Defective Stairways can be considered a Patent Construction Defect in California
September 24, 2014 —
William M. Kaufman – Construction Lawyers BlogStairs are not safe! At least the Court of Appeal in the Second Appellate District of California doesn’t think so.
A rail station in Los Angeles was completed by the Los Angeles County Metropolitan Transportation Authority (“MTA”) in 1993. The rail station was part of the development of the Southern California Rapid Transit District Metro Rail Project. In 2011, the plaintiff fell on a stairway at the station. In August 2012, Plaintiff sued the MTA for dangerous condition of public property, statutory liability, and negligence. Among other defects, plaintiff alleged the banister of the stairwell was “too low” and the stairwell “too small” given the number, age, and volume of people habitually entering and exiting the rail station. In addition, plaintiff alleged that MTA “failed to provide adequate safeguards against the known dangerous condition by, among other acts and omissions, failing to properly design, construct, supervise, inspect and repair the Premises causing the same to be unsafe and defective for its intended purposes.” MTA, in turn, cross-complained against Hampton- the entity that provided design and construction services at the station.
Hampton demurred to the first amended cross-complaint, asserting a four year statute of limitations defense pursuant to California Code of Civil Procedure section 337.1, claiming the alleged deficiencies were patent defects. On September 11, 2013, the trial court overruled the demurrer finding that the defect was not patent. Hampton appealed.
The appellate court overruled the trial court’s ruling and in fact, granted Hampton’s writ of mandate and even directed the trial court to sustain the demurrer without leave to amend! (Delon Hampton & Associates v. Sup. Ct. (Los Angeles County Metropolitan Transportation Authority) (Cal. App. Second Dist., Div. 3; June 23, 2014) 227 Cal.App.4th 250, [173 Cal.Rptr.3d 407].)
The appellate court found that the purpose of section 337.1 is to “provide a final point of termination, to proctect some groups from extended liability.” A “patent deficiency” has been defined as a deficiency which is apparent by reasonable inspection. See Tomko Woll Group Architects, Inc. v. Superior Court (1996) 46 Cal.App.4th 1326, 1336. The court found a patent defect can be discovery by the kind of inspection made in the exercise of ordinary care and prudence, whereas a latent defect is hidden and would not be discovered by a reasonably careful inspection. See Preston v. Goldman (1986) 42 Cal.3d 108, 123. The test to determine whether a construction defect is patent is an objective test that asks “whether the average consumer, during the course of a reasonable inspection, would discover the defect…” See Creekbridge Townhome Owners Assn., Inc. v. C. Scott Whitten, Inc. (2009) 177 Cal.App.4th 251, 256.
Mr. Kaufman may be contacted at wkaufman@lockhartpark.com, and you may visit the firm's website at www.lockhartpark.com
Read the court decisionRead the full story...Reprinted courtesy of
William M. Kaufman, Lockhart Park LP
The National Labor Relations Board Joint Employer Standard is Vacated by the Eastern District of Texas
April 22, 2024 —
Andrew G. Vicknair - The Dispute ResolverMany employment laws use the concept of joint employer to make more than one business entity responsible for complying with employment law obligations towards employees who to varying degrees work for, or under the direction of entities who are not technically the employees primary employer. Nowhere is that issue more prevalent than in contractor subcontractor relationships. Over the years the National Labor Relations Board (NLRB) has developed various tests for determining joint employer status. Unless a business entity is an employer of individuals, the NLRB has no jurisdiction over a dispute between the workers and a business entity for whom they work.
It is important for contractors to understand the importance of being an employer and the obligations that flow from such status. Likewise, it is also important to understand when a contractor may be classified as a “joint employer” over certain individuals. Depending on the specific laws involved, such a finding of joint-employer status can happen under the “joint employer doctrine” which often exists in subcontractor and temporary employment arrangements. The “joint-employer doctrine” may render a contractor responsible for another company’s employment liabilities.
