The New York Lien Law - Top Ten Things You Ought to Know
December 23, 2023 —
Ralph E. Arpajian - White and Williams LLPOver the course of my career, I have had the privilege of working with and representing numerous construction lenders (and borrowers/developers) in the financing of some of the largest commercial projects in the United States.
A number of these projects have been in New York, where one encounters the New York Lien Law (the “Lien Law”). Many of my clients, particularly those lenders, borrowers, and their counsel, located outside of New York, are often perplexed by my advice regarding the Lien Law and the loan structuring requirements which result. In the hope that it would be helpful (especially for non-New York counsel), I have compiled a “top ten” list outlining, in my view, the most critical (and most perplexing) aspects of structuring New York construction loans under the Lien Law.
Read the court decisionRead the full story...Reprinted courtesy of
Ralph E. Arpajian, White and Williams LLPMr. Arpajian may be contacted at
arpajianr@whiteandwilliams.com
Water Drainage Case Lacks Standing
March 28, 2012 —
CDJ STAFFThe Texas Court of Appeals has ruled in the case La Tierra de Simmons Familia Ltd. V. Main Event Entertainment, LP. The trial court had found for Main Event. On appeal, the court threw out some of the grounds on which the trial court had reached its decision.
The case involved two commercial lots in northwest Austin, Texas. The uphill tract (Phase III of the Anderson Arbor development) diverts its runoff onto the lower tract (the “Ballard tract”). The owners of the Ballard tract claim that “the drainage system was designed or constructed in a manner that has damaged and continues to damage the Ballard tract.”
Both tracts have undergone changes of ownership since the construction of the drainage system in 2004. At the time the drainage system was constructed, the parcel was owned by Sears Roebuck and Co. Sears later sold the property. Main Event Entertainment is the current tenant. Likewise, the Ballard tract was previously owned by the Ballard Estate which sold the property to La Tierra on an “as is” basis in 2007.
After La Tierra bought the Ballard tract, La Tierra’s engineer “witnessed and videotaped what he described as ‘flooding’ on the Ballard tract caused by storm water discharge from the Anderson Arbor drainage system during a rainfall event.” La Tierra determined that an adequate drainage system would cost about $204,000. Development plans were put on hold.
La Tierra sued Main Event and various other parties associated with the uphill tract, seeking “actual damages for (1) decrease and loss in rental income due to delay in obtaining the development permit, (2) interest on carrying costs during that time period, (3) the cost to build a water conveyance system on the Ballard tract, (4) engineering fees incurred to redesign the water conveyance system, (5) unspecified out-of-pocket real estate expenses, and (6) property devaluation occasioned by the need to construct an expensive water conveyance system.” The trial court never reached these claims, ruling instead that La Tierra lacked standing, that its claims were barred under the statute of limitations, and that there was no evidence of damage.
La Tierra appealed, arguing that “(1) the summary-judgment evidence does not conclusively establish that property damage claims accrued or were discovered prior to September 11, 2007, which is within the limitations period and was after La Tierra purchased the property; (2) even if the property was damaged before La Tierra acquired ownership of the Ballard tract, standing exists based on the assignments of interest from the Ballard Estate heirs, and the discovery rule tolls limitations until the injury was discovered on September 11, 2007; (3) limitations does not bar La Tierra's request for injunctive relief; (4) La Tierra's water code claim against Main Event and M.E.E.P. is viable based on their control over the drainage system, which makes them necessary and indispensable parties for injunctive relief; (5) La Tierra presented more than a scintilla of evidence to raise a fact issue on damages, causation, and other essential elements of its causes of action; and (6) the trial court abused its discretion when it sustained the defendants' objections to La Tierra's summary-judgment evidence.”
The appeals court concluded that La Tierra’s second claim was irrelevant to standing, as La Tierra “obtained assignments from the Ballard Estate heirs ? nearly one year after the lawsuit was initially filed.” Nor did the court accept their first point. The water system had been operating unaltered since January, 2004, with monthly maintenance and inspection to maintain its designed operation. Further, a feasibility report La Tierra received stated that “over sixteen acres drain into those ponds, and thus onto this site.” The court noted that “the underlying facts giving rise to a cause of action were known before La Tierra acquired ownership of the Ballard tract.”
