Insured's Expert Qualified, Judgment for Coverage Affirmed
December 15, 2016 —
Tred R. Eyerly – Insurance Law HawaiiAddressing a host of issues on appeal, the Texas Court of Appeals affirmed the trial court's judgment against the insurer for property damage caused by Hurricane Ike. Nat'l Sec. Fire & Cas. Co. v. Henriquez, 2016 Tex. App. LEXIS 11391 (Tex. Ct. App. Oct. 20, 2016), withdrawn and substituted by 2016 Tex. App. LEXIS 12766 (Tex. Ct. app. Dec. 1, 2016).
The insureds alleged property damage to their home caused by the hurricane. The roof was damaged, resulting in interior water damage. Sheetrock, exterior bricks, windows, walls cabinets and insulation throughout the entire home were damaged. The insureds also alleged that the home shifted during the storm, causing the foundation to not be level and the ceilings and walls to crack. Personal property within the dwelling was also damaged.
Read the court decisionRead the full story...Reprinted courtesy of
Tred R. Eyerly, Insurance Law HawaiiMr. Eyerly may be contacted at
te@hawaiilawyer.com
Clean Energy and Conservation Collide in California Coastal Waters
March 19, 2024 —
Nadia Lopez & Josh Saul - BloombergTwo of President Joe Biden’s biggest priorities — conservation and the switch to clean energy — are colliding in the ocean off California’s quiet Central Coast.
Located halfway between San Francisco and Los Angeles, Morro Bay boasts a rich ecosystem of fish, otters and migrating whales that the Indigenous Chumash people want to protect with a
new marine sanctuary. But 20 miles (32 kilometers) out, developers plan some of the West Coast’s
first offshore wind farms, where 1,100-foot-tall turbines (335 meters) tethered to the seabed will help California cut its carbon emissions.
One US government agency appears poised to approve the sanctuary. Another
already leased 376 square miles of ocean for wind development, just outside the sanctuary’s boundaries. Now, a fight is brewing over whether the scenic bay itself should be left out of the sanctuary, to give undersea power cables from the wind farms a place to come onshore.
Reprinted courtesy of
Nadia Lopez, Bloomberg and
Josh Saul, Bloomberg Read the court decisionRead the full story...Reprinted courtesy of
Contractor Sues Golden Gate Bridge District Over Suicide Net Project
December 18, 2022 —
James Leggate - Engineering News-RecordThe project to install a suicide-deterrence net and perform other upgrades on the Golden Gate Bridge in San Francisco now is expected to complete five years late and cost more than double the original contract price, its contractors say. The joint venture leading the project filed a breach-of-contract complaint against the agency that manages the bridge seeking $195 million in damages, while the agency counters that delays were caused by changes in the contractor’s ownership.
Reprinted courtesy of
James Leggate, Engineering News-Record
Mr. Leggate may be contacted at leggatej@enr.com
Read the full story... Read the court decisionRead the full story...Reprinted courtesy of
Supreme Court Holds Arbitrator can Fully Decide Threshold Arbitrability Issue
March 18, 2019 —
David Adelstein - Florida Construction Legal UpdatesThe United States Supreme Court recently decided parties to a contract can agree, under the Federal Arbitration Act, an arbitrator, rather than a court, can fully resolve the initial arbitrability question. Henry Schein, Inc. v. Archer and White Sales, Inc., 2019 WL 122164 (2019). The arbitrability question is whether the dispute itself is subject to arbitration under an arbitration provision. Parties that do not want to arbitrate try to circumvent this process by filing a lawsuit and asking the court to determine the threshold arbitrability question.
In Henry Schein, Inc., the contract at-issue provided:
This Agreement shall be governed by the laws of the State of North Carolina. Any dispute arising under or related to this Agreement (except for actions seeking injunctive relief and disputes related to trademarks, trade secrets, or other intellectual property) shall be resolved by binding arbitration in accordance with the arbitration rules of the American Arbitration Association. The place of arbitration shall be in Charlotte, North Carolina.
