Indiana Court of Appeals Rules Against Contractor and Performance Bond Surety on Contractor's Differing Site Conditions Claim
April 03, 2013 —
Brian M. Falcon - Frost Brown Todd LLCEarlier this year, the Indiana Court of Appeals issued an important opinion that impacts contractors and sureties alike. The decision should give contractors in Indiana pause before ceasing work while a dispute with the owner is pending. Sureties also have been placed on notice that strict compliance with the terms of their bonds is amongst their best defenses to claims made by owners and bond claimants.
In Dave's Excavating, Inc. and Liberty Mutual Insurance Co. v. City of New Castle, Indiana, 959 N.E.2d 369 (Ind. Ct. App. 2012), the contractor (“Dave’s”) was the successful bidder on a public sanitary sewer and water main extension project. Dave's procured a performance bond from Liberty Mutual to guarantee its performance obligations to the owner (the "City"). After encountering what it deemed different subsurface conditions—and indeed after having been previously granted a change order to use excavated materials as backfill in light of the subsurface conditions on site—Dave’s placed the project engineer on notice of a differing site conditions claim. The total claim amounted to an 84% increase in the total contract price. With the claim, Dave's advised the project engineer it was ceasing further work until the project engineer provided direction.
While the project engineer reviewed the claim, it reminded Dave's of its contractual obligation to "carry on the work and adhere to the progress schedule during all disputes or disagreements with the OWNER." A dispute immediately occurred regarding whether Dave's was required to continue to work while the project engineer resolved the differing site condition claim. After Dave's maintained its position that it was not required to continue to work, the project engineer placed it on notice of default and copied the letter to Liberty Mutual.
Read the court decisionRead the full story...Reprinted courtesy of
Brian M. FalconBrian M. Falcon can be contacted at http://www.frostbrowntodd.com/contact.html
Anti-Assignment Provision Unenforceable in Kentucky
December 20, 2012 —
TRED EYERLY, INSURANCE LAW HAWAIIOn a certified question from the Federal District Court, the Supreme Court of Kentucky decided that an anti-assignment provision in a policy is unenforceable.
Wehr Constructors v. Paducah Div. Assur. Co. of Am., 2012 Ky. LEXIS 183 (Ky. Oct. 25, 2012).
Before building an addition to its hospital, Murray Calloway County Hospital purchased a builder's risk policy from Assurance Company of America.The policy provided, "Your rights and duties under this policy may not be transferred without Assurance's written consent . . . ." The Hospital contracted with Wehr Constructors to install concrete subsurfaces and vinyl floors in order to expand the hospital. After installation, a portion of the floors and subsurface work was damaged. The Hospital submitted a claim to Assurance for $75,000, but the claim was denied.
Wehr sued the Hospital to recover money for its work on the construction project. In settling the case, the Hospital assigned to Wehr any claim or rights the Hospital had against Assurance.
Read the court decisionRead the full story...Reprinted courtesy of
Tred R. Eyerly, Insurance Law Hawaii.Mr. Eyerly can be contacted at
te@hawaiilawyer.com
Managing Once-in-a-Generation Construction Problems – Part II
April 03, 2023 —
Jeffrey S. Wertman - Construction ExecutivePart I of this series discussed the benefits of construction participants using alternative project delivery methods and properly addressing change order issues, rising costs and payment structure issues to manage construction during these uncertain times. Part II below explores the possibility that higher prices and steady consumer demand could lead to an increase in unscrupulous contractor practices—and how owners can mitigate that risk, managing the challenges posed by the unforeseen labor shortage and turnover in the industry and evolving your construction team for short-term and long-term success.
Higher Prices and Steady Demand
With the demand for construction projects relatively stable, contractors remaining in high demand and a surge in prices for construction materials and components, owners are under great pressure to accept less favorable construction terms. This has presented unscrupulous contractors with perceived leverage over owners and new opportunities to engage in questionable business practices and fraud. Although some contractors may seek to stretch the boundaries of a construction contract, other contractors are more deliberate. Falsifying payment applications and invoices to inflate labor or materials costs, billing for work not yet performed or materials not yet delivered to the project site and manipulating change orders are examples of illicit and fraudulent practices by contractors.
