Court of Appeals Expands Application of Construction Statute of Repose
December 29, 2020 —
Jonathan Schirmer - Ahlers Cressman & Sleight PLLCA recent decision by Division I of the Washington Court of Appeals in Puget Sound Energy, Inc v. Pilchuck Contractors, Inc.[1] demonstrates the broad application of the construction statute of repose to work performed by contractors.
The construction statute of repose[2] bars certain legal claims based on construction activity if the alleged harm caused by the activity does not occur within a specific timeframe. The claims covered by the construction statute of repose include:
all claims or causes of action of any kind against any person, arising from such person having constructed, altered, or repaired any improvement upon real property, or having performed or furnished any design, planning, surveying, architectural or construction or engineering services, or supervision or observation of construction, or administration of construction contracts for any construction, alteration or repair of any improvement upon real property.[3] Read the court decisionRead the full story...Reprinted courtesy of
Jonathan Schirmer, Ahlers Cressman & Sleight PLLCMr. Schirmer may be contacted at
jonathan.schirmer@acslawyers.com
A Trivial Case
November 07, 2022 —
Garret Murai - California Construction Law BlogConstruction defect cases leading to physical injury are rarely trivial, at least in the eyes of the injured party, but alas sometimes they are as the next case,
Nunez v. City of Redondo Beach, 81 Cal.App.5th 749 (2022), demonstrates.
The Nunez Case
Monica Nunez, Vice President of Finance and Accounting at a restaurant chain and a part-time fitness instructor at a gym, tripped and fell on a public sidewalk in Redondo Beach. Ms. Nunez, who was in her forties, tripped following a group run when her back foot hit a sidewalk slab that was elevated at its highest point approximately 11/16 inches. Ms. Nunez landed on her left knee and right arm and in the process fractured her kneecap and elbow.
Ms. Nunez sued the City of Redondo Beach for her injuries alleging causes of action for dangerous conditions on public property under Government Code section 835, nuisance under Government Code section 815.2, and failure to perform a mandatory duty under Government Code section 815.6.
Read the court decisionRead the full story...Reprinted courtesy of
Garret Murai, Nomos LLPMr. Murai may be contacted at
gmurai@nomosllp.com
LaGuardia Airport Is a Mess. An Engineer-Turned-Fund Manager Has a Fix
May 26, 2019 —
Sree Vidya Bhaktavatsalam - BloombergThierry Déau’s engineering training in France led him early in his career to building government-funded infrastructure. But it was his entrepreneur father back home in Martinique who inspired him to strike out on his own in 2005. He started Paris-based Meridiam to finance, build, and manage long-term projects. Now, with €7 billion ($7.83 billion) in seven funds and nine offices across Europe, the Middle East, Africa, and North America, Meridiam is playing a key role in high-profile projects such as the upgrade of New York’s LaGuardia Airport and a road tunnel under the Port of Miami. Déau describes Meridiam’s investment approach in an interview with Bloomberg Markets.
Read the court decisionRead the full story...Reprinted courtesy of
Sree Vidya Bhaktavatsalam, Bloomberg
Nevada Legislature Burns Insurers' Rights to Offer Eroding Limits
August 28, 2023 —
William S. Bennett - Saxe Doernberger & Vita, P.C.Nevada’s legislature recently passed a groundbreaking law imposing two prohibitions on insurers. First, the law prohibits insurers from issuing or renewing any liability insurance policy with an “eroding limits” provision. While the first section of the law will have the most immediate effects, the statute goes further, generally prohibiting insurers from limiting the availability of coverage for the costs of defense, legal costs and fees, and other claim expenses. This second section leaves a great deal to interpretation, with the potential to massively expand policyholder rights, and may throw the traditional structure of liability insurance policies into question.
Nevada Statute §679a provides as follows:
Notwithstanding any other provision of law, an insurer, including, without limitation, an insurer listed in NRS 679A.160, shall not issue or renew a policy of liability insurance that contains a provision that:
- Reduces the limit of liability stated in the policy by the costs of defense, legal costs and fees and other expenses for claims; or
- Otherwise limits the availability of coverage for the costs of defense, legal costs and fees and other expenses for claims.
Read the court decisionRead the full story...Reprinted courtesy of
William S. Bennett, Saxe Doernberger & Vita, P.C.Mr. Bennett may be contacted at
WBennett@sdvlaw.com
How Berlin’s Futuristic Airport Became a $6 Billion Embarrassment
October 28, 2015 —
Joshua Hammer – BloombergThe inspectors could hardly believe what they were seeing. Summoned from their headquarters near Munich, the team of logistics, safety, and aviation experts had arrived at newly constructed Berlin Brandenburg International Willy Brandt Airport in the fall of 2011 to begin a lengthy series of checks and approvals for the €600 million ($656 million) terminal on the outskirts of the German capital. Expected to open the following June, the airport, billed as Europe’s “most modern,” was intended to handle 27 million passengers a year and crown Berlin as the continent’s 21st century crossroads.