The plaintiff in this case asserted a claim for injunctive relief (among other claims) and argued that, therefore, the dispute is not subject to arbitration based on the exception in the provision. The initial, threshold issue became whether the dispute was subject to arbitration and, importantly, who decides this issue. The Court further looked at whether a trial court can resolve this issue under the “wholly groundless” exception, i.e.,the court can decide the issue if the argument for arbitration is wholly groundless.
Read the court decisionRead the full story...Reprinted courtesy of
David Adelstein, Kirwin NorrisMr. Adelstein may be contacted at
dma@kirwinnorris.com
When Do Hard-Nosed Negotiations Become Coercion? Or, When Should You Feel Unlucky?
October 21, 2019 —
Stan Millan, Jones Walker, LLP - ConsensusDocsConflict in a negotiation is to be expected and is arguably healthy for the process. Owners and contractors are constantly engaged in negotiations; whether it be negotiating changes to the work, changes to the schedule, or changes to the contractual terms. But at what point does taking a strong position in a negotiation cross the line and become coercion or bad faith?
A recent decision from the Armed Services Board of Contract Appeals touched on this very issue. While this is a government contract case, the issues discussed in this case (namely negotiating a change) are routinely encountered in just about every construction project. This decision is instructive because it adds to a trending line of cases that limit an owner’s and contractor’s negotiation tactics.
On August 5, 2019, the board issued an opinion in the appeal of Sand Point Services, LLC vs. NASA, ASBCA Nos. 6189. In Sand Point Services, the contractor was hired by the owner to repair the Wallops Flight Facility’s aircraft parking apron. During its work, the contractor hit a differing site condition, namely unsuitable soils. The contractor sought additional time and money for this differing site condition. The owner ultimately responded with a show cause letter to the contractor claiming, among other breaches, that the contractor was significantly behind schedule. This was generally viewed by all parties as the start of default proceedings against the contractor.
Read the court decisionRead the full story...Reprinted courtesy of
Stan Millan, Jones Walker, LLPMr. Millan may be contacted at
smillan@joneswalker.com
Toxic Drywall Not Covered Under Homeowner’s Policy
March 28, 2012 —
CDJ STAFFThe Duphuys of Baton Rouge Louisiana found themselves needing to argue both sides of an issue, according to the judge in Duphuy v. USAA Casualty Insurance Company. The Duphuys alleged that the drywall in their home “emits odorous gases that cause damage to air-condition and refrigerator coils, copper tubing, electrical wiring, computer wiring, and other household items.” Additionally, they reported damage to “their home’s insulation, trimwork, floors, cabinets, carpets, and other items” which they maintained were “covered under the ‘ensuing loss’ portion of their policy.”
Their insurer declined coverage, stating that the damages were not a “direct, physical loss,” and even if they were “four different exclusions independently exclude coverage, even if such loss occurred.” The policy excludes defective building materials, latent defects, pollutants, and corrosion damage. The court noted that “ambiguities in policy exclusions are construed to afford coverage to the insured.”
The court did determine that the Duphuys were not in “a situation where the plaintiffs caused the risk for which they now seek coverage.” The judge cited an earlier case, In re Chinese Drywall, “a case with substantially similar facts and construing the same policy” and in that case, “property damage” was determined to “include the loss of use of tangible property.” The court’s conclusion was that the Duphuys “suffered a direct, physical loss triggering coverage under their policy.”
Unfortunately for the Duphuys, at this point the judge noted that while they had a “direct, physical loss,” the exclusions put them “in the tough predicament of claiming the drywall is neither defective nor its off-gassing corrosive or a pollutant, but nonetheless damage-causing.”
