Construction Lien Needs to Be Recorded Within 90 Days from Lienor’s Final Furnishing
March 22, 2018 —
David Adelstein – Florida Construction Legal UpdatesA lienor needs to record its construction lien within 90 days of its final furnishing date. This final furnishing date excludes punchlist, warranty, or the lienor’s own corrective work. A lien recorded outside of the 90-day window will be deemed invalid.
The opinion in In re: Jennerwein, 309 B.R. 385 (M.D. Fla. 2004) provides a good discussion of this 90-day window. This matter dealt with a debtor / owner’s bankruptcy where the owner was contesting the validity of a construction lien by its pool contractor. The owner contended that the lienor’s lien was recorded outside of this 90-day window thus rendering the lien invalid. The bankruptcy court was determining the validity of the lien.
In this matter, the owner hired a swimming pool contractor to construct a pool. On October 25, 2002, the pool contractor installed pavers around the pool. After this was performed, the pool contractor realized the owner was unable to obtain the financing to pay for the pool. As a result, the pool contractor ceased doing any more improvements. But, neither the pool contractor nor the owner terminated the contract. Then, on November 27, 2002, the pool contractor sent a supervisor to the property to inspect the pool (work-in-place), the pool equipment, the installed pavers, made a list of the unfinished work, and remove any debris. On January 27, 2003, the pool contractor recorded its lien.
Read the court decisionRead the full story...Reprinted courtesy of
David Adelstein, Florida Construction Legal UpdatesMr. Adelstein may be contacted at
dadelstein@gmail.com
California Restricts Principles of “General” Personal Jurisdiction
April 01, 2015 —
Kristian B. Moriarty and R. Bryan Martin – Haight Brown & Bonesteel LLPIn BNSF Railway Company v. Superior Court (Kralovetz) (Filed 3/27/2015, No. B260798), the California Court of Appeal, Second District, held a Delaware railroad corporation, with its principal place of business in Texas, was not subject to “general” personal jurisdiction in California, despite California housing 8.1% of the corporation’s total workforce, accounting for 6% of the corporation’s revenue, and containing just under 5% of its total track mileage.
Plaintiff, Vicki Kralovetz, filed suit in California Superior Court against defendant, BNSF Railway Company (“BNSF”), and others, for wrongful death. Plaintiff contended her husband was exposed to asbestos products manufactured by BNSF in Kansas while working at a dismantling facility owned by BNSF’s predecessor in interest. Plaintiff claimed the exposure caused her husband to contract mesothelioma, which resulted in his death.
Reprinted courtesy of
Kristian B. Moriarty, Haight Brown & Bonesteel LLP and
R. Bryan Martin, Haight Brown & Bonesteel LLP
Mr. Moriarty may be contacted at mmoriarty@hbblaw.com
Mr. Martin may be contacted at bmartin@hbblaw.com
Read the court decisionRead the full story...Reprinted courtesy of
Michigan Court of Appeals Remands Construction Defect Case
February 14, 2022 —
Tred R. Eyerly - Insurance Law HawaiiAfter its prior decision holding there was no coverage for faulty workmanship was remanded by the Michigan Supreme Court, the Court of Appeals remanded to the trial court. Skanska United States Bldg. v. M.A.P. Mech. Contrs., 2021 Mich. App. LEXIS 7336 (Mich. Ct. App. Dec. 28, 2021). The post summarizing the Supreme Court decision is here.
Skanska USA Building was the construction manager on a renovation project at a medical center. Skanska subcontracted the heating and cooling portion of the project to defendant M.A.P. MAP held a CGL policy from Amerisure. Skanska and the medical center were named as additional insureds.
MAP installed a steam boiler and related piping for the heating system. When completed, the heating system did not function properly. MAP installed some of the expansion joints backwards, causing damage to concrete, steel, and the heating system.