Reprinted courtesy of
Jeffrey S. Wertman, Construction Executive, a publication of Associated Builders and Contractors. All rights reserved.
Read the court decisionRead the full story...Reprinted courtesy of
Georgia Local Government Drainage Liability: Nuisance and Trespass
November 29, 2021 —
David R. Cook Jr. - Autry, Hall & Cook, LLPA long-running dispute between a landowner and a municipality has escalated to the Georgia Court of Appeals and in the federal court for the Northern District of Georgia.[1] The municipality maintained a stormwater system that discharged on property uphill from the landowner’s property. The uphill property was used as an illegal dump, and debris washed downhill from the dump to the landowner’s property. The debris clogged the landowner’s surface water drainage system, which caused flooding of the property and a building.
State Case
The landowner sued for trespass, nuisance, takings, and inverse condemnation. While the other claims were barred by the four-year statute of limitations, the court addressed the plaintiff-landowner’s claim for continuing nuisance.
Municipalities may be liable when they negligently construct or maintain a sewer or drainage system that causes repeated flooding of property, such that it results in a continuing, abatable nuisance.[2] For a municipality to be liable for maintenance of a nuisance:
the municipality must be chargeable with performing a continuous or regularly repetitious act, or creating a continuous or regularly repetitious condition, which causes the hurt, inconvenience or injury; the municipality must have knowledge or be chargeable with notice of the dangerous condition; and, if the municipality did not perform an act creating the dangerous condition, . . . the failure of the municipality to rectify the dangerous condition must be in violation of a duty to act.[3]
Read the court decisionRead the full story...Reprinted courtesy of
David R. Cook Jr., Autry, Hall & Cook, LLPMr. Cook may be contacted at
cook@ahclaw.com
Colorado’s Three-Bill Approach to Alleged Construction Defect Issues
May 01, 2014 —
Beverley BevenFlorez-CDJ STAFFAccording to the Denver Post, two Colorado construction defect bills have “made their way out of the Senate Affairs Committee Wednesday, with a third reportedly on its way.”
The two bills that have made it out of committee are SB 219 and SB 216: “SB 219 would require the Colorado Division of Housing to prepare a study to present to legislators before March 15, 2015, on why there isn't more affordable housing construction in the state,” the Denver Post reported. “SB 216 directs the Colorado Division of Housing to design a program to rebate a portion of the insurance premiums builders pay as a way to boost their willingness to build more projects.”
However, a third bill would require “homeowners to pursue arbitration or mediation before litigation.”
All three bills are sponsored by Sen. Jessie Ulibarri, D-Commerce City.
Read the court decisionRead the full story...Reprinted courtesy of
Emotional Distress Damages Not Distinct from “Annoyance and Discomfort” Damages in Case Arising from 2007 California Wildfires
November 21, 2017 —
Kirsten Lee Price & Lawrence S. Zucker II - Haight Brown & Bonesteel LLPOriginally published by CDJ on February 16, 2017
In Hensley v. San Diego Gas & Elec. Co., (No. D070259, filed 1/31/17), the California Court of Appeal for the Fourth Appellate District held that emotional distress damages are available on claims for trespass and nuisance as part of “annoyance and discomfort” damages.
