well . . . as it turns out, not much, at least not yet.
Read the court decisionRead the full story...Reprinted courtesy of
Garret Murai, Wendel Rosen Black & Dean LLPMr. Murai may be contacted at
gmurai@wendel.com
Arbitrator May Use Own Discretion in Consolidating Construction Defect Cases
September 01, 2011 —
CDJ STAFFThe Mississippi Court of Appeals has ruled in the case of Harry Baker Smith Architects II, PLLC v. Sea Breeze I, LLC. Sea Breeze contracted with Harry Baker Smith Architects II, PLLC (HBSA) to design a condominium complex, which would be built by Roy Anderson Corporation. All parties agreed to arbitration.
Subsequently, Sea Breeze alleged defects and sought arbitration against the architectural firm and started a separate arbitration proceeding against the contractor. The special arbitrator appointed by the American Arbitrators Association determined that it would be proper to consolidate the two actions “since they arose from a common question of fact or law.” HBSA filed in chancery court seeking injunctive relief and a reversal of the decision. Sea Breeze and Roy Anderson filed a motion to compel the consolidated arbitration.
The court noted that the special arbitrator “established that the contract between Sea Breeze and Roy Anderson expressly allowed for consolidation of the two cases.” Further, the arbitrator “concluded that HBSA expressly agreed to consolidation by written consent through its 2008 letter, through which it insisted upon Roy Anderson’s involvement ‘in any mediation and/or arbitration.’”
The court concluded that the chancery court “did not have the power to fulfill HBSA’s request.” The court affirmed the chancery court’s judgment.
Read the court’s decision…
Read the court decisionRead the full story...Reprinted courtesy of
Join: Computer Science Meets Construction
August 20, 2018 —
Aarni Heiskanen - AEC BusinessIncreasingly, projects need to be optimized to create the most value for their clients and users. With the fragmented nature of project teams, decisions can be lost, communication sporadic, and information disjointed. In addition, the rapid pace of innovation means that it’s difficult – if not impossible – for architects and engineers to be aware of all the latest construction products and materials.
It is these problems that inspired the creation of Join. Join is a smart platform that helps project teams collaborate more efficiently and effectively, whether as part of a project optimization process or throughout the entire project lifecycle. The platform connects construction teams, pulls together different types of project information, and integrates manufacturing into construction.
Read the court decisionRead the full story...Reprinted courtesy of
Aarni Heiskanen, AEC BusinessMr. Heiskanen may be contacted at
aec-business@aepartners.fi
BHA’s Next MCLE Seminar in San Diego on July 25th
July 02, 2014 —
Beverley BevenFlorez-CDJ STAFFThere are just three weeks remaining to sign up for Bert L. Howe & Associate’s next California MCLE seminar, UNDERSTANDING CONSTRUCTION DEFECT LITIGATION.
This activity will be presented on Friday, July 25th at noon, in BHA’s San Diego offices, located at:
402 W. Broadway
Suite 400
San Diego, CA 92101
There is no cost for attendance at this seminar and lunch will be provided.
This course has been approved for Minimum Continuing Legal Education credit by the State Bar of California Committee on MCLE in the amount of 1.0 credit hours, of which 0.0 credit hours will apply to legal ethics/professional responsibility credit. The seminar will be presented by Charlie Miller, general contractor and project manager.
Water intrusion through doors, windows and roofing systems, as well as soil and foundation-related movement, and the resultant damage associated therewith, are the triggering effects for the vast majority of homeowner complaints today and serve as the basis for most residential construction defect litigation. The graphic and animation-supported workshop/lecture activity will focus on the residential construction process from site preparation through occupancy, an examination of associated damages most often encountered when investigating construction defect claims, and the inter-relationships between the developer, general contractor, sub trades and design professionals. Typical plaintiff homeowner/HOA expert allegations will be examined in connection with those building components most frequently associated with construction defect and claims litigation.
The workshop will examine:
• Typical construction materials, and terminology associated with residential construction
• The installation process and sequencing of major construction elements, including interrelationship with other building assemblies
• The parties (subcontractors) typically associated with major construction assemblies and components
• An analysis of exposure/allocation to responsible parties.
Attendance at THE UNDERSTANDING CONSTRUCTION DEFECT LITIGATION seminar will provide the attendee with:
• A greater understanding of the terms and conditions encountered when dealing with common construction defect issues
• A greater understanding of contractual scopes of work encountered when reviewing construction contract documents
• The ability to identify, both quickly and accurately, potentially responsible parties
• An understanding of damages most often associated with construction defects, as well as a greater ability to identify conditions triggering coverage
To register for the event, please email Charlie Miller at cmiller@berthowe.com. If you have any questions, please feel free to contact Charlie at (800) 482-1822 (office) or (714) 353-1959 (cell).
Read the court decisionRead the full story...Reprinted courtesy of