Read the court decisionRead the full story...Reprinted courtesy of
Andrew G. Vicknair, D'Arcy Vicknair, LLCMr. Vicknair may be contacted at
agv@darcyvicknair.com
Court of Appeal Holds Only “Named Insureds” May Sue for Bad Faith Under California FAIR Plan Policy
May 10, 2021 —
Valerie A. Moore & Kathleen E.M. Moriarty - Haight Brown & Bonesteel LLPIn Wexler v. California Fair Plan Association (No. 303100, filed 4/14/21), Brooke Wexler’s parents insured their residence, which was located in a mountainous high-fire risk area, with a California FAIR Plan Association owner-occupied dwelling policy. The policy only listed Wexler’s parents and did not name Wexler, their adult child, under the policy’s “Insured Name” section. The FAIR Plan expressly disclaimed coverage for “unnamed people,” referred to by the court as the “no-coverage-for-unnamed-persons clause.”
FAIR Plan was created by the Legislature in 1968 and is a joint reinsurance association created to give homeowners in high risk areas access to basic property insurance and is a self-described “insurer of last resort.”
Reprinted courtesy of
Valerie A. Moore, Haight Brown & Bonesteel LLP and
Kathleen E.M. Moriarty, Haight Brown & Bonesteel LLP
Ms. Moore may be contacted at vmoore@hbblaw.com
Ms. Moriarty may be contacted at kemoriarty@hbblaw.com
Read the court decisionRead the full story...Reprinted courtesy of
Inspectors Hurry to Make Sure Welds Are Right before Bay Bridge Opening
August 27, 2013 —
CDJ STAFFEach of the 20 welds at the base of the tower of the Bay Bridge took more than four hours to complete, with the lengthy welds forming at one-and-a-half inches per minute. They’ve been finished for two years now, but inspectors are just now checking the welds for defects.
Any defects found will have to be removed and repaired. Mazen Wahbeh, an engineer on the project, assumes that less than 5 percent of the total welded area will have to be repaired. According to Wahbeh, the bridge can open before the welds are thoroughly checked and repaired, and so “the contractor is prioritizing the remaining work.”
Read the court decisionRead the full story...Reprinted courtesy of
Performance Bond Surety Takeover – Using Terminated Contractor To Complete The Work
January 06, 2020 —
David Adelstein - Florida Construction Legal UpdatesWhen a contractor is defaulted under a performance bond, can its surety hire the same defaulted contractor to complete the work? Stated differently, can the performance bond surety engage its defaulted bond-principal in taking over and completing the same work the contractor was defaulted under? The answer is “yes” if you are dealing with a standard form AIA A312 performance bond (and other bond forms that contain analogous language), as demonstrated by the recent decision in Seawatch at Marathon Condominium Association, Inc. v. The Guarantee Company of North America, 2019 WL 4850194 (Fla. 3d DCA 2019).
In this case, a condominium association hired a contractor in a multi-million dollar contract to renovate condominium buildings. The contractor provided the association, as the obligee, a performance bond written on an AIA A312 performance bond form. During construction, the association declared the contractor in default and terminated the contractor. In doing so, the association demanded that the performance bond surety make an election under paragraph 4 of the AIA A312 bond form that gave the surety the following options:
4.1 Arrange for the CONTRACTOR, with consent of the OWNER, to perform and complete the Contract; or
4.2 Undertake to perform and complete the Contract itself, through its agents or through independent contractors; or
4.3 Obtain bids or negotiated proposals from qualified contractors acceptable to the OWNER for a contract for performance and completion of the Contract, arrange for a contract to be prepared for execution by the OWNER and the contractor selected with the OWNER’S concurrence, to be secured with performance and payment bonds executed by a qualified surety equivalent to the Bonds Issued on the Contract, and pay to the OWNER the amount of damages as described in paragraph 6 in excess of the Balance of the Contract Price incurred by the OWNER resulting from the CONTRACTOR Default; or
Read the court decisionRead the full story...Reprinted courtesy of
David Adelstein, Kirwin Norris, P.A.Mr. Adelstein may be contacted at
dma@kirwinnorris.com
Banks Loosening U.S. Mortgage Standards: Chart of the Day
August 13, 2014 —
Jody Shenn – BloombergPerhaps more U.S. banks than at any time in two decades are making it easier to qualify for a mortgage.
