Subcontractors on Washington Public Projects can now get their Retainage Money Sooner
July 26, 2017 —
Brett M. Hill - Ahlers & Cressman PLLCSubcontractors on public projects in Washington State will no longer be required to wait until final acceptance of the project to get their retainage money. A new statute, which goes into effect on July 23, 2017 and applies only to Washington public projects, will allow subcontractors to get their retainage sooner.
Under prior law, a subcontractor could only get its retainage prior to final acceptance if the general contractor provided a retainage bond to the public owner to secure a release of the general contractor’s retainage and the subcontractor then provided a similar retainage bond to the general contractor in the amount of its own retainage. If the general contractor decided to not provide a retainage bond to the owner, the subcontractor would be forced to wait until final acceptance of the project before it could get paid its retainage.
Read the court decisionRead the full story...Reprinted courtesy of
Brett M. Hill, Ahlers & Cressman PLLCMr. Hill may be contacted at
bhill@ac-lawyers.com
Insured's Collapse Claim Survives Summary Judgment
October 28, 2024 —
Tred R. Eyerly - Insurance Law HawaiiThe insurer's motion for summary judgment seeking to dispose of the insured's claim for collapse was denied. Life Skills, Inc. v. Harleysville Ins. Co., 2024 U.S. Dist. LEXIS 143658 (D. Mass. Aug. 13, 2024).
Life Skills was a non-profit social service agency providing residential and day habilitation services to adults with autism and intellectual and developmental disabilities. The head office was covered by a policy issued by Harleysville with building coverage limits of $3,038,300.
Damage occurred in a ceramics classroom located in the basement of the building. The floor sank between eight to twelve inches in the northeast corner. The ceramics classroom contained two large kilns weighing approximately 200 pounds.
Read the court decisionRead the full story...Reprinted courtesy of
Tred R. Eyerly, Damon Key Leong Kupchak HastertMr. Eyerly may be contacted at
te@hawaiilawyer.com
Utility Contractor Held Responsible for Damaged Underground Electrical Line
October 11, 2017 —
Brett M. Hill - Ahlers & Cressman, PLLCThe Washington State Court of Appeals recently addressed an excavation contractor’s responsibilities under the Underground Utilities Damage Prevention Act (UUDPA), RCW 19.122. That statute was enacted in 2011 and imposed certain statutory duties on parties involved with projects requiring excavation.
In this case, Titan Earthworks, LLC contracted with the City of Federal Way to perform certain street improvements including installation of a new traffic signal. During the process of excavating for the traffic signal, Titan drilled into an energized underground Puget Sound Energy power line. PSE sought damages from Titan and Titan sued the City of Federal Way.
Read the court decisionRead the full story...Reprinted courtesy of
Brett M. Hill, Ahlers & Cressman, PLLCMr. Hill may be contacted at
bhill@ac-lawyers.com
Why A Jury Found That Contractor 'Retaliated' Against Undocumented Craft Worker
August 22, 2022 —
Richard Korman - Engineering News-RecordOn May 10, 2017, a Boston wall taper who had broken his leg in a fall from a ladder during work six weeks earlier took his two-year-old son to an office of a West Bridgewater, Mass.-based contractor, on the invitation of the CEO who asked him to come and gave the worker $500 to help him get by while recovering.
Reprinted courtesy of
Richard Korman, Engineering News-Record
Mr. Korman may be contacted at kormanr@enr.com
Read the full story... Read the court decisionRead the full story...Reprinted courtesy of
Legislatures Shouldn’t Try to Do the Courts’ Job
March 01, 2012 —
CDJ STAFFDavid Thamann, writing in Property Casualty 360, argues that current actions by legislatures on insurance coverage amount to “legislative interference or overreach.” He notes that under current Colorado law, “a court shall presume that the work of a construction professional that results in property damage — including damage to the work itself or other work — is an accident unless the property damage is intended and expected by the insured.” He argues that here legislators are stepping into the role of the courts. “Insureds and insurers are not always going to be pleased with a court ruling, but that is the system we have.”
Read the full story…
Read the court decisionRead the full story...Reprinted courtesy of
Open & Known Hazards Under the Kinsman Exception to Privette
February 15, 2018 —
Frances Ma & Lawrence S. Zucker II – Haight Brown & Bonesteel LLP Publications & InsightsGonzalez v. Mathis, 2018 WL 718528 confirms the difficulties a defendant will face when trying to overcome the Kinsman exception to the
Privette doctrine on a dispositive motion when dealing with an open and obvious hazard. There, a professional window washer fell off a roof while walking along a parapet wall constructed by the owner of a home.
