Insurance Policy Provides No Coverage For Slab Collapse in Vision One
August 17, 2011 —
Douglas Reiser, Builders Council BlogThis post will examine whether Division Two of the Washington Court of Appeals properly reversed and remanded several lower court decisions in the case of Vision One LLC v. Philadelphia Indemnity Insurance. In short, and from the perspective of an appellate attorney, the court of appeals got the decision right. Given the rules of contract interpretation and causation in tort claims, there was really no other way the court could have ruled. I understand that from a contractor’s perspective and insurance perspective, the decision seems odd. But from a purely legal standpoint, the decision is well-reasoned and well-supported. Let me explain.
Background
First, here are the facts in a nutshell. Vision One is a construction company that undertook to construct a condo complex in Tacoma. Vision then contracted with D&D Concrete to pour a concrete slab for a section of the foundation. To shore the concrete slab, D&D further contracted Berg Equipment to provide necessary equipment to stabilize the structure. Well, something down the line went wrong. The shoring failed and the slab collapsed, causing a great deal of damage.
Read the full story…
Read the court’s decision…
Reprinted courtesy of Douglas Reiser of Reiser Legal LLC. Mr. Reiser can be contacted at info@reiserlegal.com
Read the court decisionRead the full story...Reprinted courtesy of
Insurance Law Alert: Incorporation of Defective Work Does Not Result in Covered Property Damage in California Construction Claims
June 18, 2014 —
Valerie A. Moore and Chris Kendrick - Haight Brown & Bonesteel LLPIn Regional Steel Corp. v. Liberty Surplus Ins. (No. B245961, filed 5/16/14, ord. pub. 6/13/14), a California appeals court held that the insured's use of the wrong steel seismic reinforcement hooks in construction of a mixed-use building was not an occurrence, and did not result in covered property damage.
Regional Steel was the structural steel subcontractor on a 14-story mixed-use project in North Hollywood, California. Regional supplied plans which were approved by the developer and its structural engineers for installation of steel reinforcements, including seismic reinforcement hooks, to be encased in concrete. During construction, City inspectors determined that the plans called for the wrong hooks, necessitating repairs to finished portions of the work and delays in further construction. This ultimately resulted in a lawsuit between the developer, Regional Steel, the concrete subcontractor, the structural engineer and a quality assurance inspector.
The project was insured under a wrap policy issued to the developer, with Regional named as an additional insured. The court rejected an argument that the wrap endorsement fundamentally changed the insurance, and the issue boiled down to whether incorporation of the wrong hooks, the damage caused by tearing out concrete to replace the hooks, or the resulting loss of use, triggered coverage. Liberty asserted that no damage to property was alleged and the purely economic losses caused by the need to reopen the poured concrete to correct the tie hook problem did not constitute "property damage" within the meaning of the policy. Liberty further posited that the tie hook problem did not constitute an “occurrence” within the meaning of the policy because the alleged damage was not caused by an accident.
Reprinted courtesy of
Valerie A. Moore, Haight Brown & Bonesteel LLP and
Chris Kendrick, Haight Brown & Bonesteel LLP Read the court decisionRead the full story...Reprinted courtesy of
Evaluating Construction Trends From 2023 and Forecasting For 2024
February 12, 2024 —
Jason Feld & Dominic Donato - Kahana FeldAs we begin 2024, it is informative to evaluate what transpired in 2023 in the construction industry, and especially the use of construction technology. 2023 ushered in a variety of newly implemented construction technologies including 3D printed entire houses, improved wearables that detect all aspects of the construction worker from location to temperature to heart rate, increased use of modular construction for entire apartments, hotels, and condominium projects, and eco-friendly and conservation minded technologies to minimize carbon footprint, water preservation and sustainable construction methods, to name a few.
2023 also identified some significant issues in the construction industry. First and foremost, the labor shortages and hiring of skilled and qualified workers continued to be an issue resulting in increased delays, construction accidents, and project mismanagement. The skyrocketing interest rates, decline in commercial/office projects, supply chain issues, material price fluctuation and increase changes in scope of projects all negatively impacted the construction industry in 2023. There is also the demand for renewable and infrastructure projects put strain on construction resources as the projects became “mega” with larger and more complex construction leading to multi-party, high dollar, and more complex claims. Finally, there is a growing trend of construction claims and litigation being financed by third party litigation funding sources for personal/bodily injury claims and construction defect claims.
Reprinted courtesy of
Jason Feld, Kahana Feld and
Dominic Donato, Kahana Feld
Mr. Feld may be contacted at jfeld@kahanafeld.com
Mr. Donato may be contacted at ddonato@kahanafeld.com
Read the court decisionRead the full story...Reprinted courtesy of
Firm Sued for Stopping Construction in Indiana Wants Case Tried in Germany
October 16, 2013 —
CDJ STAFFGetrag Transmission, a German firm, is being sued by a Detroit-based construction firm that Getrag had hired to build a factory in Indiana. When a court gave the go-ahead to Walbridge Construction for the suit, Getrag appealed, stating that the case should be held in German so that Getrag officials do not have the expense of traveling to Indiana.