Read the court decisionRead the full story...Reprinted courtesy of
Tred R. Eyerly, Damon Key Leong Kupchak HastertMr. Eyerly may be contacted at
te@hawaiilawyer.com
Rulemaking to Modernize, Expand DOI’s “Type A” Natural Resource Damage Assessment Rules Expected Fall 2023
December 23, 2023 —
Amanda G. Halter, Jillian Marullo & Ashleigh Myers - Gravel2Gavel Construction & Real Estate Law BlogThe U.S. Department of the Interior (DOI) anticipates proposing a new rule that would revise its “Type A” Natural Resource Damage Assessment (NRDA) regulations under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) in Fall 2023. The proposed rule would modernize DOI’s rarely used simplified Type A procedures for assessing damages for natural resource injuries tailored at sites involving minor releases of hazardous substances, with a smaller scale and scope of natural resource injury occurring in either coastal and marine areas or Great Lakes environments (the “Type A Rule”). (See 88 Fed. Reg. 3373; see 43 C.F.R. Pt. 11 Subpt. D.) The Type A Rule was last updated in 1997.
DOI previewed the proposal in January 2023 in its Office of Restoration and Damage Assessment’s (ORDA)
Advanced Notice of Proposed Rulemaking (ANPR). In the ANPR, the ORDA surmised that the Type A Rule was rarely used in part because of its restricted scope, but also because “the model equation for each Type A environment is the functional part of the rule itself—with no provisions to reflect evolving toxicology, ecology, technology, or other scientific understanding without a formal amendment to the Type A Rule each time a parameter is modified.” Calling the existing rule “inefficient and inflexible,” the ORDA stated that its proposal to reformulate the rule “as a procedural structure” would “modernize the Type A process and develop a more flexible and enduring rule than what is provided by the two existing static models” (88 Fed. Reg. 3373).
Reprinted courtesy of
Amanda G. Halter, Pillsbury,
Jillian Marullo, Pillsbury and
Ashleigh Myers, Pillsbury
Ms. Halter may be contacted at amanda.halter@pillsburylaw.com
Ms. Marullo may be contacted at jillian.marullo@pillsburylaw.com
Ms. Myers may be contacted at ashleigh.myers@pillsburylaw.com
Read the court decisionRead the full story...Reprinted courtesy of
Portion of Washington State’s Prevailing Wage Statute Struck Down … Again
July 04, 2023 —
Brett Hill & Mason Fletcher - Ahlers Cressman & SleightIn 2018, the Washington Legislature amended its prevailing wages statute adopting S.S.B 5493 and codified as RCW 39.12.015(3). RCW 39.12.015(3) changed how the Washington State Department of Labor and Industries’ industrial statistician set the prevailing wages for employees on public works projects, from a county-by-county basis to a “geographic jurisdiction” basis established in collective bargaining agreements (“CBA”) or if multiple CBAs, the CBA with the higher wage would prevail. This change proved problematic for contractors since it allowed a minority of employees to determine the prevailing wage through side agreements and limited meaningful wage negotiations by industry trade groups. Contrary to the previous rule wherein wages were set by the average or majority wage rate in a certain county (which was normally the collectively bargained wage) and provided some flexibility to the industrial statistician in determining the prevailing wage, now, RCW 39.12.015(3)(a) directs the industrial statistician to “establish the prevailing rate of wage by adopting the hourly wage … paid for the geographic jurisdiction established in [CBAs],” removing flexibility, and requiring the inclusion of CBA (which could encompass multiple counties) wage rates as a part of the prevailing wage formula.
