Repairs to Water Infrastructure Underway After Hurricane Helene
October 07, 2024 —
Derek Lacey - Engineering News-RecordAs transportation officials in Tennessee and North Carolina brace for long rebuilds of heavily damaged interstates in remote and rugged areas of the Appalachian Mountains, local agencies are also at work restoring water and sewer services to residents nearly one week after Hurricane Helene made landfall.
Reprinted courtesy of
Derek Lacey, Engineering News-Record
Mr. Lacey may be contacted at laceyd@enr.com
Read the full story... Read the court decisionRead the full story...Reprinted courtesy of
Monumental Museum Makeover Comes In For Landing
May 28, 2024 —
Jim Parsons - Engineering News-RecordAfter more than 40 years of chronicling the nation’s storied exploration of the sky and heavens, the Smithsonian Institution’s National Air and Space Museum in Washington, D.C., was, in a word, tired.
Reprinted courtesy of
Jim Parsons, Engineering News-Record
ENR may be contacted at enr@enr.com
Read the full story... Read the court decisionRead the full story...Reprinted courtesy of
Minnesota Civil Engineers Give the State's Infrastructure a "C" Grade for the Second Time
May 02, 2022 —
American Society of Civil EngineersSAINT PAUL, Mn. — The Minnesota Section of the
American Society of Civil Engineers (ASCE) today released preliminary findings from the 2022
Report Card for Minnesota's Infrastructure, with 10 categories of infrastructure receiving an overall grade of a 'C', meaning Minnesota's infrastructure is in mediocre condition. Minnesota has taken steps to make its infrastructure network more sustainable to withstand increasingly severe weather, but additional steps must be taken as the state's infrastructure is aging. Funding has been limited for systems throughout the state, particularly for surface transportation networks, and local and state funding must be increased to bring these critical systems up to speed. Civil engineers graded aviation (B), bridges (C), dams (C), drinking water (C-), energy (C), parks (B-), ports (C-), roads (D+), transit (C-) and wastewater (C).
"The ASCE report card serves as an important benchmark for where our infrastructure currently stands and lays out how we can make improvements," said Sen. Sandy Pappas, DFL-St. Paul. "Knowing that these systems play such a crucial role in economic progress and the safety of Minnesotan families, we have made infrastructure a topline issue and must continue to do so to secure a prosperous future here in Minnesota."
ABOUT THE AMERICAN SOCIETY OF CIVIL ENGINEERS
Founded in 1852, the American Society of Civil Engineers represents more than 150,000 civil engineers worldwide and is America's oldest national engineering society. ASCE works to raise awareness of the need to maintain and modernize the nation's infrastructure using sustainable and resilient practices, advocates for increasing and optimizing investment in infrastructure, and improve engineering knowledge and competency. For more information, visit www.asce.org or www.infrastructurereportcard.org and follow us on Twitter, @ASCETweets and @ASCEGovRel.
Read the court decisionRead the full story...Reprinted courtesy of
WA Supreme Court Allows Property Owner to Sue Engineering Firm for Lost Profits
February 25, 2014 —
Beverley BevenFlorez-CDJ STAFFIn the Daily Journal of Commerce, Scott A. Smith and James H. Wendell discussed the recent Washington Supreme Court decision in Donatelli v D. R. Strong Consulting Engineers. The court’s ruling casts “doubt on a company's ability to limit its liability for economic losses arising out of a contract dispute.”
The Donatellis hired D. R. Strong Consulting Engineers to develop vacant land in King County, however, the “project did not go according to plan and the real estate market collapsed before the project was completed,” according to the Daily Journal of Commerce. The “Donatellis lost their property through foreclosure” and then “sued the engineering firm for more than $1.5 million in lost profits.”
D. R. Strong Consulting Engineers asked for the negligence claims to be dismissed “because the parties' contract contained a provision limiting the engineering firm's liability to the amount of its fee for ‘any injury or loss on account of any error, omission, or other professional negligence.’” However, the Washington Supreme Court ruled that “the case could proceed in the trial court on a theory that the engineers could be liable if they made negligent misrepresentations that induced the Donatellis to enter into the contract in the first place.”
Smith and Wendell stated that because of “this decision, engineering, architectural, construction, and other professional service companies may now face damage claims they thought they were contractually protected against.”
