NTSB Cites Design Errors in Fatal Bridge Collapse
November 28, 2018 —
Scott Judy - Engineering News-RecordDesign errors may have played a role in the collapse of the 174-foot-long bridge span that was under construction at Florida International University, according to a Nov. 15 investigative update from the National Transportation Safety Board (NTSB). The structure, which was being constructed over live traffic along SW 8th Street, killed six when it suffered a sudden, catastrophic collapse on March 15.
Read the court decisionRead the full story...Reprinted courtesy of
Scott Judy, ENRMr. Judy may be contacted at
judys@enr.com
Never, Ever, Ever Assume! (Or, How a Stuck Shoe is Like a Construction Project Assumption)
October 21, 2019 —
Melissa Dewey Brumback - Construction Law in North CarolinaThis summer, I had the fortune of taking a trip to Europe. The first place I visited was Amsterdam. A lovely town with a lot of culture and more canals than you can shake a stick at. I was meeting family there, but had hours to kill ahead of time. So, I decided to take the train from the airport into the City Centre, leave my bags at the train station luggage locker, and begin exploring.
My plan took its first misstep when I attempted to board the train. Not being in a hurry, I let the other passengers get on first. Sure, I noticed the train conductor blowing his whistle while I stepped onto the train, but figured I was fine since I was already on the steps up. Until, that is, the door began to close, with me in the doorway, suitcase in the train, one foot inside, and one foot mid step up to the cabin. The door closed on my backpack (which was still on my back), but I managed to force it into the train compartment. My shoe, however, was not quite as lucky. Part of my shoe made it inside, and part was outside the door.
No worry– just look for the door release mechanism, right? Wrong! There was none. The train started up, with my shoe still halfway in and halfway out of the train. (Luckily my foot itself made it inside all in one piece). The conductor came along to scold me, and told me that he could *probably* rescue my shoe once we got to Central Station. In the meantime, I sat on a nearby jump seat, keeping tabs on my shoe and fuming that this was *not* the way I planned to start my vacation. Long story short– the train conductor was able to salvage my shoe, but not without a lot of commentary on how I should never have boarded the train after the whistle blew. Lesson learned.
Read the court decisionRead the full story...Reprinted courtesy of
Melissa Dewey Brumback, Ragsdale Liggett PLLCMs. Brumback may be contacted at
mbrumback@rl-law.com
Builders Beware: A New Class Of Defendants In Asbestos Lawsuits
January 06, 2016 —
David J. Byassee, Bremer Whyte Brown & O’Meara, LLP & Timothy A. Gravitt, Ulich, Ganion, Balmuth, Fisher & Feld, LLPResidential, commercial and industrial builders face new and potentially significant liability for construction activities that took place in the 1960s, 1970s and 1980s: personal injury lawsuits filed by construction workers from exposure to building products containing asbestos. After emptying the pockets of manufacturers and suppliers of raw asbestos and asbestos-containing products over the last 20 years, plaintiff lawyers are beginning to set their sights on a new class of defendants in asbestos litigation: residential, commercial and industrial builders who unknowingly allowed asbestos-containing products to be incorporated into their projects.
The men and women who have been involved in the building industry for 40 years or more may remember the subject of asbestos surfacing in the 1970s with the enactment of the Occupational Safety and Health Act (OSHA). At that point builders were just beginning to learn that asbestos was a component of some building materials, and the potential risk of cancer presented by asbestos was being debated in scientific and medical journals. Although the use of building materials containing asbestos was mostly phased out by the 1980s, the health risks associated with exposure to asbestos continue – and in fact increase – for the duration of an exposed person’s life.
Today it is generally accepted that exposure to asbestos increases the risk of developing asbestosis and certain kinds of cancer, including mesothelioma. Cancers associated with exposure to asbestos are typically diagnosed at least 15 years (and sometimes up to 50 years) after a person’s exposure to asbestos, meaning that exposures in the 1960s, 1970s and 1980s might not manifest in disease until now. The class of persons who may be at risk for asbestos-related disease is long and varied: insulators, HVAC installers, pipe fitters, plumbers, drywall installers, painters, plasterers and roofers, to name a few. Long-term exposure history, coupled with the theory that “each and every” exposure during a lifetime is a substantial factor increasing the risk of developing cancer, presents potential liability to builders acting as general contractors and/or property owners, as well as the usual defendants in asbestos lawsuits, which include manufacturers, suppliers, and users of asbestos-containing materials.
