After $15 Million Settlement, Association Gets $7.7 Million From Additional Subcontractor
November 07, 2012 —
CDJ STAFFThe stucco subcontractor for a condominium complex did not join in with the other defendants in a settlement of more than $15 million, preferring to take the case to a jury trial. That jury has found the stucco installer liable for $7.7 million to make repairs. Mark Wiechnik of Herrick Feinstein LLP wrote about the case on the Lexology web site. Mr. Wiechnik notes that the jury was shown “samples of rotted wood taken from the property as well as numerous pictures of damage resulting from the various defects.”
Read the court decisionRead the full story...Reprinted courtesy of
Engineer Proposes Slashing Scope of Millennium Tower Pile Upgrade
January 03, 2022 —
Nadine M. Post - Engineering News-RecordBased on further structural analysis and the success of a pilot program that installed three permanent piles using modified procedures, the structural engineer-of-record for the delayed perimeter pile upgrade of the 645-ft-tall Millennium Tower in San Francisco has proposed a significantly reduced scope for the project that he says would still arrest settlement and allow the slow recovery of some of the condominium building’s tilt.
Reprinted courtesy of
Nadine M. Post, Engineering News-Record
Ms. Post may be contacted at postn@enr.com
Read the full story... Read the court decisionRead the full story...Reprinted courtesy of
Unfair Risk Allocation on Design-Build Projects
June 13, 2022 —
Brian Perlberg, Executive Director of ConsensusDocs Coalition & AGC Senior CounselThe AGC annual convention included a session entitled “Who’s on the Hook for Design Defects in Design-Build Projects.”
Fox Rothschild’s Dirk Haire, Les Synder of Infrastructure Construction Brightline West, and David Hecker of Kiewit presented. Attendees crowded into a standing-only room because more and more builders are facing design liability, especially design-builders on large infrastructure projects. The presentation highlighted how some owners abuse the submittal process on design-build jobs to make changes without compensating the builder with more time, money, or both. One project took a sample of owner comments and extrapolated that just one project generated over 15,000 submittals and generated over 110,000 comments of “concern” or “preference.”
Certain owner-representatives and attorneys for owners have oversold the risk allocation transfer aspect of design-build. The Spearin Doctrine protects a builder from design documents containing errors by entitling them to receive equitable compensation. The design-build project delivery method erodes potential Spearin protections. Ways that an owner may retain some design responsibility and bring Spearin protections back into play for a builder include the following:
- Accuracy of reports prepared by owner’s outside consultants
- Owner’s design approval process
- Viability of owner’s stated design and project criteria
Read the court decisionRead the full story...Reprinted courtesy of
Brian Perlberg, ConsensusDocs
“Over? Did you say ‘over’?”
December 31, 2024 —
Daniel Lund III - LexologyThe United States Seventh Circuit Court of Appeals recently held that under the Federal Arbitration Act, an arbitrator – and not a court – is to determine the preclusive effect of an arbitrator’s earlier ruling.
In the case, insurers engaged in three reinsurance agreements had previously arbitrated concerning one of the insurer’s billing methodologies. When a similar dispute occurred years later, the victors in the first arbitration – rather than pursuing arbitration – filed in federal court in Chicago seeking to have the court declare that the prior arbitration award precluded re-arbitration of the latest dispute. The insurer on the other side of the dispute moved to compel arbitration, a motion granted by the district court. The plaintiff insurers appealed.
Read the court decisionRead the full story...Reprinted courtesy of
Daniel Lund III, PhelpsMr. Lund may be contacted at
daniel.lund@phelps.com
Show Me the Money: The Good Faith Dispute Exception to Prompt Payment Penalties
March 13, 2023 —
Garret Murai - California Construction Law BlogCalifornia has a number of
prompt payment penalty statutes on the books. Among them is Civil Code section 8800 which requires project owners on private works projects to pay progress payments to direct contractors within 30 days after demand for payment pursuant to contract or be subject to prompt payment penalties of two percent (2%) per month on the amount wrongfully withheld. Like California’s other prompt payment penalty statutes, however, there is an important carve out: If there is a good faith dispute between the project owner and the direct contractor the project owner may withhold up to 150% of the dispute amount and not be subject to prompt payment penalties. And that, my friends, is a higher-tiered party’s “get out of jail free” card.
In a case of first impression, the 1st District Court of Appeals, in
Vought Construction Inc. v. Stock (2022) 84 Cal.App.5th 622, examined whether a project owner’s claim for liquidated damages constitutes a good faith dispute under Civil Code section 8800.
