Presidential Executive Order 14008: The Climate Crisis Order
August 16, 2021 —
Anthony B. Cavender - Gravel2GavelPresidential Executive Order 14008, “Tackling the Climate Crisis,” a long and unusually detailed Executive Order published in the Federal Register on February 1, 2021 (see 86 FR 7619), has generated considerable discussion and commentary. Below, I briefly outline its provisions.
This EO describes the “climate crisis” in existential terms:
“There is little time left to avoid setting the world on a dangerous, potentially catastrophic climate trajectory.” Confronting and combating climate change will be an important component of American foreign policy and national security, and domestically, the federal government’s resources will be mobilized to deploy a “govern-wide approach to the climate crisis.”
Read the court decisionRead the full story...Reprinted courtesy of
Anthony B. Cavender, PillsburyMr. Cavender may be contacted at
anthony.cavender@pillsburylaw.com
The Anatomy of a Construction Dispute Stage 3- The Last Straw
January 28, 2015 —
Christopher G. Hill – Construction Law MusingsOver the past two weeks here at Construction Law Musings, I’ve discussed the first two stages of a typical construction dispute (if such a thing exists): the claim, and how to bring heat short of litigation/arbitration. As promised, this week I’ll be discussing the next step or “last straw” in a construction dispute, namely, arbitration or litigation to enforce all of those rights that you preserved in the first two stages.
Construction litigation is expensive, time consuming, and, quite frankly, a pain in the neck. Because of this fact, I almost always recommend that my construction clients exhaust all of the non-litigation methods (including mediation of course) of resolving their disputes prior to “going nuclear” and filing suit. Unfortunately, even the most diligent attempts at less formal resolution means can be unfruitful and more formal means become necessary.
Read the court decisionRead the full story...Reprinted courtesy of
Christopher G. Hill, Law Office of Christopher G. Hill, PCMr. Hill may be contacted at
chrisghill@constructionlawva.com
Reroof Blamed for $10 Million in Damage
November 06, 2013 —
CDJ STAFFA renovation of the city hall in Bay City, Michigan went wrong when roof repairs lead to fire and flooding of the historic building. Bay City has sued Gregory Construction and Mihm Enterprises, who earlier had been awarded a $1.5 million contract to reroof the building. The cost of repairing the building is expected to exceed the city’s insurance limit of $10 million.
The fire that damaged the building is alleged to have started when a roofer allegedly used a DeWalt grinder in attempt to remove some bolts. Under the contract with the city, the contractor was not going to use grinders, due to the risk of fire. The suit alleges that further water damage was caused, beyond the damage due to the firefighting, due to the contractor failing to “secure a section of the roof which was part of the Roofing Project with a tarp or other water-resistant covering.”
The contractors dispute the claims made by Bay City, with Gregory Construction describing them as “untrue and contrary to the facts.” Gregory Construction also claims that their obligations were delegated to Mihn Enterprises. Mihn Enterprises disputes this and states that they do not “owe a duty to the Plaintiffs; as a result their negligence claim is unenforceable as a matter of law.”
Read the court decisionRead the full story...Reprinted courtesy of
2024 Construction Law Update
December 23, 2023 —
Garret Murai - California Construction Law BlogWe would like to wish you and yours a happy holiday season as we approach 2024.
The first half of the 2023-2024 legislative session saw the introduction of 3,028 bills, which, according to legislative observers, are the most bills introduced in a session in more than a decade, perhaps reflecting the fact that California has a record number of new legislators with over a quarter taking the oath of office for the first time. Of these bills, Governor Newsom signed nearly 400 into law including several impacting the construction industry related to climate change and housing affordability.
Read the court decisionRead the full story...Reprinted courtesy of
Garret Murai, Nomos LLPMr. Murai may be contacted at
gmurai@nomosllp.com
Saved By The Statute: The Economic Loss Doctrine Does Not Bar Claims Under Pennsylvania’s Unfair Trade Practices and Consumer Protection Law
May 10, 2021 —
Gus Sara - The Subrogation StrategistIn Earl v. NVR, Inc., No. 20-2109, 2021 U.S. App. LEXIS 6451, the U.S. Court of Appeals for the Third Circuit (Third Circuit) considered whether, under Pennsylvania law, the plaintiff’s Unfair Trade Practices and Consumer Protection Law (UTPCPL) claims against the builder of her home were barred by the economic loss doctrine. The UTPCPL is a Pennsylvania statute that prohibits “unfair methods of competition and unfair or deceptive acts or practices in the conduct of any trade or commerce.” 73 Pa. Stat. Ann. § 201-3. The Third Circuit previously addressed the impact of the economic loss doctrine on UTPCPL claims in Werwinski v. Ford Motor Co., 286 F.3d 661 (3d Cir. 2002). In Werwinski, the court held that the plaintiff’s UTPCPL claim was barred by the economic loss doctrine. The Court of Appeals overturned its decision in Werwinski and held that the economic loss doctrine does not bar UTPCPL claims since such claims are statutory, and not based in tort.
