Big Builder’s Analysis of the Top Ten Richest Counties
June 26, 2014 —
Beverley BevenFlorez-CDJ STAFFBig Builder took Forbes’ 2014 top ten richest U.S. counties list (based on household median income) and researched who the top builders were in those regions, buyer requirements, among other categories. The top three richest counties according to Forbes and Big Builder are Falls Church, Virginia; Loudoun County, Virginia; and Los Alamos County, New Mexico.
Information listed for each county include the median-closing price, price per square foot, living square feet, top builders, and an examination of what makes each region unique.
Read the court decisionRead the full story...Reprinted courtesy of
New Green Standards; Same Green Warnings for Architects & Engineers (law note)
January 13, 2014 —
Melissa Dewey Brumback - Construction Law in North CarolinaThe newest version of the LEED ratings system, LEED v4, has officially been released. For a comparison of the major changes between LEED 2009 and LEEDv4, check out this downloadable form from the USGBC.
As the folks at Schinnerer’s pointed out, there is one major change that is fraught with peril for design professionals– the requirement for increased transparency concerning the composition and performance requirements of composition materials.
Notes the insurance carrier:
“While design firms always had a level of responsibility for ongoing product research, the lack of standardized, affirmative industry data made it difficult for design firms and project owners to assess the impact of building materials on human health.
“As with many aspects of sustainability in design and construction, the danger to design firms is likely to come from self-inflicted perils. When a firm accepts responsibility to ‘ensure that a project meets its goals by using the best products that align with project requirements,’ it is essentially giving the project owner a guarantee that is both beyond the firm’s control and uninsurable by any insurance carried by a firm.”
Read the court decisionRead the full story...Reprinted courtesy of
Melissa Dewey BrumbackMs. Brumback can be contacted at
mbrumback@rl-law.com
Owners Should Serve Request for Sworn Statement of Account on Lienor
August 10, 2017 —
David Adelstein - Florida Construction Legal UpdatesWhen an owner receives a construction lien, an owner should serve the lienor with a Request for Sworn Statement of Account. The Request for Sworn Statement is authorized by Florida Statute s. 713.16(2) and should be in the following form:
REQUEST FOR SWORN STATEMENT OF ACCOUNT
WARNING: YOUR FAILURE TO FURNISH THE REQUESTED STATEMENT, SIGNED UNDER OATH, WITHIN 30 DAYS OR THE FURNISHING OF A FALSE STATEMENT WILL RESULT IN THE LOSS OF YOUR LIEN.
To: (Lienor’s name and address)
The undersigned hereby demands a written statement under oath of his or her account showing the nature of the labor or services performed and to be performed, if any, the materials furnished, the materials to be furnished, if known, the amount paid on account to date, the amount due, and the amount to become due, if known, as of the date of the statement for the improvement of real property identified as (property description) .
(name of contractor)
(name of the lienor’s customer, as set forth in the lienor’s Notice to Owner, if such notice has been served)
(signature and address of owner)
(date of request for sworn statement of account)
From both an owner and lienor’s perspective, the bolded, capitalized language is key. It states that if the lienor fails to respond under oath within 30 days, it will LOSE its lien. That is a very punitive measure for a lienor’s failure to respond, meaning a lienor should absolutely respond, no questions asked. Plus, a lienor’s response to a Request for Sworn Statement of Account is not a burdensome ordeal.
Read the court decisionRead the full story...Reprinted courtesy of
David Adelstein, Florida Construction Legal UpdatesMr. Adelstein may be contacted at
Dadelstein@gmail.com
Make Your Business Great Again: Steven Cvitanovic Authors Construction Today Article
April 20, 2017 —
Steven M. Cvitanovic - Haight Brown & Bonesteel LLPThere is a lot of uncertainty regarding how President Trump’s immigration and trade policies will affect the construction industry. In his Construction Today article, Partner Steven Cvitanovic discusses how businesses can remain competitive and profitable during this period of uncertainty, including updating contract documents, recruiting and retaining employees, and increasing cybersecurity efforts.
“If you do not know when your contract documents were last updated, it’s probably been too long,” writes Cvitanovic. “Unlike wine, contract documents only get worse with age.” Cvitanovic advises teams to sit down together and review contracts to see if they still meet the firm’s needs.
