Insurer's Late Notice Defense Fails on Summary Judgment
December 13, 2021 —
Tred R. Eyerly - Insurance Law HawaiiThe insurer's motion for summary judgment to dismiss the claim because the insurer did not provide notice "as soon as practicable" was denied. Vintage Hospitality Group LLC v. Nat'l Trust Ins. Co., 2021 U.S. Dist. LEXIS 192651 (M.D. Ga. Oct. 6, 2021).
Vintage owned hotels, one of which was struck by a severe hailstorm on July 21, 2018. Vintage was not aware of roof damage until two months after the storm, and did not make the connection between the hailstorm and roof damage until February 2020, when it reported the damage to National. The claim was denied because it was not reported "as soon as practicable" as required by the policy.
Vintage sued and National moved for summary judgment.
Vintage did not notice the leaks until September 2018. The focus was on fixing the leaks, and connection to the hailstorm did not register. The leaks persisted over the next year and a half. A construction company was called in to evaluate the leaking roof. The construction company advised that the roof had experienced previous hail damage which was causing the leaks. At this point, Vintage connected the damage to the hailstorm. A claim was promptly submitted to National, which denied the claim.
Read the court decisionRead the full story...Reprinted courtesy of
Tred R. Eyerly, Damon Key Leong Kupchak HastertMr. Eyerly may be contacted at
te@hawaiilawyer.com
Top Talked-About Tech at the 2023 ABC Joint Tech Summit
May 15, 2023 —
Grace Arnold - Construction ExecutiveAt the
2023 ABC Joint Tech Summit in Tysons Corner, Virginia, on April 27, there was talk, of course, of various construction technologies, including AI, VR, autonomous vehicles, impairment detection, digital twins, blockchains and Spot the Robot Dog. All this different tech, however, was discussed for the same two reasons: safety and efficiency.
While some companies are just discovering the vast uses for and benefits of smart technology in construction, other companies are already well into adoption and implementation. Here is a breakdown of some of the contech showcased at the Joint Tech Summit, which was presented by four ABC chapters: Chesapeake Shores, Greater Baltimore, Metro Washington and Virginia.
AUTONOMOUS MACHINES
The talk of the Tech Summit was Spot the Robot Dog from
Boston Dynamics. Spot can walk, run, crawl, climb stairs and tortuous terrain, right itself from a fall, return to its charging port when its battery runs low and is compatible with a variety of add-ons, like 360 cameras. Spot is controlled via tablet and can be programmed to run on its own, allowing for increased worker and jobsite safety and productivity.
Reprinted courtesy of
Grace Arnold, Construction Executive, a publication of Associated Builders and Contractors. All rights reserved.
Read the court decisionRead the full story...Reprinted courtesy of
The Moving Finish Line: Statutes of Limitation and Repose Are Not Always What They Seem
June 01, 2020 —
Kenneth E. Rubinstein & Nathan Fennessy - Construction ExecutiveHaving an end date for risk is important to construction professionals who need to know when they can close their books and destroy files relating to old projects. While professionals typically look to the statute of limitations and repose, these deadlines can sometimes be harder to determine than one might think.
State Laws Prohibiting Alteration of Statutes of Limitation
Many contractors seek to control the extent of their risk by negotiating the length of their liability period. In some instances, contractors may seek to shorten the statute of limitations to protect against stale claims. While in other instances, owners periodically negotiate for longer periods to ensure that they will not be time barred from pursuing valid claims. While the majority of states enforce such contractual provision, a number of states hold such clauses unenforceable. In these instances, the state’s original statute of limitations will apply regardless of what the contract says.
Reprinted courtesy of
Kenneth E. Rubinstein & Nathan Fennessy, Construction Executive, a publication of Associated Builders and Contractors. All rights reserved.
Mr. Rubenstein may be contacted at krubinstein@preti.com
Mr. Fennessy may be contacted at nfennessy@Preti.com
Read the court decisionRead the full story...Reprinted courtesy of
Meet the Forum's ADR Neutrals: LISA D. LOVE
March 19, 2024 —
Marissa L. Downs - The Dispute ResolverCompany: JAMS
Office Location: New York, NY
Email: llove@jamsadr.com
Website: https://www.jamsadr.com/love/
Law School: Georgetown University Law Center (J.D. 1984)
Types of ADR services offered: Arbitration, mediation, neutral evaluation and special master services
Affiliated ADR organizations: JAMS, Chartered Institute of Arbitrators, and CPR
Geographic area served: Domestic and International
Q: Describe the path you took to becoming an ADR neutral.
A: I started my legal career practicing law as a complex commercial transactions attorney in the corporate department of a major New York law firm for eleven years. After leaving the firm, I served as chief legal counsel to several municipalities and as co-founding partner of a boutique finance, infrastructure and real estate law firm.
