Dispute between City and Construction Company Over Unsightly Arches
April 01, 2014 —
Beverley BevenFlorez-CDJ STAFFThe city of Swartz Creek, Michigan alleged that Slagter Construction’s work on “Texas-style arches along a new bridge” was “terrible” and doesn’t “match up to what the company promised when it took the job to build the $20,000 walkways that include the arches,” reported M Live.
However, Slagter Construction “maintains its repairs were adequate and claims in a letter to the state that the issue shouldn't resolved by local officials who have ‘no formal training or education on these matters.’”
According to M Live, “[t]he two sides are set to meet on May 5 with MDOT officials on May 5 in Bay City for arbitration.”
Read the court decisionRead the full story...Reprinted courtesy of
Prevent Costly Curb Box Damage Due on New Construction Projects
May 11, 2020 —
Bob Welker - Construction ExecutiveFor new construction projects in areas with acidic soils, keeping curb boxes in good working order is critical to avoid compromised water service, angry customers, and costly repair and replacement.
Traditionally, a curb box is composed of a metal tube that connects the cast iron base to a cast iron lid/cap. It is necessary for water line repairs and shut off in case of flooding. Typically, they are buried six to eight feet below ground, beneath the frost line. Curb boxes are found on every water line that connects a building to a city water main.
One major challenge is that many areas across the United States—including the East Coast, South, upper Midwest and Pacific Northwest—have acidic soil that rapidly corrodes cast iron infrastructure, including curb boxes. Soil with a pH of six or less is considered acidic.
Reprinted courtesy of
Bob Welker, Construction Executive, a publication of Associated Builders and Contractors. All rights reserved.
Read the court decisionRead the full story...Reprinted courtesy of
Texas Court of Appeals Conditionally Grant Petition for Writ of Mandamus to Anderson
April 25, 2011 —
Beverley BevenFlorez CDJ STAFFThe Texas Court of Appeals conditionally grant mandamus relief to Anderson Construction Company and Ronnie Anderson (collectively “Anderson”)… from the trial court in a construction defect lawsuit filed by Brent L. Mainwaring and Tatayana Mainwaring. See Tex. Prop. Code Ann. 27.001-.007 (West 2000 & Supp. 2010). Relators contend the trial court abused its discretion by compelling discovery while the case was abated by operation of law.
The Court of Appeals opinion describes what led up to the proceedings: “The Mainwarings’ original petition identified certain defects in their Anderson-constructed home. Those defects concerned the roof trusses and framing, air conditioning, mortar and masonry, exterior doors and windows, and weep holes. With respect to the five areas of defects identified in their original petition, the Mainwarings gave Anderson the statutorily required notice on January 13, 2010. After implementing agreed extensions, Anderson made an offer of settlement for the defects the Mainwarings identified in their notice. Almost eight months later, the Mainwarings filed an amended petition adding defects they had not included in their original petition and notice. The additional defects the Mainwarings included in their amended petition had not been addressed by Anderson’s offer of settlement.”
Following these events, Anderson claimed the Mainwarings did not respond in writing to their settlement offer. “Anderson filed a verified plea in abatement on December 2, 2010. In the trial court, Anderson claimed that the Mainwarings failed to respond in writing to Anderson’s settlement offer, as required by Section 27.004(b) of the RCLA. See Tex. Prop. Code Ann. 27.004(b)(1). The Mainwarings moved to compel discovery responses from Anderson. The Mainwarings alleged that they rejected Anderson’s settlement offer, and that if their response was insufficient, they contend that Anderson’s offer was rejected by operation of law on the twenty-fifth day after the Mainwarings received it. See Tex. Prop. Code Ann. 27.004(i). The Mainwarings’ motion to compel was not supported by affidavit. See Tex. Prop. Code Ann. 27.004(d)(2). On January 13, 2011, Anderson filed a verified supplemental plea in abatement. Anderson alleged that the Mainwarings failed to provide written notice concerning the newly alleged defects and complained the Mainwarings were attempting to circumvent the inspection and resolution procedure of the RCLA. Over Anderson’s objection that the lawsuit had been abated, the trial court granted the Mainwarings’ motion to compel discovery.”