In recent years, plaintiff lawyers have set their sights on builders as the financial wherewithal of traditional asbestos defendants has dried up. Plaintiff lawyers have created a new theory of liability which they use to rope builders in as defendants in asbestos lawsuits: that the builder knew – or should have known – that a deadly ingredient (asbestos) was contained in the building materials used in construction, and the builder failed to warn its subcontractors or anyone else on the project that exposure to asbestos could harm them.
Builders have unique legal defenses to claims brought by employees of subcontractors who have developed asbestos-related disease. For example, the California Supreme Court in Privette v. Superior Court (1993) 5 Cal.4th 689, held that an injured employee of a subcontractor cannot maintain a claim against the hirer (builder) for the employee’s injury absent affirmative contribution on the part of the builder to the injury. Thus the first line of defense in an asbestos exposure case is to argue that the developer had no direct role in the plaintiff’s exposure to asbestos and therefore the Privette doctrine precludes the plaintiff from suing the builder. But resourceful plaintiff lawyers are coming up with arguments to get around this so-called Privette defense in asbestos lawsuits by claiming that builders’ activities such as cleanup of asbestos-containing materials, or assertion of control over the work of the subcontractor, directly contributed to the plaintiff’s injuries and therefore provide exceptions to Privette and allow the claim to proceed.
A practical question is raised in asbestos cases: How is a plaintiff able to prove, decades after working on a project, what building materials contained asbestos, or that a builder knew or should have known in the 1960s, 1970s or 1980s that asbestos-containing materials were used on their project, or that asbestos presented a health risk? To answer the first part of the question (what building materials contained asbestos), plaintiff’s experts will say that during the relevant timeframe asbestos was a common ingredient in many building products, e.g., drywall joint compounds, stucco/plaster/gun cement, acoustic ceiling products, cement pipe, insulation, roofing mastic, caulk and plumber’s putty; this can be further proven by reference to product manufacturers’ disclosures made pursuant to the Asbestos Information Act. Also, through the decades of asbestos litigation against product manufacturers and suppliers, resourceful plaintiff lawyers have developed vast banks of data and documentation identifying the manufacturers of asbestos-containing building products, the end-users of those products, and the projects where those products were supplied. With this bank of knowledge, all that is necessary for them to make the claim against a builder is to have the plaintiff identify a construction project where he or she remembers working during the relevant timeframe. Once that identification is made, it is a simple matter for the lawyers to dig and find out who developed the building/project, who then becomes a defendant in an asbestos lawsuit.
The answer to the second part of the question (whether the developer knew or should have known that the products brought to their projects contained asbestos) requires a detailed investigation into the dates at which the products were supplied to the project, the manufacturer of the product, and what information was available in the market place about the material content of the particular product.
The answer to the third part of the question (knowledge that asbestos presented a health risk) is trickier. One of the first standards set by OSHA in 1972 related to permissible levels of exposure to asbestos. It is a common tactic for plaintiff lawyers to argue that the existence of OSHA standards created a presumption of knowledge in the building industry about the dangers of asbestos. But what about pre-OSHA knowledge? Here plaintiff lawyers will argue that well before OSHA, going back as far as 1936, exposure to asbestos was regulated in California under General Industry Safety Orders relating to Dusts, Fumes, Mists, Vapors and Gases. They argue that the General Industry Safety Orders put builders “on notice” of the dangers of asbestos by virtue of being regulated by the State of California, and, by extension, builders had “knowledge” of the health risks associated with asbestos.