In Earl, the plaintiff, Lisa Earl, entered into an agreement with defendant NVR, Inc. (NVR) for the construction and sale of a home in Allegheny County, Pennsylvania. Ms. Earl learned of the home through NVR’s marketing, which described the home as containing “quality architecture, timeless design, and beautiful finishes.” Ms. Earl alleged that during the construction of the home, she had further discussions with agents of NVR, who made representations that the home would be constructed in a good and workmanlike manner and that any deficiencies noted by Ms. Earl would be remedied. The defendant also assured Ms. Earl that the home would be constructed in accordance with relevant building codes and industry standards. After moving into the home, Ms. Earl discovered several material defects in the construction. She provided notice of these defects to NVR, but NVR’s attempts to repair some of the defects were inadequate.
Read the court decisionRead the full story...Reprinted courtesy of
Gus Sara, White and WilliamsMr. Sara may be contacted at
sarag@whiteandwilliams.com
CDJ’s #9 Topic of the Year: Nevada Supreme Court Denies Class Action Status in Construction Defect Case
December 31, 2014 —
Beverley BevenFlorez-CDJ STAFFAccording to Sean Whaley of the Las Vegas Review-Journal, “The Nevada Supreme Court has rejected a request for class action status for claims of damaged stucco from faulty construction by Del Webb Communities involving nearly 1,000 Sun City Summerlin residents.” However, “the court upheld the award of damages to 71 homeowners following a jury trial in Clark County District Court in 2008.” Whaley reported that this construction defect case was touted as the largest in Nevada history.
Read the court decisionRead the full story...Reprinted courtesy of
Court Finds No Occurrence for Installation of Defective flooring and Explains Coverage for Attorney Fee Awards
January 05, 2017 —
Christopher Kendrick & Valerie A. Moore – Haight Brown & Bonesteel LLPIn Navigators Specialty Ins. Co. v. Moorefield Const. (No.G050759, filed 12/27/16), a California appeals court held that the knowing installation of flooring over a vapor-emitting slab was not an accident or occurrence, entitling the insurer to reimbursement of money paid as damages to settle a construction defect suit. But the court further held that there was no right of reimbursement for the portion of money payable under the policy’s supplementary payments coverage as costs for contractual prevailing party attorney’s fees.
Navigators insured Moorefield, the general contractor for a Best Buy store. Testing in construction revealed a vapor emission rate from the concrete slab above the approved standard for the flooring. The contractor’s personnel testified that it was normal to install the flooring regardless. Notwithstanding, the contractor’s personnel testified that they consulted the owner and were directed to proceed. In doing so, the contractor also expressly released the flooring subcontractor from any warranty claims.
Reprinted courtesy of
Christopher Kendrick, Haight Brown & Bonesteel LLP and
Valerie A. Moore, Haight Brown & Bonesteel LLP
Mr. Kendrick may be contacted at ckendrick@hbblaw.com
Ms. Moore may be contacted at vmoore@hbblaw.com
Read the court decisionRead the full story...Reprinted courtesy of
N.J. Appellate Court Applies Continuous Trigger Theory in Property Damage Case and Determines “Last Pull” for Coverage
November 15, 2017 —
K. Alexandra Byrd – Saxe Doernberger & Vita, P.C.The New Jersey Superior Court, Appellate Division, published an important decision addressing several fundamental issues regarding how a commercial general liability (CGL) policy applies to long-term property damage. The court held that: (1) a continuous trigger theory of coverage may be applied to third-party liability claims involving progressive property damage caused by an insured’s allegedly defective work; (2) the “last pull” (i.e., the cutoff point) of the continuous trigger is when the “essential nature and scope” of the property damage first becomes known or could reasonably be known; and (3) the “last pull” is not when the property damage is “attributed” to the insured’s faulty work.
The underlying action in Air Master & Cooling Inc. v. Selective Ins. Co., et al. 1 concerned property damage arising out of the construction of a seven-story, 101-unit condominium building in Montclair, New Jersey. The project’s construction manager hired Air Master & Cooling, Inc. (Air Master) to perform HVAC work on the project, including installing individual HVAC equipment in each resident’s unit from 2005 to 2008. In early 2008, unit owners began complaining about water infiltration and damage to their windows, ceilings, and other portions of their units. The general contractor and developer began assessing the damage and making repairs. Eventually, in April 2010, an expert consultant performed a moisture survey of the roof and discovered 111 areas that were damaged by water infiltration. The expert report indicated that “it [was] impossible to determine when [the] moisture infiltration occurred.”
Read the court decisionRead the full story...Reprinted courtesy of
K. Alexandra Byrd, Saxe Doernberger & Vita, P.C.Ms. Byrd may be contacted at
kab@sdvlaw.com