After listening to both sides, the Court of Appeals offered this reasoning for their opinion: “The parties do not dispute that Anderson inspected the property before the Mainwarings alleged the existence of additional defects in their amended pleading, nor do the Mainwarings claim that Anderson has been given an opportunity to inspect the additional defects the Mainwarings identified in their amended pleadings. We conclude the trial court did not have the discretion to deny or lift the abatement until the Mainwarings established their compliance with the statute. In other words, the Mainwarings are required to provide Anderson a reasonable opportunity to inspect the additional defects identified by their amended pleading, which will allow Anderson the opportunity to cure or settle with respect to the newly identified defects.”
The Court of Appeals spoke directly on the issue of mandamus relief: “The Mainwarings contend that mandamus relief is not available because the trial court’s ruling does not prevent Anderson from making settlement offers during the discovery process. ‘An appellate remedy is “adequate” when any benefits to mandamus review are outweighed by the detriments.’ In re Prudential Ins. Co. of Am., 148 S.W.3d 124, 136 (Tex. 2004). The failure to abate a case is typically not subject to mandamus. See In re Allstate Cnty. Mut. Ins. Co., 85 S.W.3d 193, 196 (Tex. 2002) (citing Abor v. Black, 695 S.W.2d 564, 567 (Tex. 1985)). In this case, however, the case was abated by operation of law. By ignoring the statutory abatement, the trial court interfered with the statutory procedure for developing and resolving construction defect claims. See In re Kimball Hill Homes Tex., Inc., 969 S.W.2d 522, 525 (Tex. App. Houston [14th Dist.] 1998, orig. proceeding) (An appeal provides an inadequate remedy for the trial court’s failure to observe automatic abatement pursuant to the RCLA.). The benefits of mandamus review are not outweighed by the detriments of mandamus review in this case.“
In conclusion, “The trial court had no discretion to compel discovery while the case was abated, and Anderson, who has been compelled to respond to discovery during a period the case was under an automatic abatement, has no adequate remedy on appeal. Accordingly, we conditionally grant the petition for writ of mandamus. The writ will issue only if the trial court fails to vacate its order of February 3, 2011, and fails to refrain from proceeding with the case until a motion to reinstate is filed that establishes compliance with the notice and inspection requirements of the Residential Construction Liability Act.”
Read the trial court’s decision…
Read the court decisionRead the full story...Reprinted courtesy of
Muir named Brown and Caldwell Eastern leader
January 09, 2023 —
Brown and CaldwellHARTFORD, Conn., Jan. 04, 2023 — Leading environmental engineering and construction services firm Brown and Caldwell today announces Senior Vice President Eric Muir has been promoted to leader of its growing Eastern business.
The largest of the company's regions with over 40 offices east of the Mississippi River, the Eastern business consists of clients in the water, wastewater, stormwater, environmental services, and water resources sectors.
Muir has a 20-year background in delivering highly technical civil and environmental engineering projects. He has held leadership and technical roles on some of the most complex projects encompassing water and wastewater treatment, distribution and collection, pumping, and conveyance systems. His experience includes master planning, detailed design, permitting, and construction services.
Since joining Brown and Caldwell in 2018, Muir's business development expertise and client-centric focus have played a key role in setting the company's regional strategic direction to achieve strong financial results.
"Eric is a highly strategic and inclusive leader, passionate about mentoring employees to reach their full potential," said Brown and Caldwell Chief Operating Officer Euan Finlay. "His deep knowledge of clients' environmental obstacles will enhance the positive impacts our teams have on the communities we serve."
Based in Connecticut, Muir will manage overall operations and lead the implementation of the firm's strategy in the East. He will continue the region's growth and lead efforts to make Brown and Caldwell the company of choice for clients, employees, and partners. He will work alongside regional leadership to align the firm's talent pool with clients to provide innovative, cost-effective solutions to challenges related to water quality, biosolids management, and aging infrastructure.