The window washer filed suit against the homeowner and alleged three dangerous conditions on the roof: (1) the parapet wall forced those who needed to access a skylight to walk along an exposed two-foot ledge that lacked a safety railing; (2) dilapidated and slippery roof shingles; and (3) the lack of tie off points that would allow maintenance workers to secure themselves with ropes or harnesses. The homeowner filed a motion for summary judgment under
Privette v. Superior Court (1993) 5 Cal.4th 689 and its progeny which prohibits an independent contractor from suing his or her hirer for workplace injuries (
“Privette doctrine”).
There are two exceptions to the
Privette doctrine. First, a hirer cannot avoid liability when he or she exercises control over the manner and means in which a contractor does his or her work and that control contributes to the injuries sustained – known as the
“Hooker exception” (premised on the holding of
Hooker v. Department of Transportation (2002) 27 Cal.4th 198). Second, a hirer may be found liable if he or she fails to warn the contractor of a concealed hazard on the premises – known as the
“Kinsman exception” (premised on the holding of
Kinsman v. Unocal Corp. (2005)).
Reprinted courtesy of
Frances Ma, Haight Brown & Bonesteel LLP and
Lawrence S. Zucker II, Haight Brown & Bonesteel LLP
Ms. Ma may be contacted at fma@hbblaw.com
Mr. Zucker may be contacted at lzucker@hbblaw.com
Read the court decisionRead the full story...Reprinted courtesy of
Jury Trials: A COVID Update
July 18, 2022 —
Joshua Lane - Ahlers Cressman & Sleight PLLCJURY TRIALS. Budd v. Kaiser Gypsum Co., Inc., — Wn. App. 2d –, 505 P.3d 120 (Wash. Ct. App. 2022). (1) Courts must ensure that juries are randomly selected to provide a fair and impartial jury. (2) While the Sixth and Fourteenth Amendments prohibit the systematic exclusion of distinctive groups from jury pools, Washington Courts’ COVID-19 policy to excuse people who were ages 60 and older and did not wish to report for duty was not a “systematic” exclusion.
Raymond Budd developed mesothelioma after working with a drywall product called “joint compound” from 1962 to 1972. He sued Kaiser Gypsum Company, Inc. and others for damages, contending that the company’s joint compound caused his illness. A jury returned a verdict in Budd’s favor and awarded him nearly $13.5 million. Kaiser appeals, claiming (1) insufficient randomness in the jury-selection process, (2) erroneous transcription of expert testimony, (3) lack of proximate causation, (4) lack of medical causation, (5) an improper jury instruction on defective design, (6) improper exclusion of sexual battery and marital discord evidence, (7) improper admission of post-exposure evidence, (8) improper exclusion of regulatory provisions, and (9) a failure to link its product to Budd’s disease. The Court of Appeals, Division 1, affirmed the verdict in favor of Budd.
Read the court decisionRead the full story...Reprinted courtesy of
Joshua Lane, Ahlers Cressman & Sleight PLLCMr. Lane may be contacted at
joshua.lane@acslawyers.com
Insured’s Bad Faith Insurance Claim Evaporates Before its Eyes
August 03, 2020 —
Garret Murai - California Construction Law BlogSometimes it’s right there before your eyes. Then, poof, it’s gone. This was the experience of one insured, who brought a bad faith insurance denial claim against his insurer thinking that the facts were in his favor, only to discover they were not.
The 501 E .51st Street Case
The Water Main Break and AGI’s Report
The owner of a 10-unit apartment building built in 1963, 501 East 51st Street, Long Beach-10 LLC (just rolls off the tongue doesn’t it?), filed a bad faith action against its insurer Kookmin Best Insurance Co., Ltd., after it denied 501 East’s insurance tender following a water main break that caused the building’s foundation to subside.
The water main break occurred sometimes between December 31, 2015 and January 2, 2016 next to the southwest side of the building. 501 East tendered its insurance claim to Kookmin on March 8, 2016, and in April 2016, presented a report prepared by American Geotechnical, Inc. (“AGI”) concerning damage to the building. According to the report prepared by AGI, AGI conducted a “limited geotechnical investigation” to “evaluate site conditions relating to the reported building distress following a waterline breach near the south end of the building.” The scope of AGI’s investigation was limited to “observation, photo documentation of the site conditions, [and[ floor-level survey of the interior of the first level units.” AGI’s investigation did not involve any subsurface investigation or soil testing.
Read the court decisionRead the full story...Reprinted courtesy of
Garret Murai, Nomos LLPMr. Murai may be contacted at