In the earlier Chinese Drywall case, the judge found that “faulty and defective materials” “constitutes a physical thing tainted by imperfection or impairment.” The case “found the drywall served its intended purpose as a room divider and insulator but nonetheless qualified under the exclusion, analogizing the drywall to building components containing asbestos that courts have previously determined fit under the same exclusion.” In the current case, the judge concluded that the drywall was “outside the realm of coverage under the policy.”
The court also found that it had to apply the corrosion exclusion, noting that the plaintiffs tried to evade this by stating, “simplistically and somewhat disingenuously, that the damage is not caused by corrosion but by the drywall itself.” The plaintiffs are, however, parties to another Chinese drywall case, Payton v. Knauf Gips KG, in which “they directly alleged that ‘sulfides and other noxious gases, such as those emitted from [Chinese] drywall, cause corrosion and damage to personal property.’” As the court pointed out, the Duphuys could not claim in one case that the corrosion was caused by gases emitted by the drywall and in another claim it was the drywall itself. “They hope their more ambiguous allegations will be resolved in their favor and unlock the doors to discovery.”
The court quickly noted that “the remaining damage allegations are too vague and conclusory to construe” and permitted “exploration of the latent defect and pollution exclusions.”
The judge concluded that the plaintiffs did not provide sufficient facts to establish coverage under the ensuing loss provision, stating that the “plaintiffs must allege, at the very least, how the drywall causes damage to the trimwork, carpet, etc., not simply that it does so.” Given the court’s determinations in the case, the plaintiffs’ motion was dismissed.
Read the court’s decision…
Read the court decisionRead the full story...Reprinted courtesy of
In All Fairness: Illinois Appellate Court Finds That Arbitration Clause in a Residential Construction Contract Was Unconscionable and Unenforceable
August 22, 2022 —
Gus Sara - The Subrogation StrategistIn Bain v. Airoom, LLC, No. 1-21-001, 2022 Ill. App. LEXIS 241, the Appellate Court of Illinois (Appellate Court) considered whether the lower court erred in enforcing an arbitration clause in a construction contract between the parties and, as a result, dismissing the plaintiff’s lawsuit. The Appellate Court found that even if the arbitration clause was enforceable, the appropriate action would have been for the court to stay the lawsuit, as opposed to dismissing the case entirely. The Appellate Court then considered the language of the arbitration clause and found that several provisions were substantively unconscionable, which rendered the entire arbitration clause unenforceable. The Appellate Court reversed the lower court’s decision compelling arbitration and reinstated the plaintiff’s complaint.
In 2018, the plaintiff, Ms. Bain, a disabled senior citizen, hired the defendant, Airoom, LLC (Airoom), to renovate her home. Airoom provided its “Cash Sales Contract,” which included a binding arbitration clause. The clause required that any dispute arising or relating to the contract be resolved by binding arbitration through the American Arbitration Association (AAA), using the Construction Industry Arbitration Rules and Mediation Procedures (Construction Industry Rules).
Read the court decisionRead the full story...Reprinted courtesy of
Gus Sara, White and WilliamsMr. Sara may be contacted at
sarag@whiteandwilliams.com
Arctic Fires Are Melting Permafrost That Keeps Carbon Underground
December 27, 2021 —
Eric Roston - BloombergFew things signal something's gone haywire on the planet quite like frozen land on fire. Now scientists have determined that Arctic fires, even milder ones, can reshape a landscape for decades, in ways that may make it even harder to keep global heating from eclipsing international goals.
It's mostly rising temperatures that are thawing out frozen Arctic ground but northern blazes — already increasing — are now understood to play a disproportionate role, according to a study
published last week in the journal
One Earth.
Previous research has shown that higher temperatures, drier soil and more lightning storms will lead to
more fires. That work, with the new paper, mean that “in the future we might expect to see an outsized influence on thaw from the fires that will likely increase," said Róisín Commane, a Columbia University assistant professor who studies atmospheric composition and wasn’t involved in the new study.
Read the court decisionRead the full story...Reprinted courtesy of
Eric Roston, Bloomberg