In Hensley, plaintiffs sustained fire damage to their home and property during the 2007 California wildfires. The Hensleys were forced to evacuate as the fires advanced. Although their home was not completely destroyed, it sustained significant damage and they were not able to return home permanently for nearly two months. Thereafter, the Hensleys filed suit against San Diego Gas and Electric Company (“SDG&E”) asserting causes of action for trespass and nuisance, among others. Mr. Hensley, who had suffered from Crohn’s disease since 1991, further claimed that as a result of the stress from the fire, he experienced a substantial increase in his symptoms and his treating physician opined that “beyond a measure of reasonable medical certainty... the stress created by the 2007 San Diego fires caused an increase of [Mr. Hensley’s] disease activity, necessitating frequent visits, numerous therapies, and at least two surgeries since the incident.” SDGE moved, in limine, to exclude evidence of Mr. Hensley’s asserted emotional distress damages arguing he was not legally entitled to recover them under theories of trespass and nuisance. The trial court agreed and excluded all evidence of such damages.
Reprinted courtesy of
Kirsten Lee Price, Haight Brown & Bonesteel LLP and
Lawrence S. Zucker, Haight Brown & Bonesteel LLP
Ms. Price may be contacted at kprice@hbblaw.com
Mr. Zucker may be contacted at lzucker@hbblaw.com
Read the court decisionRead the full story...Reprinted courtesy of
Waiver Of Arbitration by Not Submitting Claim to Initial Decision Maker…Really!
August 30, 2021 —
David Adelstein - Florida Construction Legal UpdatesArbitration is a form of dispute resolution that is a creature of contract. If you want an arbitrator to resolve your disputes, you need to ensure there is an arbitration provision in your contract. There are pros and cons to arbitration. One con is you lose the right to appeal. A couple of pros, however, are that your arbitrator(s), which you generally have some control in the selection of, will be versed in the construction industry and it can be a more efficient forum to resolve disputes in the times of COVID. Once you have your scheduling conference with the appointed arbitrator(s), you will be able to agree upon a set final hearing (trial) time and have milestone dates that work backwards from the final hearing date. This is much more efficient than being placed on an unrealistic trial docket or having to deal with the gamesmanship of motions just to be able to get your case at-issue for trial.
However, the right to arbitrate your dispute can be waived. This was the issue in Leder v. Imburgia Construction Services, Inc., 2021 WL 3177338 (Fla. 3d DCA 2021), which I will be the first to tell you the ruling is quite baffling to me. In a nutshell, the contractor, by not complying with the submission of a claim to the Initial Decision Maker was found to have waived the dispute resolution provision in the AIA contract. Not sure this makes sense, but this was the ruling.
Read the court decisionRead the full story...Reprinted courtesy of
David Adelstein, Kirwin Norris, P.A.Mr. Adelstein may be contacted at
dma@kirwinnorris.com
PFAS and the Challenge of Cleaning Up “Forever”
July 31, 2023 —
PFAS Team - Gravel2Gavel Construction & Real Estate Law BlogFrom a stream of legal challenges, to ever-expanding regulations on things like cosmetics and drinking water, PFAS are the “forever chemicals” keeping companies and consumers on high alert. While industries scramble to remove the synthetic compounds from products, scientists are researching new techniques for scrubbing PFAS from the environment. There is money to be had for those who can find a more streamlined method of purging the substances—the U.S. Army Corps of Engineers has an $800 million contract on the table for the handling, destruction and replacement of PFAS-laden fire-fighting foam—leaving technology companies racing to create solutions. The three main PFAS cleaning techniques currently relied upon can be very effective but are also costly and may leave questionable byproducts in their wake.
The established approaches include:
- Granular Activated Carbon. As one of the most studied treatments for PFAS removal, granular activated carbon is often used in water treatment plants. Large beds of carbon essentially soak up the unwanted chemicals. After the Sweeney Water Plant in North Carolina, whose water source is downstream from a fluorochemical-producing Chemours plant, was found to be contaminated with PFAS, the plant invested around $46 million into upgraded activated carbon systems. Once installed, these systems cost roughly $2.9 million to operate yearly, as the carbon needs to be replaced each time it reaches capacity. Though pricey, the plant says that the process now clears close to 100% of PFAS.
Read the court decisionRead the full story...Reprinted courtesy of
PFAS Team, Pillsbury