The team of inspectors, known as ORAT, for Operations Readiness and Airport Transfer, brought in a dummy plane and volunteers as test passengers. They examined everything from baggage carousels and security gates to the fire protection system. The last was an especially high priority: None could forget the 1996 fire that roared through Düsseldorf Airport’s passenger terminal, killing 17.
Read the court decisionRead the full story...Reprinted courtesy of
Joshua Hammer, Bloomberg
Is the Manhattan Bank of America Tower a Green Success or Failure?
April 15, 2014 —
Beverley BevenFlorez-CDJ STAFFConstruction Digital reported that the Bank of America tower in Manhattan, New York, “has been conversely hailed as both the greenest skyscraper in the world and an energy-guzzling toxic tower that exposes the charade of the LEED rating system.” It is the first skyscraper to ever achieve the highest LEED Platinum rating. However, a critic alleged that the eighty-year old Empire State Building “uses half the energy” of the new Bank of America tower.
The Bank of America tower, designed by architects Cook and Fox, was built with “local and recycled materials,” as well as “floor-to-floor insulated glazing” that maximizes “natural light and traps heat, and lights are automatically dimmed in daylight.” Rainwater is captured for reuse, and “waterless urinals save an estimated 8,000,000 US gallons of water per year.”
However, Construction Digital reported that Sam Roudman in New Republic Magazine “pointed out that buildings contribute more to global warming than any other sector of the economy, consuming more energy and producing more greenhouse gas emissions in America than every car, bus, jet, and train combined; and furthermore, than every factory combined.”
Joel Levy writing for Construction Digital declared, “We can call LEED a failed artifice and even suggest abandoning it as a pointless charade, but unless we want to live in caves and go back to using candles for light, we must accept the fact that the 155,000,000 people that make up America’s workforce power the country and indeed the world’s economy…need somewhere to work.”
Read the court decisionRead the full story...Reprinted courtesy of
Scientists Are Trying to Make California Forests More Fire Resilient
June 21, 2021 —
Laura Bliss - BloombergTo the untrained eye, the scrubby slope off Wentworth Springs Road in the Eldorado National Forest looks like any other patch of Sierra Nevada ridgetop. Tufted in native shrubs and flecked by darkened pine stumps, it’s part of a 30,000-acre swath of land that was deforested in 2014, when the King Fire tore through 17 miles of canyon in less than six hours.
But Dana Walsh can see what’s unique. On a recent Sunday morning, the USDA Forest Service forester bent over a white flag pinned into the ground to mark a barely-visible seedling. As she points to other seemingly camouflaged baby conifers nearby, what starts to emerge is a subtle pattern she calls cluster planting.
“It’s tough to make out unless you know to look for it,” she said. “But once you see a tree, then you can spot the five or six planted near it. Then there’s nothing. Then there’s another five or six. Then there’s nothing.”
Read the court decisionRead the full story...Reprinted courtesy of
Laura Bliss, Bloomberg
The BUILDCHAIN Project Enhances Data Exchange and Transparency in the EU Construction Industry
January 23, 2023 —
Aarni Heiskanen - AEC BusinessTrace Labs, a WEB 3 developer, joins the EU’s efforts to create a smarter and more sustainable built environment with the
BUILDCHAIN project. With its 11 EU partners, Trace Labs aims to improve efficiency, reduce errors, and increase transparency and trust in construction.
Efficient, transparent, and trusted data exchange is a powerful tool for driving sustainability, resilience, and energy efficiency in construction. However, there are several obstacles to trusted data exchange in the industry today:
- Data silos: Construction projects involve multiple parties and stakeholders, each of which may have its systems for storing and sharing information. This can lead to data silos and a lack of coordination, making it difficult to access and trust the data.
- Lack of standardization: Construction projects may use different formats for storing and sharing data, leading to difficulties in comparing and combining information from various projects.
- Data security: Construction projects often involve sensitive information, such as building plans, materials lists, and inspection results. Ensuring this information is secure and protected from unauthorized access can be a significant challenge.
- Lack of incentives: There are often few incentives for construction companies and other stakeholders to share data and collaborate on projects, making establishing trust and transparency challenging.
Read the court decisionRead the full story...Reprinted courtesy of
Aarni Heiskanen, AEC BusinessMr. Heiskanen may be contacted at
aec-business@aepartners.fi