About Brown and Caldwell
Headquartered in Walnut Creek, California, Brown and Caldwell is a full-service environmental engineering and construction services firm with 52 offices and 1,800 professionals across North America and the Pacific. For 75 years, our creative solutions have helped municipalities, private industry, and government agencies successfully overcome their most challenging water and environmental obstacles. As an employee-owned company, Brown and Caldwell is passionate about exceeding our clients' expectations and making a difference for our employees, our communities, and our environment. For more information, visit www.brownandcaldwell.com
Read the court decisionRead the full story...Reprinted courtesy of
Guidance for Structural Fire Engineering Making Its Debut
February 02, 2017 —
Nadine M. Post - Engineering News-RecordThe International Code Council has approved—as expected—the updated structural building-design standard, written by the American Society of Civil Engineers Structural Engineering Institute, for inclusion in the 2018 edition of the ICC’s model International Building Code. ICC’s validation committee certified “ASCE/SEI 7-16: Minimum Design Loads and Associated Criteria for Buildings and Other Structures,” and ICC’s board of directors confirmed it late last month, says Mike Pfeiffer, ICC’s senior vice president, technical services.
Read the court decisionRead the full story...Reprinted courtesy of
Nadine M. Post, ENRMs. Post may be contacted at
postn@enr.com
Common Flood Insurance Myths and how Agents can Debunk Them
September 17, 2014 —
Beverley BevenFlorez-CDJ STAFFProperty Casualty 360 listed four common misconceptions that many homeowners have about flood insurance. First myth on the list was, “I don’t have to worry about flooding because I don’t live near a body of water.” The author pointed out recent floods in desert areas such as Arizona and Nevada.
“I don't qualify for government flood insurance because my property isn’t located in a flood plain,” made number two on the list. According to Property Casualty 360, “NFIP can provide coverage available to any homeowner, regardless of their location.”
Read the court decisionRead the full story...Reprinted courtesy of
Lump Sum Subcontract? Perhaps Not.
August 20, 2019 —
David Adelstein - Florida Construction Legal UpdatesLump sum subcontract? Perhaps not due to a recent ruling where the trial court said “No!” based on the language in the subcontract and contract documents generally incorporated into the subcontract.
This is a ruling on an interpretation of a subcontract and contract documents incorporated into the subcontract that I do not agree with and struggle to fully comprehend. The issue was whether the subcontract amount was a lump sum or subject to an audit, adjustment, and definitization based on actual costs incurred. Of course, the subcontractor (or any person in any business) is not just interested in recouping actual costs, but there needs to be a margin to cover profit and home office overhead that does not get factored into field general conditions.
In United States v. Travelers Casualty and Surety Company, 2018 WL 6571234 (M.D.Fla. 2018), a prime contractor was hired to perform work on a federal project. During the work, the Government issued the prime contractor a Modification that had a not-to-exceed value and required the prime contractor to track its costs for this Modification separate from other contract costs. In other words, based on this Modification, the prime contractor was paid its costs up to a maximum amount and the prime contractor would separately cost-code and track the costs for this work differently than other work it was performing under the prime contract.
Read the court decisionRead the full story...Reprinted courtesy of
David Adelstein, Kirwin Norris, P.A.Mr. Adelstein may be contacted at
dma@kirwinnorris.com
Ex-San Francisco DPW Director Sentenced to Seven Years in Corruption Case
September 26, 2022 —
James Leggate - Engineering News-RecordA federal judge sentenced Mohammed Nuru, the former San Francisco public works director, to seven years in prison for bribery and kickbacks.
Nuru, 59, pleaded guilty to the charge of defrauding the public of its right to honest services earlier this year amid a federal investigation into public corruption in San Francisco’s government.
Reprinted courtesy of
James Leggate, Engineering News-Record
Mr. Leggate may be contacted at leggatej@enr.com
Read the full story...
Read the court decisionRead the full story...Reprinted courtesy of