California MCLE Seminar at BHA Sacramento July 11th
June 11, 2014 —
Kimberly Albarq-CDJ STAFFThere are just three weeks remaining to sign up for Bert L. Howe & Associate’s next California MCLE seminar, UNDERSTANDING CONSTRUCTION DEFECT LITIGATION.
This activity will be presented on Friday, July 11th at noon, at BHA’s Sacramento office:
2520 Venture Oaks Way
Suite 435
Sacramento, CA 95833
There is no cost for attendance at this seminar and lunch will be provided.
This course has been approved for Minimum Continuing Legal Education credit by the State Bar of California Committee on MCLE in the amount of 1.0 credit hours, of which 0.0 credit hours will apply to legal ethics/professional responsibility credit. The seminar will be presented by Don MacGregor, general contractor and project manager.
Water intrusion through doors, windows and roofing systems, as well as soil and foundation-related movement, and the resultant damage associated therewith, are the triggering effects for the vast majority of homeowner complaints today and serve as the basis for most residential construction defect litigation. The graphic and animation-supported workshop/lecture activity will focus on the residential construction process from site preparation through occupancy, an examination of associated damages most often encountered when investigating construction defect claims, and the inter-relationships between the developer, general contractor, sub trades and design professionals. Typical plaintiff homeowner/HOA expert allegations will be examined in connection with those building components most frequently associated with construction defect and claims litigation.
The workshop will examine:
* Typical construction materials, and terminology associated with residential construction
* The installation process and sequencing of major construction elements, including interrelationship with other building assemblies
* The parties (subcontractors) typically associated with major construction assemblies and components
* An analysis of exposure/allocation to responsible parties.
Attendance at THE UNDERSTANDING CONSTRUCTION DEFECT LITIGATION seminar will provide the attendee with:
* A greater understanding of the terms and conditions encountered when dealing with common construction defect issues
* A greater understanding of contractual scopes of work encountered when reviewing construction contract documents
* The ability to identify, both quickly and accurately, potentially responsible parties
* An understanding of damages most often associated with construction defects, as well as a greater ability to identify conditions triggering coverage
To register for the event, please email Don MacGregor at dmac@berthowe.com. If you have any questions, please feel free to contact Don at (800) 482-1822 (office) or (714) 713-4956 (cell).
Read the court decisionRead the full story...Reprinted courtesy of
U.S. Codes for Deck Attachment
July 16, 2014 —
Beverley BevenFlorez-CDJ STAFFTed Cushman in Big Builder explained how “decks often collapse when the ledger attachment to the main house fails.” Now, codes require “positive attachment…a solid connection with closely spaced lag screws (or better yet, bolts)." Cushman demonstrated this pictorially in a detail. He also stated to make sure to fasten securely, remove siding, and install flashing.
Read the court decisionRead the full story...Reprinted courtesy of
U.S. Homeownership Rate Falls to Lowest Since Early 1995
October 29, 2014 —
Prashant Gopal – BloombergThe homeownership rate in the U.S. fell to the lowest in more than 19 years as the market shifted toward renting and tight credit blocked some potential buyers.
The share of Americans who own their homes was 64.4 percent in the third quarter, down from 64.7 percent in the previous three months, the Census Bureau said in a report today. The rate was at the lowest level since the first quarter of 1995.
Entry-level buyers have been held back by stringent mortgage standards and slow wage growth. The share of first-time buyers was 29 percent in September for the third straight month, compared with about 40 percent historically, according to the National Association of Realtors said.
Read the court decisionRead the full story...Reprinted courtesy of
Prashant Gopal, BloombergMr. Gopal may be contacted at
pgopal2@bloomberg.net
How Construction Contracts are Made. Hint: It’s a Bit Like Making Sausage
October 07, 2016 —
Garret Murai – California Construction Law BlogConstruction can be a messy affair. In a sense, that’s to be expected when you’re building a complex structure, involving the coordination of several parties and numerous persons, in the natural environment and in the elements, subject to an increasing array of laws, regulations, ordinances and codes, and often at the cost of hundreds if not billions of dollars.
So too can construction contracts.
There’s the plans, the specifications, the general conditions, the special conditions, the addenda, the prime contract, the subcontracts, the purchase orders, and the change orders, to name just a few of the documents which bind parties, which should ideally be consistent and complimentary with one another, when the reality is that the parties bound to those contracts often have very different interests.
Perhaps the analogy goes a little too far afield, but it makes the point, that it can sometimes be a bit like making sausage.
The next case,
Watson Bowman Acme Corporation v. RGW Construction, Inc., California Court of Appeals for the Fifth District, Case No. F070067 (August 9, 2016), highlights the problems which can arise from the numerous documents which make up the typical construction contract today and the lengths that juries and judges must go to interpret what those agreements mean.
