Expansion of Statutes of Limitations and Repose in K-12 and Municipal Construction Contracts
March 27, 2019 —
Henry Bangert - Colorado Construction LitigationThe purpose of this whitepaper is to bring attention to a trend in K-12 and municipal construction contracts, which expands the time periods for law suits against construction professionals.
Introduction and Background
Under Colorado statute, the period of time within which a legal action for construction defects may be brought against a construction professional in Colorado is two years from when the claimant (or its predecessor in interest) discovers or in the exercise of reasonable diligence should have discovered the physical manifestations of a defect (the “Statute of Limitations”), but in no case may an action be brought more than six years after substantial completion of the improvement, unless the claim arises in the fifth or sixth year after substantial completion, in which event the action may be brought within two years of such date, i.e., up to eight years after substantial completion (the “Statute of Repose”). See C.R.S. § 13-80-104. While the triggering events differ for the Statute of Limitations and Statue of Repose, the periods are intended to run concurrently to limit the period of time an action may be brought against construction professionals for construction defects to, at most, eight years after substantial completion. Importantly, these limitations periods may be expanded by agreement.
Prior to 1986, Colorado law provided for a 10-year Statute of Repose. However, in 1986, Colorado’s legislature shortened the Statute of Repose time limit to the current six (or up to eight) year period. In 1986, Colorado also redefined the date the claim arises from the date the defect was discovered or should have been discovered to the date the physical manifestation of a defect was discovered or should have been discovered. Therefore, after 1986, the two-year limitations period could begin to run when a claimant should have discovered the manifestation of a defect, even if the claimant did not recognize that a defect existed.
Read the court decisionRead the full story...Reprinted courtesy of
David McLain, Higgins, Hopkins, McLain & Roswell, LLCMr. McLain may be contacted at
mclain@hhmrlaw.com
Georgia Update: Automatic Renewals in Consumer Service Contracts
August 31, 2020 —
David R. Cook - AHC BlogGeorgia HB 1039 amends O.C.G.A. § 13-12-3 to provide additional protections for consumers who enter into service contracts containing lengthy automatic renewal provisions.
Pre-Existing Requirement: For service contracts with an initial term of twelve months or longer and an automatic renewal provision for more than one month, unless the consumer terminates the agreement, sellers must provide written or electronic notification of the automatic renewal provision to the consumer. The notification must be provided to the consumer between 30 and 60 days before the cancellation deadline under such renewal provision. The notice must also “clearly and conspicuously” disclose that unless the consumer cancels, the agreement will automatically renew and disclose how the consumer may obtain details about the automatic renewal provision and cancellation procedure. The process by which a consumer may obtain such information must include the seller’s contact information (e.g., specific phone number or address), reference to the contract, or any other method provided.
Read the court decisionRead the full story...Reprinted courtesy of
David R. Cook, Autry, Hall & Cook, LLPMr. Cook may be contacted at
cook@ahclaw.com
Newark Trial Team Obtains Affirmance of Summary Judgment for General Contractor Client
January 21, 2025 —
Lewis Brisbois NewsroomNewark, N.J. (December 31, 2024) - Days after
obtaining an Appellate Division victory affirming a “no cause” jury verdict, Newark Partner Afsha Noran and Managing Partner Colin Hackett obtained a
second appellate court victory affirming a trial court's dismissal of a complaint against another firm client, a general contractor.
The team had previously obtained summary judgment at the trial level on the grounds plaintiff could not establish a prima facie case against the client. The plaintiff appealed the grant of summary judgment and dismissal of her claim to the Appellate Division.
Read the court decisionRead the full story...Reprinted courtesy of
Lewis Brisbois
I.M. Pei, Architect Who Designed Louvre Pyramid, Dies at 102
July 01, 2019 —
James S. Russell - BloombergI.M. Pei, a dominant figure in American architecture for more than three decades who designed the Louvre’s crystal pyramid and the angular East Building of Washington’s National Gallery of Art, has died. He was 102.
His son Li Chung Pei said on Thursday that his father had died overnight, the New York Times reported.
Pei gave “this century some of its most beautiful interior spaces and exterior forms,” said the jury of the Pritzker Architecture Prize, which Pei won in 1983.
Though reserved and supremely diplomatic, Pei’s face, always crowned by round thick-rimmed glasses, could break unexpectedly into a wide, dazzling smile. He approached clients with charm and a quick wit, and they usually succumbed happily.
Read the court decisionRead the full story...Reprinted courtesy of
James S. Russell, Bloomberg
Thanks for My 6th Year Running as a Construction Litigation Super Lawyer
May 16, 2022 —
Christopher G. Hill - Construction Law MusingsIt is with humility and a sense of accomplishment that I announce that I have been selected for the sixth straight year to the Virginia Super Lawyers in the Construction Litigation category for 2022. Add this to my recent election to the Virginia Legal Elite in Construction and I’ve had a pretty good year. As always, I am thrilled to be included on these peer-elected lists.
So without further ado, thank you to my peers and those on the panel at Virginia Super Lawyers for the great honor. I feel quite proud to be part of the
5% of Virginia attorneys that made this list for 2020.