Read the court decisionRead the full story...Reprinted courtesy of
Fire Damages Unfinished Hospital Tower at NYU Langone Medical Center
December 15, 2016 —
Jeff Rubenstone – Engineering News-RecordA fire broke out Dec. 14 at a hospital tower under construction at NYU Langone Medical Center in New York City. The blaze sent a column of thick black smoke up through the Manhattan skyline.
Read the court decisionRead the full story...Reprinted courtesy of
Jeff Rubenstone, Engineering News-RecordMr. Rubenstone may be contacted at
rubenstonej@enr.com
A Court-Side Seat: A Poultry Defense, a Houston Highway and a CERCLA Consent Decree that Won’t Budge
March 22, 2021 —
Anthony B. Cavender - Gravel2GavelFebruary saw the usual array of significant environmental decisions and federal regulatory notices.
THE FEDERAL COURTS
U.S. Court of Appeals for the District of Columbia
Luminant Generation v. EPA
The court will be grappling with a difficult venue case governed by the Clean Air Act (42 USC Section 7607(b)). In 2013, the U.S. Court of Appeals for the Fifth Circuit decided the case of Luminant Generation v. EPA (714 F. 3d 841), in which the court upheld the affirmative defenses that were made part of the Texas State Implementation Plan (SIP) and which applied to certain unpermitted emissions from regulated sources during periods of startup, shutdown or malfunction. These defenses were challenged in the Fifth Circuit and were rejected. On the national stage, EPA has been involved in litigation over these affirmative defenses and recently excluded from a “SIP Call” the Texas program, which was carved out. This EPA decision is being challenged in the DC Circuit (see Case number 20-1115),with the State of Texas arguing as an intervenor that any issues involving Texas belong in the Fifth Circuit, and not in the DC Circuit because the Act allows regional issues to be decided in the regional federal courts.
Read the court decisionRead the full story...Reprinted courtesy of
Anthony B. Cavender, PillsburyMr. Cavender may be contacted at
anthony.cavender@pillsburylaw.com
What are the Potential Damages when a House is a Lemon?
September 01, 2016 —
Haldon L. Greenberg, Esq. – Florida Construction Law NewsIt seems that lemons are front page news these days. Beyonce just released a chart-topping[1] album all about what to do when life hands you lemons. In today’s vernacular, we use the term “Lemon” to describe a person or thing that is unsatisfactory, disappointing, or feeble.[2] In Florida, there is a “Lemon Law” that provides a way for consumers to receive a replacement or full refund for vehicles found to have defects which may affect the vehicle’s safety, value or use.[3] While there is no “Lemon Law” for construction projects, in Gray v. Mark Hall Homes, Inc.,[4] Florida’s Second District Court of Appeal cited to Florida Supreme Court precedent in holding that a home builder was on the hook for the entire contract value of a home he contracted to build for the Plaintiff, when it was revealed the home was a “Lemon”, or as the evidence at trial showed, “valueless.”
Read the court decisionRead the full story...Reprinted courtesy of
Haldon L. Greenberg, Esq., Cole, Scott & Kissane, P.A.Mr. Greenberg may be contacted at
haldon.greenburg@csklegal.com
Nebraska Joins the Ranks—No CGL Coverage for Faulty Work
September 17, 2014 —
Craig Martin – Construction Contractor AdvisorThe Nebraska Court of Appeals has ruled that a home builder that fails to adequately compact the soil does not have insurance coverage to repair damages to the home caused by the settling soil. In “insurance speak”, there was no occurrence to trigger coverage.
In this case, Cizek Homes, Inc. v Columbia National Insurance Company, a home builder contracted with a buyer to build a house. A lot was selected and the home was built. After the buyer moved in, the house started to settle, causing damage to the house. The buyer told the builder about these problems and the builder agreed to fix the problems. The builder also contacted its insurance company and requested coverage for the buyer’s claim. The insurer rejected the claim, determining that the buyer’s claim was not covered by the builder’s Commercial General Liability (CGL) insurance.
The insurer then filed suit asking the court to interpret the insurance policy and to determine whether the CGL insurance covered the claim. The court looked to the buyer’s allegations that the builder failed to construct the home in accordance with accepted construction and industry standards and that the builder was negligent in designing and constructing the home. The builder admitted that it was obligated to pay for the costs of repairs, but denied that it was negligent in constructing the home.
Read the court decisionRead the full story...Reprinted courtesy of
Craig Martin, Lamson, Dugan and Murray, LLPMr. Martin may be contacted at
cmartin@ldmlaw.com