There are defenses that skilled defense counsel can utilize to defeat asbestos claims, assuming the Privette defense is not available. The first is to thoroughly investigate and evaluate all of the plaintiff’s potential exposures to asbestos throughout his entire lifetime, and identify those sources that likely were the major contributors to his disease. Next, counsel has to properly investigate the project at which the plaintiff is alleged to have been exposed to asbestos, identify all of the possible sources of exposure, i.e., the products that were used or might have been used at the project, and finally how the plaintiff was allegedly exposed at the project. As most builders do not maintain records of what products were used in their projects dating back 15 years or more, let alone the identities of the trades that worked on the projects, knowledgeable defense counsel can be a valuable partner in unearthing the brands of products typically in use in the locale where the construction took place, and identifying the manufacturers of those products. Defense counsel must analyze the frequency, duration, proximity and intensity of the exposure, as well as the type of asbestos the plaintiff was allegedly exposed to (not all asbestos is created equal – some types are more toxic than others). This will involve careful evaluation of the levels of exposure created by the alleged activity of the builder, to determine, through experts and a thorough understanding of the scientific and medical studies on the subject, whether the levels of asbestos exposure created by the activity could be considered a “substantial factor” in contributing to the risk of the plaintiff’s development of his asbestos-related disease.
Asbestos lawsuits present a significant risk to the unsuspecting and unprepared builder. Money damages available to a plaintiff are substantial. Medical expenses for treatment of asbestos-related disease typically run into the hundreds of thousands of dollars, lost income (including retirement benefits) can also be significant, and jury awards for pain, suffering and emotional distress can be staggering - often millions of dollars. In some cases punitive damages are even awarded.
The bottom line is that a builder runs a big risk if it treats an asbestos claim like any other claim. The level of analysis and investigation to properly defend against the claim requires prompt action by knowledgeable counsel, and frequently there is no insurance coverage.
David J. Byassee is an attorney with the firm
Bremer Whyte Brown & O’Meara, LLP, and is a litigator who has devoted nearly a decade to representation of real estate developers and builders. He can be reached at: dbyassee@bremerwhyte.com.
Timothy A. Gravitt is an attorney with the firm
Ulich, Ganion, Balmuth, Fisher & Feld, LLP who is devoted to defending real estate developers and builders in a variety of litigation. He can be reached at: tgravitt@ulichlaw.com.
Read the court decisionRead the full story...Reprinted courtesy of
Insuring Lease/Leaseback Projects
August 19, 2024 —
David G. Jordan & Jeffrey J. Vita - Saxe Doernberger & Vita, P.C.Overview
Several states utilize a unique statutory mechanism to allow school districts to finance the construction of public-school facilities. This arrangement (known as a “lease-leaseback agreement”) allows a school district to lease property to a contractor/developer, who then constructs or renovates a school facility on the property. Once the work is completed, the contractor/developer leases the school building back to the school district. The school district then makes lease payments over time, often many years, which can be structured in various ways to spread out the cost of construction. The arrangement typically requires a site lease for the land leased to the contractor/developer, a facilities lease for the lease-back of the school building to the school district and a traditional construction agreement. In some ways, the arrangement resembles a Public-Private Partnership (PPP) whereby a public entity collaborates with a private entity for the purpose of financing and delivering a project traditionally provided solely by the public sector.
Reprinted courtesy of
David G. Jordan, Saxe Doernberger & Vita, P.C. and
Jeffrey J. Vita, Saxe Doernberger & Vita, P.C.
Mr. Jordan may be contacted at DJordan@sdvlaw.com
Mr. Vita may be contacted at JVita@sdvlaw.com
Read the court decisionRead the full story...Reprinted courtesy of
Congratulations to BWB&O’s Los Angeles Office on Another Successful MSJ!
July 11, 2022 —
Dolores Montoya - Bremer Whyte Brown & O'Meara LLPBremer Whyte Brown & O’Meara, LLP is proud to announce Partner Daniel Crespo and Associate Stefon Jackson successfully argued and won a Motion for Summary Judgment (“MSJ”) for our client, a property owner of an apartment complex.
