No Duty to Defend Faulty Workmanship Under Hawaii Law, but All is not Lost for Insured Contractor
June 06, 2022 —
Tred R. Eyerly - Insurance Law HawaiiThe federal district court found no duty to defend claims of faulty workmanship under certain policies issued to the insured contractor, but rejected arguments made by the Insurers regarding various provisions of the general liability and excess policies. St. Paul Fire & Marine Ins. Co. v. Bodell Consr. Co., 2022 U.S. Dist. LEXZIS 79379 (D. Haw. May 2, 2022). (Note- our office represents the insured contractor).
In 2003, Bodell was hired by developer Sunstone Realty Partners L LLC to be the general contractor for construction work on a condominium project, "Ali`i Cove." The project consisted of approximately 37 buildings and one recreation center that were constructed over the course of four years. On August 14, 2015, the AOAO of Ali`i Cove sued Sunstone, alleging that Sunstone developed, built, and sold condominium nits using embedded straps that did not meet building codes, instead of bolting house frames to their foundations. The AOAO filed a second amended complaint alleging numerous additional defects which were referenced in an expert report. These included additional alleged construction defects such as site conditions, structural issues, building envelope, roofing, general architecture, mechanical, plumbing and electrical. In all, the report purported to find approximately 281 instances of faulty workmanship.
Read the court decisionRead the full story...Reprinted courtesy of
Tred R. Eyerly, Damon Key Leong Kupchak HastertMr. Eyerly may be contacted at
te@hawaiilawyer.com
Insurer's Attempt to Limit Additional Insured Status Fails
December 01, 2017 —
Tred R. Eyerly - Insurance Law HawaiiThe court disagreed with the insurer's attempt to limit additional insured status based upon the contract between the parties. Mays v. In re All C-Dive LLC, 2017 U.S. Dist. LEXIS 185874 (E.D. La. Nov. 9, 2017).
Five employees of C-Dive LLC filed a lawsuit after belng injured in a pipeline explosion aboard a vessel servicing a pipeline owned by Gulf South Pipeline Company. During the work, there was a release of gas that caused an explosion and injured the employees.
Read the court decisionRead the full story...Reprinted courtesy of
Tred R. Eyerly, Insurance Law HawaiiMr. Eyerly may be contacted at
te@hawaiilawyer.com
Contractor Liable for Soils Settlement in Construction Defect Suit
February 10, 2012 —
CDJ STAFFThe California Court of Appeals ruled on January 9 in Burrow v. JTL Dev. Corp., a construction defect case in which houses suffered damage due to improperly compacted soil, upholding the decision of the lower court.
Turf Construction entered into a deal with JTL to develop a parcel they acquired. A third firm, Griffin Homes, withdrew from the agreement “when a geotechnical and soils engineering firm reported significant problems with soil stability on 14 of the lots.” Turf Construction then took over compacting and grading the lots. Turf “had never compacted or graded a residential tract before.” Robert Taylor, the owner of Turf, “testified he knew there was a significant problem with unstable soils.”
After homes were built, the plaintiffs bought homes on the site. Shortly thereafter, the homes suffered damage from soil settlement “and the damage progressively worsened.” They separately filed complaints which the court consolidated.
During trial, the plaintiff’s expert said that there had been an inch and a half in both homes and three to five inches in the backyard and pool areas. “He also testified that there would be four to eight inches of future settlement in the next fifteen to twenty years.” The expert for Turf and JTL “testified that soil consolidation was complete and there would be no further settlement.”
Turf and JTL objected to projections made by the plaintiffs’ soil expert, William LaChappelle. Further, they called into question whether it was permissible for him to rely on work by a non-testifying expert, Mark Russell. The court upheld this noting that LaChappelle “said that they arrived at the opinion together, through a cycle of ‘back and forth’ and peer review, and that the opinion that the soil would settle four to eight inches in fifteen to twenty years was his own.”
Turf and JTL contended that the court relied on speculative damage. The appeals court disagreed, stating that the lower court based its award “on evidence of reasonably certain damage.”
Turf also that it was not strictly liable, since it did not own or sell the properties. The court wrote that they “disagree because Turf’s grading activities rendered it strictly liable as a manufacturer of the lots.” The court concluded that “Turf is strictly liable as a manufacturer of the lots.”
Judge Coffee upheld the decision of the lower court with Judges Yegan and Perren concurring.
Read the court’s decision…
Read the court decisionRead the full story...Reprinted courtesy of
Wisconsin Court of Appeals Holds Economic Loss Doctrine Applies to Damage to Other Property If It Was a Foreseeable Result of Disappointed Contractual Expectations
January 15, 2019 —
Gus Sara - The Subrogation StrategistIn Kmart Corp. v. Herzog Roofing, Inc., 2018 Wisc. App. Lexis 842, the Court of Appeals of Wisconsin considered whether the economic loss doctrine barred the plaintiff’s negligence claims against the defendant roofer for damages resulting from the collapse of a roof. The Court of Appeals held that, while some of the plaintiff’s property damages were unrelated to the scope of the contract, the economic loss doctrine still applied to those damages because they were a foreseeable result of the defendant’s breach of the contract. This case establishes that in Wisconsin, the economic loss doctrine bars tort claims for damage to property unrelated to the contract if those damages were a reasonably foreseeable risk of disappointed expectations of the contract.