Read the court decisionRead the full story...Reprinted courtesy of
Marissa L. Downs, Laurie & Brennan, LLPMs. Downs may be contacted at
mdowns@lauriebrennan.com
New Addition to the ASCE/SEI 7-22 Standard Protects Buildings from a 500-year Flood Event
June 05, 2023 —
The American Society of Civil EngineersReston, VA — The
American Society of Civil Engineers (ASCE) released a new update to their most widely used standard today,
ASCE/SEI 7-22 Minimum Design Loads and Associated Criteria for Building and Other Structures. As the increasing frequency of severe storms puts strain on communities across the globe, the design standard's
new flood load provisions will protect against 500-year flood events, which is a significant improvement to the 100-year flood hazard referenced in the previous version. The update — which is available in a supplement as a free download — is a significant revision of the design provisions in Chapter 5 to strengthen building resilience against the flood hazard. The ASCE 7 national loading standard is an integral part of building codes in the United States and around the globe.
"For more than 30 years, the ASCE 7 standard has been the authoritative source for the specification of minimum design loads and related criteria in the civil engineering community," said Tom Smith, ASCE Executive Director. "To ensure structures continue to be safe for the public, it is imperative that the standards we rely on are updated to account for emerging risks to the built environment. This Supplement is the most significant change to the standard's flood load provisions since the inception of ASCE 7 and will improve the safety and reliability of structures across the globe."
ABOUT THE AMERICAN SOCIETY OF CIVIL ENGINEERS
Founded in 1852, the American Society of Civil Engineers represents more than 150,000 civil engineers worldwide and is America's oldest national engineering society. ASCE works to raise awareness of the need to maintain and modernize the nation's infrastructure using sustainable and resilient practices, advocates for increasing and optimizing investment in infrastructure, and improve engineering knowledge and competency. For more information, visit www.asce.org or www.infrastructurereportcard.org and follow us on Twitter, @ASCETweets and @ASCEGovRel.
Read the court decisionRead the full story...Reprinted courtesy of
Ten Firm Members Recognized as Super Lawyers or Rising Stars
July 13, 2017 —
Ceslie Blass - Ahlers & Cressman PLLCWhile we avoid using this blog as a platform for self-promotion, we recently received share-worthy distinctions, which both flatter and humble us. We invite you, our loyal readers, to celebrate in our success, which in great measure is due to you.
John P. Ahlers, one of the firm's founding partners, was ranked third overall across all practicing industries in Washington 2017 Super Lawyers and founding partner Paul R. Cressman, Jr. was ranked in the Top 100. The following other firm members were also recognized as Super Lawyers: Founding partner Scott R. Sleight, Bruce A. Cohen (Partner), Brett M. Hill (Partner), and Lawrence Glosser (Partner). In addition, Ryan W. Sternoff (Partner), James R. Lynch (Partner), Tymon Berger (Associate), and Lindsay (Taft) Watkins (Associate) were selected as Super Lawyers Rising Stars. Over half of the firm's lawyers received Super Lawyers distinction.
Super Lawyers selects attorneys using a patented multiphase selection process. Peer nominations and evaluations are combined with third party research. Each attorney candidate is evaluated on 12 indicators of peer recognition and professional achievement. Only five percent of the total lawyers in Washington State are selected for the honor of Super Lawyers and no more than 2.5 percent are selected for the honor of Super Lawyers Rising Stars.
Read the court decisionRead the full story...Reprinted courtesy of
Ceslie Blass, Ahlers & Cressman PLLCMs. Blass may be contacted at
cblass@ac-lawyers.com
Do Change Orders Need to be in Writing and Other Things That Might Surprise You
June 02, 2016 —
Garret Murai – California Construction Law BlogYou’ve likely heard it before or maybe you’ve even said it yourself: “Go ahead and get started, we’ll get you a change order later.”
The only thing is, “later” never happens, and after you’ve finished performing the work you find yourself in a fight over whether you’re entitled to get paid for the work you performed.
So, do you need a written change order to get paid for extra work you performed? Read on, you may be surprised.
Read the court decisionRead the full story...Reprinted courtesy of
Garret Murai, Wendel Rosen Black & Dean LLPMr. Murai may be contacted at
gmurai@wendel.com
Requesting an Allocation Between Covered and Non-Covered Damages? [Do] Think Twice, It’s [Not Always] All Right.
October 12, 2020 —
Todd Likman - Colorado Construction LitigationAs is often the case in construction defect and other insurance defense litigation, a plaintiff’s claims for relief typically encompass both covered and uncovered damages. Obviously, it is in the insured’s best interests to have as many damages covered by insurance as possible. From the insurer’s perspective and against the backdrop of owing duty of good faith and fair dealing to its insureds, however, it is generally better to have an allocation of covered vs. non-covered damages. This places the insurer, insured, and insurance retained defense counsel in a difficult position.
A recent opinion from U.S. District Court for the District of Colorado, Rockhill Ins. Co. v. CFI-Global Fisheries Mgmt, Civil Action No. 1:16-CV-02760-RM-MJW, 2020 U.S. Dist. LEXIS 35209 (D. Colo. Mar. 2, 2020), sheds light on the issue, even though some may feel it only further muddies already murky waters.
Rockhill involved review of an arbitration proceeding that property-owner, Heirloom I, LLC (“Heirloom”) filed against CFI-Global Fisheries Management (“CFI”). Rockhill Insurance Company (“Rockhill Insurance”) was asked to defend the arbitration as CFI’s professional and general liability insurer. At issue in the arbitration was Heirloom’s claim that CFI defectively designed and constructed a fisheries enhancement that was destroyed by natural processes four times in three years.
Read the court decisionRead the full story...Reprinted courtesy of