Plaintiff was involved in a physical altercation with one of the tenants at an apartment complex owned by our client. Plaintiff alleged that our client had notice of a propensity for violence claiming that there were prior instances of contentious interactions between this particular tenant and Plaintiff. As a result, Plaintiff alleged that our client had a duty to prevent further interactions between Plaintiff and the tenant presuming that an act of physical violence was reasonably foreseeable.
Read the court decisionRead the full story...Reprinted courtesy of
Dolores Montoya, Bremer Whyte Brown & O'Meara LLP
2022 Project of the Year: Linking Los Angeles
May 01, 2023 —
Aileen Cho - Engineering News-RecordThe 2023 Oscar awards featured a Best Actor and Best Supporting Actor who reinvented themselves and came back for a second act. The tunnel-boring machine Angeli is the LA performer who did much the same, but entirely underground.
Reprinted courtesy of
Aileen Cho, Engineering News-Record
Ms. Cho may be contacted at choa@enr.com
Read the full story... Read the court decisionRead the full story...Reprinted courtesy of
Enforceability of Contract Provisions Extending Liquidated Damages Beyond Substantial Completion
April 15, 2024 —
Stu Richeson - The Dispute ResolverThis post takes a look at the enforceability of contract provisions providing for liquidated delay damages after substantial completion. Typically, the assessment of liquidated delay damages ends at substantial completion of a project. However, various standard form contracts, including some of the ConsensusDocs and EJCDC contracts, contain elections allowing for the parties to agree on the use of liquidated damages for failing to achieve substantial completion, final completion, or project milestones. The standard language in the AIA A201 leaves it up to the parties to define the circumstances under which liquidated damages will be awarded.
Courts are split on the enforceability of provisions that seek to assess liquidated damages beyond substantial completions. Courts in some jurisdictions will not impose liquidated damages after the date of substantial completion on the ground that liquidated damages would otherwise become a penalty if assessed after the owner has put the project to its intended use. Perini Corp. v. Greate Bay Hotel & Casino, Inc., 129 N.J. 479, 610 A.2d 364 (1992). When the terms are clear, other jurisdictions will enforce contract terms providing for liquidated damages until final completion, even if the owner has taken beneficial use of the facility. Carrothers Const. Co. v. City of S. Hutchinson, 288 Kan. 743, 207 P.3d 231 (2009).
Read the court decisionRead the full story...Reprinted courtesy of
Stu Richeson, PhelpsMr. Richeson may be contacted at
stuart.richeson@phelps.com
“Good Faith” May Not Be Good Enough: California Supreme Court to Decide When General Contractors Can Withhold Retention
March 22, 2018 —
Erinn Contreras and Joy O. Siu – Construction & Infrastructure Law BlogIt is industry standard in California for owners of a construction project to make monthly payments to a contractor for work it has completed, less a certain percentage that is withheld as a guarantee of future satisfactory performance. This withholding is called a retention. Contractors generally pass these withholdings on to their subcontractors via a retention clause in the subcontract. Under such clause, if a subcontractor fails to complete its work or correct deficiencies in its work, the owner and the general contractor may use the retention to bring the subcontractor’s work into conformance with the requirements of the contract.
When and how retention payments must be released are governed by, among other statutes, Civil Code section 8800
et seq. Specifically, Civil Code section 8814, subdivision (a), states that a direct contractor must pay each subcontractor its share of a retention payment within ten days after the general contractor receives all or part of a retention payment. Failure to make payments in accordance with Section 8814 can subject an owner or a contractor to a (1) two percent penalty per a month on the amount wrongfully withheld, and (2) claim for attorney’s fees for any litigation required to collect the wrongfully withheld retention payments. (Civ. Code, § 8818.)
Reprinted courtesy of
Erinn Contreras, Sheppard, Mullin, Richter & Hampton LLP and
Joy Siu, Sheppard, Mullin, Richter & Hampton LLP
Ms. Contreras may be contacted at econtreras@sheppardmullin.com
Ms. Siu may be contacted at jsiu@sheppardmullin.com
Read the court decisionRead the full story...Reprinted courtesy of