The CHART OF THE DAY shows the net share of banks telling the Federal Reserve that they’re tightening standards in the home-loan market. In the central bank’s July survey of senior loan officers released last week, the net percentage for prime mortgages was negative 18.3 percent, by far the most loosening since it started asking the question by loan-quality category in 2007. It was also greater than the highest net share of banks easing in “all” mortgages in the 1990s or 2000s.
Still, lenders have a long way to go before they unwind the restrictions they imposed in the wake of the global financial crisis that risky home loans helped to create. The current trend is mainly about “small tweaks around the edges,” according to JPMorgan Chase & Co. mortgage-bond analysts.
Read the court decisionRead the full story...Reprinted courtesy of
Jody Shenn, BloombergMs. Shenn may be contacted at
jshenn@bloomberg.net
Intricacies of Business Interruption Claim Considered
January 07, 2015 —
Tred R. Eyerly – Insurance Law HawaiiReaching into the weeds to analyze a business interruption claim, the Massachusetts Court of Appeals determined the cost of ordinary payroll could be included in the calculation of net profit or loss in determining business loss income when business is resumed quickly after a fire. Verrill Farms, LLC v. Farm Family Cas. Ins. Co., 2014 Mass. App. LEXIS 145 (Mass. App. Ct. Nov. 4, 2014).
The insured suffered a fire loss at its farm store. Within two days, the business was reopened at alternate locations at reduced capacity. Within a month, the business had resumed nearly full capacity in temporary locations. No employees were laid off. This allowed the insured to maintain its business and generate income.
The insured submitted a claim for loss of business income, based on its loss of net income in the year after the fire. The insurer paid a sum considerably less than the claim based upon its interpretation of what expenses could be included in a calculation of net profit or loss in order to determine loss of business income. The trial court held that the insurer did not have to pay the cost of ordinary payroll beyond the sixty-day limit, and granted summary judgment in the insurer's favor.
Read the court decisionRead the full story...Reprinted courtesy of
Tred R. Eyerly, Insurance Law HawaiiMr. Eyerly may be contacted at
te@hawaiilawyer.com
When an Insurer Proceeds as Subrogee, Defendants Cannot Assert Contribution Claims Against the Insured
July 15, 2019 —
Shannon M. Warren - The Subrogation StrategistIn Farmers Mut. Ins. Co. of Mason County v. Stove Builder Int’l, 2019 U.S. Dist. Lexis 46993 (E.D. Ky.), the United States District Court for the Northern Division of the Eastern District of Kentucky, by adopting a Magistrate Judge’s report and recommendations, see Farmers Mut. Ins. Co. v. Stove Builder, Int’l, Inc., 2019 U.S. Dist. LEXIS 48103 (E.D. Ky. Feb. 11, 2019), considered whether to allow the defendants to file a third-party complaint against the plaintiff’s insureds-subrogors. Finding that the defendants could not pursue contribution claims against the plaintiff’s insureds-subrogors, the court denied the defendant’s motion to file a third-party complaint.
The underlying subrogation action involved allegations of strict liability, negligence and breach of warranty against a pellet heater manufacturer and the retailer who sold the heater. The claims arose from a fire allegedly originating from the heater, which spread to the insureds-subrogors’ home causing property damage, along with consequential damages. Pursuant to the applicable insurance policy, the insureds-subrogors’ insurer issued payments to its insureds-subrogors. Thereafter, the insurer filed suit against the heater manufacturer and retailer.
The defendants filed a motion for leave to file a third-party complaint against the plaintiff’s insureds-subrogors, seeking to assert a contribution claim. The defendants alleged that the insureds-subrogors failed to properly install and maintain the pellet heater. The defendants also sought a jury instruction that would permit the jury to apportion fault to the insureds-subrogors, resulting in a reduction of the plaintiff’s recovery. The court looked to federal procedural law, but Kentucky substantive law to decide the defendants’ motion.
Read the court decisionRead the full story...Reprinted courtesy of
Shannon M. Warren, White and WilliamsMs. Warren may be contacted at
warrens@whiteandwilliams.com