Getrag was building the plant, which would have cost $350 million, as part of a partnership with Chrysler. Chrysler dropped from the project after filing for bankruptcy. Shortly afterward, Getrag also filed for bankruptcy.
Walbridge is seeking $118.5 million due to expenses incurred with subcontractors. Chrysler has announced its intention of finishing the plant, which they estimate will cost about $162 million. Once complete, the plant will employ about 850 workers.
Read the court decisionRead the full story...Reprinted courtesy of
Tips for Contractors Who Want to Help Rebuild After the California Wildfires
November 02, 2017 —
Garret Murai - California Construction Law BlogI received a call from one of my contractor clients this past week to see what he could do to help those affected by California’s North Bay fires.
The North Bay fires are the deadliest and most destructive wildfires in California’s history. To date, the fires have claimed 42 lives, burned more than 200,000 acres of land, destroyed an estimated 8,400 structures and likely damaged tens of thousands more. By comparison, the state’s second most deadly wildfire, the Oakland Hills fire of 1991, claimed the lives of 25 people, burned 1,600 acres of land, and destroyed 2,900 structures. Rebuilding costs for the North Bay fires, according to the California Insurance Commissioner, are expected to top $1 billion.
For those with insurance, insurance experts say that the rebuilding process can take two years or more for those whose homes and businesses were destroyed. For those whose homes and businesses were fortunate enough only to be damaged, rebuilding efforts are already underway.
Read the court decisionRead the full story...Reprinted courtesy of
Garret Murai, Wendel Rosen Black & Dean LLPMr. Murai may be contacted at
gmurai@wendel.com
California Supreme Court Upholds Precondemnation Procedures
September 22, 2016 —
Patrick J. Paul – Snell & Wilmer Real Estate Litigation BlogOn July 21, 2016, the California Supreme Court in Property Reserve v. Superior Court upheld the state’s precondemnation entry and testing statutes provided they were reformed to allow impacted property owners the ability to have a jury trial to determine damages associated with such entry and testing.
The California Department of Water Resources (DWR) sought to construct water conveyance facilities that would require significant property condemnation. As part of this process, DWR further sought to investigate the environmental and geological suitability of more than 150 private properties considered for the conveyance route.
Read the court decisionRead the full story...Reprinted courtesy of
Patrick J. Paul, Snell & Wilmer Mr. Paul may be contacted at
ppaul@swlaw.com
Fifth Circuit Finds Duty to Defend Construction Defect Case
March 14, 2022 —
Tred R. Eyerly - Insurance Law HawaiiReversing the judgment of the district court, the Fifth Circuit found the insurer owed a defense in a construction defect case. Siplast, Inc. v. Emplrs Mut. Cas. Co., 2022 U.S. App. LEXIS 795 (5th Cir. Jan. 11, 2022).
The Archdiocese of New York sued various parties for a roofing project at a high school in the Bronx. Siplast, the roofing manufacturer, was included as a defendant. The underlying lawsuit arose from the Archdiocese purchase of a roof membrane system from Siplast. Siplast guaranteed that the roof membrane system would remain "in a watertight condition for a period of 20 years . . . or Siplast will repair the Roof Membrane System at its own expense."
After installation of the roof, school officials noticed water damage in the ceiling tiles throughout the school after a rain storm. Siplast attempted to repair the damage, but was unsuccessful. Siplast later informed the Archdiocese that the guarantee would not be honored regarding any permanent improvements of the roof. The Archdiocese filed suit against Siplast and the installing contractor. The cause of action against Siplast was for breach of the guarantee.
Read the court decisionRead the full story...Reprinted courtesy of
Tred R. Eyerly, Damon Key Leong Kupchak HastertMr. Eyerly may be contacted at
te@hawaiilawyer.com
The Argument for Solar Power
July 09, 2014 —
Beverley BevenFlorez-CDJ STAFFJennifer Goodman in Big Builder provides eight reasons why buyers should opt for solar power. First on her list is “Codes.” Goodman pointed out that beginning in 2020, “California’s Title 24 will require all new residential construction to be net-zero energy, which means that they will need renewable energy systems in order to generate as much power as they consume.”
Other reasons include incentives, aesthetics, appraisal/lending standards, payback, legislation, cost, and finally, “clean, quiet, and abundant power.” Goodman stated that the “technology generates no noise or off gassing and because solar power is generated from sunlight--not heat--even residents in the northern U.S. are able to take advantage of it.”
Read the court decisionRead the full story...Reprinted courtesy of