The full lists of Virginia Super Lawyers will appear in the May edition of Richmond Magazine. Please check it out.
Read the court decisionRead the full story...Reprinted courtesy of
The Law Office of Christopher G. HillMr. Hill may be contacted at
chrisghill@constructionlawva.com
OSHA ETS Heads to Sixth Circuit
December 13, 2021 —
George Morrison - White and Williams LLPOn November 16, 2021, the U.S. Court of Appeals for the Sixth Circuit was selected during the Judicial Panel on Multidistrict Litigation’s lottery to hear the multiple consolidated challenges to the recent COVID-19 Emergency Temporary Standard (ETS) issued by the Occupational Safety and Health Administration (OSHA). OSHA is permitted to issue an ETS if the agency arrives at the conclusion that a “grave danger” to worker safety exists. An ETS does not go through the typical notice-and-comment period that federal regulations usually follow.
Inheriting the Fifth Circuit’s recent nationwide stay on implementation and enforcement of the ETS, the Sixth Circuit will decide whether the stay should be “modified, revoked, or extended” in the short term. Early this morning, OSHA filed an emergency motion to dissolve the Fifth Circuit’s stay of the vaccine mandate with the Sixth Circuit. OSHA argued, among other things:
- The Fifth Circuit erred in holding “that OSHA lacked statutory authority to address the grave danger of COVID-19 in the place on the ground that COVID-19 is caused by a virus and also exists outside of the workplace” because “[t]hat rationale has no basis in the statutory text.”
- The Fifth Circuit erred in finding the ETS both over- and underinclusive because “OSHA recounted extensive empirical data showing that all employees can transmit COVID-19 in the workplace and that COVID-19 has spread in a vast variety of workplace.”
- The “petitioners have not shown that their claimed injuries outweigh the interests in protecting employees from a dangerous virus while this litigation proceeds . . . . These claimed injuries do not justify delaying the [ETS] that will save thousands of lives and prevent hundreds of thousands of hospitalizations.”
Read the court decisionRead the full story...Reprinted courtesy of
George Morrison, White and Williams LLPMr. Morrison may be contacted at
morrisong@whiteandwilliams.com
Claims Litigated Under Government Claims Act Must “Fairly Reflect” Factual Claims Made in Underlying Government Claim
November 27, 2023 —
Garret Murai - California Construction Law BlogUnlike horseshoes and hand grenades, close sometimes isn’t close enough.
In the next case, Hernandez v. City of Stockton, 90 Cal.App.5th 1222 (2023), the Third District Court of appeal found that a pedestrian who sued a public entity for personal injuries caused by an “uplifted sidewalk” was barred from pursuing his claim when it was revealed that he had in fact injured himself by falling into a hole left by an “empty tree well” (i.e., a tree well that did not contain a tree”). According to the Court, the pedestrian’s claim was barred because the factual basis for recovery asserted in his complaint was not “fairly reflected” in his government claim.
The Hernandez Case
In April 2018, pedestrian Manual Sanchez Hernandez injured himself while walking on a public sidewalk in Stockton, California. He submitted a government claim with the City of Stockton claiming that his injuries, which included injuries to his knee, hands and back, was caused by a dangerous condition on public property. In his government claim, Hernandez alleged that he tripped on an “uplifted sidewalk” at or near 230 E. Charter Way in Stockton, California and that his injuries were due because the City “negligently and recklessly designed, maintained and operated the subject property so as to cause [his] injuries.”
Read the court decisionRead the full story...Reprinted courtesy of
Garret Murai, Nomos LLPMr. Murai may be contacted at
gmurai@nomosllp.com
Ohio Court Finds No Coverage for Construction Defect Claims
March 01, 2012 —
Tred R. Eyerly - Insurance Law HawaiiCharles and Valerie Myers hired Perry Miller to build their home. Myers v. United Ohio Ins. Co., 2012 Ohio App. LEXIS 287 (Ohio Ct. App. Jan. 26, 2012). After completion of the home, Miller was again hired to construct an addition which included a full basement, staircases, bathroom, bedroom, hallway and garage.
After the addition was completed, one of the basement walls began to crack and bow. Miller began to make repairs, but eventually stopped working on the project. Other contractors were hired to make repairs, but further problems developed. A second basement wall began to bow and crack, allowing water into the basement. The wall eventually had to be replaced. Subsequently, the roof over the addition began to leak in five or six places before the drywall could be painted. The leaks caused water stains on the drywall and cause it to separate and tear. It was discovered the roof needed to be replaced.
The Myers sued Miller and his insurer, United Ohio Insurance Company. The trial court ruled that the policy did not provide coverage for faulty workmanship, but did provide coverage for consequential damages caused by repeated exposure to the elements. United Ohio conceded liability in the amount of $2,000 to repair water damage to the drywall. United Ohio was also found liable for $51,576, which included $31,000 to repair the roof and ceiling and $18,576 to replace the basement wall.
Read the full story…
Reprinted courtesy of Tred R. Eyerly, Insurance Law Hawaii. Mr. Eyerly can be contacted at te@hawaiilawyer.com
Read the court decisionRead the full story...Reprinted courtesy of