Read the court decisionRead the full story...Reprinted courtesy of
Gus Sara, White and Williams LLPMr. Sara may be contacted at
sarag@whiteandwilliams.com
THE CALIFORNIA SUPREME COURT HAS RULED THAT THE RIGHT TO REPAIR ACT (SB800) IS THE EXCLUSIVE REMEDY FOR CONSTRUCTION DEFECT CLAIMS NOT INVOLVING PERSONAL INJURIES WHETHER OR NOT THE UNDERLYING DEFECTS GAVE RISE TO ANY PROPERTY DAMAGE in McMillin Albany LL
January 24, 2018 —
Chapman, Glucksman, Dean, Roeb, & BargerRICHARD H. GLUCKSMAN, ESQ.
GLENN T. BARGER, ESQ.
JON A. TURIGLIATTO, ESQ.
DAVID A. NAPPER, ESQ.
The Construction Industry finally has its answer. The California Supreme Court ruled that the Right to Repair Act (SB800) is the exclusive remedy for construction defect claims alleged to have resulted from economic loss, property damage, or both. Our office has closely tracked the matter since its infancy. The California Supreme Court’s holding resolves the split of authority presented by the Fifth Appellate District’s holding in
McMillin Albany LLC v. Superior Court (2015) 239 Cal.App.4th 1132, which outright rejected the Fourth Appellate District’s holding in
Liberty Mutual Insurance Co. v. Brookfield Crystal Cove LLC (2013) 219 Cal.App.4th 98.
By way of background, the Fourth District Court of Appeal held in
Liberty Mutual that compliance with SB800’s pre-litigation procedures prior to initiating litigation is only required for defect claims involving violations of SB800’s building standards that have not yet resulted in actual property damage. Where damage has occurred, a homeowner may initiate litigation under common law causes of action without first complying with the pre-litigation procedures set forth in SB800. Two years later, the Fifth District Court of Appeal, in
McMillin Albany, held that the California Legislature intended that all claims arising out of defects in new residential construction sold on or after January 1, 2003 are subject to the standards and requirements of the Right to Repair Act, including specifically the requirement that notice be provided to the builder prior to filing a lawsuit. Thus, the Court of Appeal ruled that SB800 is the exclusive remedy for all defect claims arising out of new residential construction sold on or after January 1, 2003.
After extensive examination of the text and legislative history of the Right to Repair Act, the Supreme Court affirmed the Fifth District Court of Appeal’s ruling that SB800 preempts common law claims for property damage. The Complaint at issue alleged construction defects causing both property damage and economic loss. After filing the operative Complaint, the homeowners dismissed the SB800 cause of action and took the position that the Right to Repair Act was adopted to provide a remedy for construction defects causing only economic loss and therefore SB800 did not alter preexisting common law remedies in cases where actual property damage or personal injuries resulted. The builder maintained that SB800 and its pre-litigation procedures still applied in this case where actually property damages were alleged to have occurred.
The Supreme Court found that the text and legislative history reflect a clear and unequivocal intent to supplant common law negligence and strict product liability actions with a statutory claim under the Right to Repair Act. Specifically the text reveals “…an intent to create not merely
a remedy for construction defects but
the remedy.” Additionally certain clauses set forth in SB800 “…evinces a clear intent to displace, in whole or in part, existing remedies for construction defects.” Not surprisingly, the Court confirmed that personal injury damages are expressly not recoverable under SB800, which actually assisted the Court in analyzing the intent of the statutory scheme. The Right to Repair Act provides that construction defect claims not involving personal injury will be treated the same procedurally going forward whether or not the underlying defects gave rise to any property damage.
The Supreme Court further found that the legislative history of SB800 confirms that displacement of parts of the existing remedial scheme was “…no accident, but rather a considered choice to reform construction defect litigation.” Further emphasizing how the legislative history confirms what the statutory text reflects, the Supreme Court offered the following summary: “the Act was designed as a broad reform package that would substantially change existing law by displacing some common law claims and substituting in their stead a statutory cause of action with a mandatory pre-litigation process.” As a result, the Supreme Court ordered that the builder is entitled to a stay and the homeowners are required to comply with the pre-litigation procedures set forth in the Right to Repair Act before their lawsuit may proceed.
The seminal ruling by the California Supreme Court shows great deference to California Legislature and the “major stakeholders on all sides of construction defect litigation” who participated in developing SB800. A significant win for builders across the Golden State, homeowners unequivocally must proceed via SB800 for all construction defect claims arising out of new residential construction sold on or after January 1, 2003. We invite you to contact us should you have any questions.