Read the court decisionRead the full story...Reprinted courtesy of
Garret Murai, Wendel, Rosen, Black & Dean LLPMr. Murai may be contacted at
gmurai@wendel.com
Drastic Rebuild Resurrects Graves' Landmark Portland Building
September 14, 2020 —
Nadine M. Post - Engineering News-RecordFifteen minutes into a 105-minute job interview for the $195-million overhaul of the long-troubled Portland Public Service Building in Oregon’s largest city, owner’s rep Mike Day threw a curve ball to the unwitting design-build team of Howard S. Wright Construction Co. and architect DLR Group. Already hard at work solving Day’s first faux crisis scenario—a budget buster that threatened the viability of the makeover of the notoriously dysfunctional landmark—they had to regroup.
Reprinted courtesy of
Nadine M. Post, Engineering News-Record
Ms. Post may be contacted at postn@enr.com
Read the full story... Read the court decisionRead the full story...Reprinted courtesy of
15 Wilke Fleury Lawyers Recognized in 2020 Northern California Super Lawyers and Rising Stars Lists
August 17, 2020 —
Wilke Fleury LLPWilke Fleury is proud to announce that 15 of our astounding attorneys were featured in the Annual List of Top Attorneys in the 2020 Northern California Super Lawyers magazine.
Super Lawyers rates attorneys in each state using a patented selection process; they also publish a yearly magazine issue that regularly produces award-winning features on selected attorneys.
Wilke Fleury LLP
Read the full story... Read the court decisionRead the full story...Reprinted courtesy of
New York Appellate Court Addresses “Trigger of Coverage” for Asbestos Claims and Other Coverage Issues
November 30, 2020 —
Paul A. Briganti - Complex Insurance Coverage ReporterOn October 9, 2020, the New York Supreme Court, Appellate Division, Fourth Department, decided an appeal from a trial court’s 2018 summary judgment ruling on a number of coverage issues arising out of asbestos-related bodily injury claims against plaintiffs Carrier Corporation (Carrier) and Elliott Company (Elliott). See Carrier Corp. v. Allstate Ins. Co., No. 396 CA 18-02292, Mem. & Order (N.Y. Sup. Ct. App. Div. 4th Dep’t Oct. 9, 2020).
The Fourth Department reversed the trial court’s ruling that, under New York’s “injury in fact trigger of coverage,” injury occurs from the first date of exposure to asbestos through death or the filing of suit as a matter of law. The parties agreed that, because the policy language at issue required personal injury to take place “during the policy period,” “the applicable test in determining what event constitutes personal injury sufficient to trigger coverage is injury-in-fact, ‘which rests on when the injury, sickness, disease or disability actually began.’” Id. at 3 (quoting Cont’l Cas. Co. v. Rapid-American Corp., 609 N.E.2d 506, 511 (N.Y. 1993)). The Fourth Department concluded that, in resolving the issue, the trial court erred by relying on inapposite decisions in other cases where: (1) the parties had stipulated or otherwise not disputed that first exposure triggered coverage[1]; or (2) the issue had not been resolved on summary judgment, but rather at trial based on expert medical evidence[2]. The Fourth Department further explained that, even if plaintiffs here had met their initial burden on summary judgment by submitting admissible evidence that asbestos-related injury actually begins upon first exposure, the defendant-insurer’s opposition – which included affidavits of medical experts contradicting that evidence and averring instead that “harm occurs only when a threshold level of asbestos fiber or particle burden is reached that overtakes the body’s defense mechanisms” – raised a triable issue of fact. Id. at 4. The Fourth Department also rejected plaintiffs’ argument that the defendant-insurer was collaterally estopped on the “trigger” issue by a California appellate court’s decision in Armstrong World Industries, Inc. v. Aetna Casualty & Surety Co., 52 Cal. Rptr. 2d 690 (Cal. Ct. App. 1996). The Fourth Department reasoned that the issues litigated in the two cases were not identical because, among other things, California and New York “apply different substantive law in determining when asbestos-related injury occurs.” Carrier, Mem. & Order at 4.
Read the court decisionRead the full story...Reprinted courtesy of
Paul A. Briganti, White and Williams LLPMr. Briganti may be contacted at
brigantip@whiteandwilliams.com
Rio de Janeiro's Bursting Real-Estate Bubble
September 17, 2015 —
Juan Pablo Spinetto & Peter Millard – BloombergAt opposite ends of downtown Rio de Janeiro, projects tied to Donald Trump and Eike Batista-- one a billionaire-turned-politician, the other Brazil’s most famous ex-billionaire -- have come to represent the city’s real estate bust.
The 23-story Serrador building, a granite-and-glass art deco tower near Rio’s Santos Dumont airport, has sat empty since Batista’s failed empire of commodities companies abandoned it last year. Four miles away, in the city’s gritty port district, an ambitious office project that Trump lent his name to is still nothing more than a weed-filled lot about a year after construction was slated to begin.
Reprinted courtesy of
Juan Pablo Spinetto, Bloomberg and
Peter Millard, Bloomberg Read the court decisionRead the full story...Reprinted courtesy of