Read the court decisionRead the full story...Reprinted courtesy of
Garret Murai, Nomos LLPMr. Murai may be contacted at
gmurai@nomosllp.com
Business Risk Exclusions Bar Coverage for Construction Defect Claims
June 28, 2013 —
Tred EyerlyThe federal district court assumed there was "property damage" caused by an "occurrence," but found the business risk exclusions barred coverage for construction defect claims. Hubbell v. Carney Bros. Constr., 2013 U.S. Dist. LEXIS 68331 (D. Colo. May 13, 2013).
The plaintiffs entered a construction contract with the insured general contractor to build a home. After the project was one-third completed, plaintiffs terminated the contract. Experts hired by plaintiffs found a failure to properly site the residence, as the house was constructed 48 feet from the intended location; violations of county height restrictions; failure to follow building plans, which were themselves deficient; and an improperly poured foundation. The experts estimated that the costs of repairing the property to be between $1.3 and $1.5 million, and that the cost of demolishing the structure and rebuilding it would be between $1.1 and $1.3 million.
After plaintiff filed suit, a stipulated judgment of $1.952 million was entered.
Read the court decisionRead the full story...Reprinted courtesy of
Tred EyerlyTred Eyerly can be contacted at
te@hawaiilawyer.com
First Circuit Limits Insurers’ Right to Recoup Defense Costs or Settlement Payments
April 02, 2024 —
Eric Hermanson, Austin Moody & Victoria Ranieri - White and Williams LLPWeighing in on an issue that has divided courts nationwide, the U.S. Court of Appeals for the First Circuit has ruled that an insurer under Massachusetts law has no right to recoup defense costs, or amounts the insurer pays in settlement – even if the insurer reserves rights prior to payment and obtains a ruling, after the fact, that no defense or indemnity was owed. Berkley Natl. Ins. Co. v. Atlantic-Newport Realty LLC, No. 22-1959, 2024 U.S. App. LEXIS 4115 (1st Cir. Feb 22, 2024) (“Granite Telecomm"). However, the First Circuit rested its ruling on narrow procedural grounds, which may prolong the controversy rather than resolve it.
The insureds in Granite Telecomm owned a company cafeteria. They were sued by a food service worker who suffered a foot infection after being exposed to bacteria during a sewage backup. They sought coverage from their insurer, Berkley. Berkley argued that coverage was barred by a fungus and bacteria exclusion in the policy. The insureds disagreed. They threatened suit under M.G.L. ch. 93A, and demanded that Berkley defend the case.
Reprinted courtesy of
Eric Hermanson, White and Williams LLP,
Austin Moody, White and Williams LLP and
Victoria Ranieri, White and Williams LLP
Mr. Hermanson may be contacted at hermansone@whiteandwilliams.com
Mr. Moody may be contacted at moodya@whiteandwilliams.com
Ms. Ranieri may be contacted atranieriv@whiteandwilliams.com
Read the court decisionRead the full story...Reprinted courtesy of
Client Alert: Design Immunity Affirmative Defense Not Available to Public Entities Absent Evidence of Pre-Accident Discretionary Approval of the Plan or Design
April 15, 2014 —
R. Bryan Martin & Melinda M. Carrido – Haight Brown & Bonesteel LLPOn April 8, 2014, in Martinez v. County of Ventura, Case No. B24476, the Second Appellate District of the California Court of Appeal reversed the jury's defense verdict for the County of Ventura, holding that the County's evidence in support of its Design Immunity defense to a public property dangerous condition claim was insufficient as a matter of law.
Plaintiff filed suit against the County of Ventura (the "County") after sustaining paraplegic injuries when his motorcycle struck an asphalt berm abutting a raised drain (the top-hat drain system) on a road in the County. The drain system consisted of a heavy steel cover on three legs elevated eight to ten inches off the ground, with a sloped asphalt berm to channel water into the drain.
Plaintiff alleged that the top-hat drain system constituted a dangerous condition of public property pursuant to California Government Code section 835. Under this Section, a public entity is liable for "injury proximately caused by a dangerous condition of its property if the condition created a reasonably foreseeable risk of the kind of injury sustained, and the public entity had actual or constructive notice of the condition a sufficient time before the injury to have taken preventative measures." The jury found the top-hat drain system constituted a dangerous condition of public property.
Reprinted courtesy of
R. Bryan Martin, Haight Brown & Bonesteel LLP and
Melinda M. Carrido, Haight Brown & Bonesteel LLP
Mr. Martin may be contacted at bmartin@hbblaw.com; Ms. Carrido may be contacted at mcarrido@hbblaw.com
Read the court decisionRead the full story...Reprinted courtesy of