Reprinted courtesy of Chapman Glucksman Dean Roeb & Barger attorneys
Richard Glucksman,
Glenn Barger,
Jon Turigliatto and
David Napper
Mr. Glucksman may be contacted at rglucksman@cgdrblaw.com
Mr. Barger may be contacted at gbarger@cgdrblaw.com
Mr. Turgliatto may be contacted at jturigliatto@cgdrblaw.com
Mr. Napper may be contacted at dnapper@cgdrblaw.com
Read the court decisionRead the full story...Reprinted courtesy of
Poor Pleading Leads to Loss of Claim for Trespass Due to Relation-Back Doctrine, Statute of Limitations
April 13, 2017 —
Brett G. Moore & Lawrence S. Zucker II - Haight Brown & Bonesteel LLPIn Scholes v. Lambirth Trucking Co. (No. C070770, Filed 4/6/2017), the California Court of Appeal for the Third Appellate District held that the relation-back doctrine could not save a property owner’s trespass claim against an adjacent neighbor where the property owner’s original complaint was factually devoid and was later amended to include the trespass claim after the statute of limitations had run.
The relation-back doctrine is a well-settled legal principle which allows a plaintiff to amend a complaint to add a cause of action which would otherwise be barred by the statute of limitations. As long as the factual allegations “relate back” to the those alleged in the original complaint, an additional cause of action will not be subject to the applicable statute of limitations. The policy behind statutes of limitation is to put a defendant on notice of the need to defend against a claim in time to prepare an adequate defense.
On May 21, 2007, a fire broke out at defendant Lambirth Trucking Company’s (“Lambirth”) soil enhancement facility adjacent to plaintiff Vincent Scholes’ (“Scholes”) property. Scholes had previously notified Lambirth that wood chips and rice hulls were accumulating on his property as a result of Lambirth’s operations. Local authorities also warned Lambirth of the hazards presented by storage of those materials.
Reprinted courtesy of
Brett G. Moore, Haight Brown & Bonesteel LLP and
Lawrence S. Zucker II, Haight Brown & Bonesteel LLP
Mr. Moore may be contacted at bmoore@hbblaw.com
Mr. Zucker may be contacted at lzucker@hbblaw.com
Read the court decisionRead the full story...Reprinted courtesy of
Approaches to Managing Job Site Inventory
January 04, 2018 —
Jessica Stark - Construction InformerOriginally Published by CDJ on August 30, 2017
There is no question that organization on the job site can mean the difference between efficient performance and costly errors. A simple mistake can cost a company thousands, which is why details are carefully articulated and supervisors become better scrutinizers than magazine editors. But for some reason, many companies don’t consider managing job site inventory under this same attentive category, or perhaps they don’t know about the technology available to help them do it.
For contractors, keeping track of every piece of material and equipment lowers losses and keeps crews busy. This is especially true for contractors in the trades who often have specialized equipment in inventory such as power supplies, HVAC “smart energy” components or inspection equipment. Once everything is accounted for, the possibility of loss is decreased and there’s a chance to evaluate the use of all materials and equipment. This can show the efficiency of allotted resources. Is there enough equipment on the site to get tasks completed? Is there a need for more? Less? Having excess equipment can sometimes prepare a crew for problem scenarios. But it can also mean the construction company is overpaying for unneeded resources. However, the only way to know is by effectively managing job site inventory. That includes all equipment and materials
Read the court decisionRead the full story...Reprinted courtesy of
Jessica Stark, Construction Informer
AB 1701 – General Contractor Liability for Subcontractors’ Unpaid Wages
November 08, 2017 —
Alex Baghdassarian, Eric M. Gruzen, and Kerri Sakaue - Peckar & Abramson, P.C.Contractors will soon find themselves on the frontline of wage disputes on projects if laborers working on behalf of their subcontractors or vendors are unpaid. On October 14, 2017, Governor Jerry Brown signed into law AB 1701, which will allow laborers to seek direct compensation from the general contractors on private projects, if their wages remain unpaid.
The legislative mandate requires direct contractors—defined as contractors who have a direct contractual relationship with an owner—to assume liability for any debt incurred by a subcontractor, at any tier, for a wage claimant’s performance of labor included in the subject of the original contract between the general contractor and the owner. The California bill will apply to all private construction contracts entered into on or after January 1, 2018. Previously, all laborers could maintain a mechanic’s lien claim against private property, without needing to serve a 20-day preliminary notice, but there was no statutory obligation on the “direct contractors” to reimburse the laborers their unpaid wages.
Reprinted courtesy of Peckar & Abramson, P.C. attorneys
Alex Baghdassarian,
Eric M. Gruzen and
Kerri Sakaue
Mr. Baghdassarian may be contacted at abaghdassarian@pecklaw.com
Mr. Gruzen may be contacted at egruzen@pecklaw.com
Ms. Sakaue may be contacted at ksakaue@pecklaw.com
Read the court decisionRead the full story...Reprinted courtesy of