Read the court decisionRead the full story...Reprinted courtesy of
Steven M. Cvitanovic, Haight Brown & Bonesteel LLPMr. Cvitanovic may be contacted at
scvitanovic@hbblaw.com
Terminating A Subcontractor Or Sub-Tier Contractor—Not So Fast—Read Your Contract!
May 24, 2018 —
John P. Ahlers - Ahlers Cressman & Sleight PLLC BlogEvery few months I receive a call from a general contractor or subcontractor who has just terminated a subcontractor or sub-tier contractor for non-performance and is “checking in with me to see if there are any liability issues.” After the termination has taken place, if the termination is wrongful, there are serious legal consequences. Calling your lawyer after the fact will not cure missteps in the termination process. Termination for non-performance is a common term in most contract documents. As courts interpret contracts, however, the right to earn revenue from a contract is a substantial interest, and courts generally “abhor” forfeitures (termination) of that right. In other words, the courts will strictly determine whether the terminating party to a contract has complied with the termination process to the letter. A recent example from Connecticut is instructive in this regard. [1]
The general contractor on a large hospital project in Connecticut terminated its electrical subcontractor, hired others to finish the electrical subcontractor’s work, and then sued the electrical subcontractor for $26 million. The electrical subcontractor countersued the general contractor for $3.6 million of work that it had completed at the time of the termination which had not been paid for. The subcontractor claimed that due to the many changes that had occurred on the project, it stopped work because the changes altered the contract to the point that it was no longer the same contract. The subcontractor walked off the project and the general contractor then terminated the subcontractor and re-procured the work from other subcontractors.
Read the court decisionRead the full story...Reprinted courtesy of
John P. Ahlers, Ahlers Cressman & Sleight PLLCMr. Ahlers may be contacted at
john.ahlers@acslawyers.com
The EPA and the Corps of Engineers Propose Another Revised Definition of “Waters of the United States”
February 14, 2022 —
Anthony B. Cavender - Gravel2GavelOn December 7, 2021, the most recent proposed revision to the Clean Water Act’s term, “Waters of the United States” was published in the Federal Register. (See 86 FR 69372.) Comments on this proposal must be submitted by February 7, 2022. This term controls the scope of federal regulatory powers in such programs as the development of water quality standards, impaired waters, total maximum daily loads, oil spill prevention, preparedness and response plans, state and tribal water quality certification programs, the National Pollutant Discharge Elimination System (NPDES) permit program, and the Corps of Engineers’ dredge and fill program. The Environmental Protection Agency (EPA) and the Corps of Engineers have jointly drafted this comprehensive proposed rule, which also responds to President Biden’s Executive Order 13990, issued in January 2021.
Background
The agencies noted that they have repeatedly defined and re-defined “Waters of the United States” since the Clean Water Act was enacted in 1972. This level of sustained commitment is unique to this program, perhaps reflecting the importance of the programs that are implemented through the Clean Water Act. The most recent rulemaking efforts took place in 2015, 2017, 2020 and now 2022, and the Supreme Court has issued several landmark rulings in response to these efforts. See City of Milwaukee v. Illinois, 451 US 304 (1981), United States v. Riverside Bayview, 474 US 121 (1985), SWANCC v. United States, 531 US 159 (2001), Rapanos v. United States, 547 US 715 (2006), National Association of Manufacturers v. Department of Defense, 138 S Ct 617 (2018), and County of Maui, Hawaii v. Hawaii Wildlife Fund, 140 S, Ct 1462 (2020). The rules promulgated in 2015 and entitled, “Clean Water Act: Definition of Waters of the United States” expanded the scope of federal regulatory jurisdiction, but the 2020 rule, entitled the “Navigable Waters Protection Rule,” contracted that scope. Now, the agencies have proposed the “Revised Definition of ‘Waters of the United States,’” which will rescind the 2020 rule and inevitably restore something of the scope of the 2015 rule by returning to the familiar “1986 rules” that were issued by the Corps of Engineers in 1986 and EPA in 1988, as modified by the recent Supreme Court decisions mentioned above. Both the 2015 and 2020 rules were mired in litigation and the Corps and EPA view the resort to the 1986 rules as a fresh start for the Clean Water Act. In short, the topsy-turvy history of regulation under the Clean Water Act continues.