Reprinted courtesy of
Brett Hill, Ahlers Cressman & Sleight and
Mason Fletcher, Ahlers Cressman & Sleight
Mr. Hill may be contacted at brett.hill@acslawyers.com
Mr. Fletcher may be contacted at mason.fletcher@acslawyers.com
Read the court decisionRead the full story...Reprinted courtesy of
Warning! Danger Ahead for Public Entities
July 30, 2019 —
Michael J. Baker - Snell & Wilmer Under Construction BlogPublic entities are known to assert False Claims actions “to up the ante” to intimidate and aggressively address contractor construction claims. This strategy in the case of John Ross of Industrial Sheet Metal, Inc. (JRI) V. City of Los Angeles Department of Airports (LAWA), 29 Cal. App. 5th 378 (2018), backfired on the public entity, LAWA, in a big way and should serve as a warning to public entities about expanding claims to include False Claim actions. In this case, LAWA was awarded $1 in contract damages, its California False Claims Act (CFCA) claim was rejected by the jury as were JRI’s claims against LAWA. Despite losing on the substantive contract claims, the trial court found that JRI “prevailed in the action” under the relevant CFCA fee provision, Government Code 12652, subd. (g)(9)(B), regardless of JRI’s failure to prevail in the action as a whole. The California Appellate Court (hereinafter “Court”) affirmed the trial court’s finding.
The CFCA is analogous to the federal False Claims Act (FFCA; 31 U.S.C. 3729 et seq.). Since the CFCA is patterned on similar federal legislation, it was appropriate for the Court to look to precedent construing this similar federal act in interpreting the CFCA provisions. Accordingly, the Court looked at the False Claims Act cases for guidance in upholding the trial court’s decision in its determination that JRI was the “prevailing party” for determining an attorney’s fees award against LAWA.
Read the court decisionRead the full story...Reprinted courtesy of
Michael J. Baker, Snell & WilmerMr. Baker may be contacted at
mjbaker@swlaw.com
London Shard Developer Wins Approval for Tower Nearby
November 05, 2014 —
Neil Callanan - BloombergSellar Property Group, developer of the Shard in London, won local government approval to build a 26-story residential tower close to the skyscraper on the south bank of the River Thames.
The council for the Southwark borough voted in favor of the 148-apartment project, which also includes a 16-story tower, at a meeting yesterday, Sellar spokesman Baron Phillips said by e-mail. The project, like the Shard, will be developed in a partnership with the state of Qatar.
Developers plan to construct more than 25,000 luxury properties in London worth more than 60 billion pounds ($96 billion) over the next decade, EC Harris said in an Oct. 7 report. The homes approved yesterday at the Fielden House site are expected to sell for about 800,000 pounds each, according to a filing by the borough.
Read the court decisionRead the full story...Reprinted courtesy of
Neil Callanan, BloombergMr. Callanan may be contacted at
ncallanan@bloomberg.net
Electronic Signatures On Contracts: Are They Truly Compliant?
April 10, 2023 —
Rebecca S. Glos - ConsensusDocsElectronic Signatures On Contracts: Are They Truly Compliant
As companies move to work-from-home situations in the wake of the COVID-19 pandemic, the issue of whether electronic signatures are legally recognized becomes more relevant. For many platforms, an electronic signature merely requires logging in, clicking a button, or typing your name. This process, which replaces the mighty pen and quill, is so effortless that oftentimes an electronic signature may feel like it does not carry the same weight as a handwritten signature. Thus, the question that we should be asking ourselves is whether the law recognizes this type of signature as being valid? Additionally, if electronic signatures are, indeed, valid, are there exceptions on whether they can be used?
Difference Between “Electronic” And “Digital” Signatures
Before delving into this issue, an understanding of some related terms may be helpful. In basic terms, an electronic signature (or “e-signature”) is any signature created or captured through a computer or other electronic device. Electronic signatures can include touch-sensitive screens where you use your finger or a stylus to sign your name as you would on a paper document. Electronic signatures can also include forms where you merely type in your name and perhaps other identifying information, then check a box stating that you intend to sign the document. They cover the full range of technologies and solutions to create signatures electronically such as:
- Clicking “I Agree” on a website;
- Signing with your finger on a mobile device;
- Typing your name or PIN into an online form; or
- Using e-signature software
Read the court decisionRead the full story...Reprinted courtesy of
Rebecca S. Glos, Watt, Tieder, Hoffar, & Fitzgerald, LLP (ConsensusDocs)Ms. Glos may be contacted at