Read the court decisionRead the full story...Reprinted courtesy of
Anthony B. Cavender, PillsburyMr. Cavender may be contacted at
anthony.cavender@pillsburylaw.com
COVID-19 and Mutual Responsibility Clauses
June 01, 2020 —
Joseph M. Leone - ConsensusDocsAs everyone knows, there is a tremendous amount of uncertainty in the construction industry due to the COVID-19 pandemic. Schedules, productivity, safety processes, and seemingly everything else are being affected. In these difficult times, most contractors are making every effort to work together to solve the problems caused by COVID-19. But what happens when differences arise between project owners, contractors, and subcontractors as to the effect of COVID-19 on a project? One party may want to continue pushing the schedule, others may want to slow down, or, more likely, not be able to keep up with the original schedule because of some reason related to COVID-19. As between a prime contractor and a subcontractor, a mutual responsibility clause can provide some clarity or, unfortunately, depending on how the subcontract is written, confusion.
Almost all subcontracts have a clause which flows down the prime contractor’s obligations on a project to the subcontractor as applicable to the subcontractor’s work. Known as “flow-down” clauses, this clause works in one direction; obligations of the prime contractor “flow-down” to the Subcontractor. A mutual responsibility clause, in essence, works in both directions. The subcontractor is required to perform its obligations consistent with the prime contractor’s obligations to the owner and the subcontractor is granted the same rights against the prime contractor which the prime contractor has against the owner. Obligations flow down and rights flow up. The rights and obligations flowing through the prime contractor include, the obligation to perform the work in accordance with the plans and specifications, the obligation to meet the schedule constraints in the prime agreement, and the right to extensions of time and change orders to the extent the prime contractor obtains the same.
Read the court decisionRead the full story...Reprinted courtesy of
Joseph M. Leone, Drewry Simmons Vornehm, LLP Mr. Leone may be contacted at
jleone@dsvlaw.com
Michigan Civil Engineers Give the State's Infrastructure a "C-" Grade, Improving from "D+" Grade in 2018
May 08, 2023 —
The American Society of Civil EngineersLANSING, MI. — The Michigan Section of the
American Society of Civil Engineers (ASCE) released the
2023 Report Card for Michigan's Infrastructure today, with 14 categories of infrastructure receiving an overall grade of 'C-', an improvement over the 'D+' grade issued in the state's 2018 report card. That means Michigan's infrastructure systems are improving but are still in average condition and require attention. Michigan's grade is on par with the national average of 'C-' given in the
2021 Report Card for America's Infrastructure. Civil engineers graded Michigan's aviation (C), bridges (D+), dams (C-), drinking water (D+), energy (D), inland waterways (C), public parks (C), rail (C), roads (D), schools (C-), solid waste (C+), stormwater (D), transit (C-), and wastewater (C). The report also included a chapter on the state's broadband infrastructure, which did not receive a grade due to insufficient available data.
Michigan policymakers have driven progress in the last five years to improve infrastructure assets by implementing short-term funding solutions to address decades of deferred maintenance, including surface transportation funding through the Rebuilding Michigan plan and improved water infrastructure systems through the MI Clean Water Plan. The state will also benefit from recent federal infrastructure investments included in the Bipartisan Infrastructure Law (BIL), Coronavirus Aid, Relief, and Economic Security (CARES) Act, and American Rescue Plan Act (ARPA). However, Michigan generally lacks sufficient long-term funding mechanisms to ensure all infrastructure sectors reach and sustain a state of good repair.
ABOUT THE AMERICAN SOCIETY OF CIVIL ENGINEERS
Founded in 1852, the American Society of Civil Engineers represents more than 150,000 civil engineers worldwide and is America's oldest national engineering society. ASCE works to raise awareness of the need to maintain and modernize the nation's infrastructure using sustainable and resilient practices, advocates for increasing and optimizing investment in infrastructure, and improve engineering knowledge and competency. For more information, visit www.asce.org or www.infrastructurereportcard.org and follow us on Twitter, @ASCETweets and @ASCEGovRel.
Read the court decisionRead the full story...Reprinted courtesy of