The court concluded that the drainage issue is a permanent injury, but that it “accrued before La Tierra acquired an ownership interest in the property.” As La Tierra has standing, the appeals court ruled that it was improper for the trial court to rule on the issues. The appeals court dismissed the questions of whether the case was barred under the statute of limitation and also the question of whether or not La Tierra had damages.
As the issue of standing would not allow La Tierra to bring the suit, the appeals court found for the defendants, dismissing the case for this single reason, and otherwise affirming the ruling of the lower court.
Read the court’s decision…
Read the court decisionRead the full story...Reprinted courtesy of
State Supreme Court Cases Highlight Importance of Wording in Earth Movement Exclusions
June 21, 2017 —
Hannah E. Austin - Saxe Doernberger & Vita, P.C.In Erie Insurance Property and Casualty Company v. Chaber, the West Virginia Supreme Court recently
held that an insurance policy’s earth movement exclusion was unambiguous and applied to both manmade
and natural earth movement. The Court also found that a narrow “ensuing loss” exception to the exclusion
that provided coverage for glass breakage resulting from earth movement could not be extended to cover the
entire loss.
The Erie Insurance Property and Casualty Company (Erie) insured five commercial buildings owned by
Dmitri and Mary Chaber. One of the properties was damaged by a landslide, and the Chabers filed a claim
with Erie. Erie asserted that the loss was excluded from coverage because the policy excluded coverage for
losses caused by earth movement, which was defined to include earthquakes, landslides, subsidence of
manmade mines, and earth sinking (aside from sinkhole collapse), rising or shifting. The exclusion stated
that it applied “regardless of whether any of the above . . . is caused by an act of nature or is otherwise
caused,” and also contained an anti-concurrent causation clause. However, there was an exception for glass
breakage caused by earth movement.
Read the court decisionRead the full story...Reprinted courtesy of
Hannah E. Austin, Saxe Doernberger & Vita, P.C.Ms. Austin may be contacted at
hea@sdvlaw.com
Construction Down in Twin Cities Area
October 30, 2013 —
CDJ STAFFAlthough the year has been better for the Minneapolis/St. Paul area, with a 9% increase since last year, this September saw 25% less construction spending than last September. Non-residential construction dropped even further, losing 36%.
Although September was a bad month, the year-to-date value of construction contracts is about $3.3 billion, exceeding last year’s $3.0 billion for the region.
Read the court decisionRead the full story...Reprinted courtesy of
Colorado Introduces Construction Defect Bill for Commuter Communities
January 23, 2013 —
CDJ STAFFA Colorado State Senator has introduced a bill suggesting a change to the way that construction defect claims are handled in "transit-oriented developments." And what are these? According to the bill these are "any multi-family residential or mixed-use project within one-half mile of any commuter rail stop, commuter light rail stop, or commuter bus stop." So the bill would treat homes with good public transportation differently from those not so convenient to public transportation.
The bill, SB 52, would institute a right to repair for construction defects in these developments. Construction defect claims would be referred to binding arbitration. Further, construction professionals could not be sued for environmental conditions related to transit, commercial, public, or retail use.
Read the court decisionRead the full story...Reprinted courtesy of
No Interlocutory Appeals of "Garden-Variety" Contract Disputes
March 12, 2015 —
Jesse Howard Witt – Acerbic WittColorado’s new procedure for interlocutory appeals has its limits. In the recent decision of Rich v. Ball Ranch Partnership, ___ P.3d ___, 2014 COA 6 (2015), the Colorado Court of Appeals held that Appellate Rule 4.2 does not permit interlocutory review of questions of law in “garden-variety” or “run-of-the-mill” contract disputes. This resolves a subtle question that has been lingering since Colorado first created the interlocutory appeal process four years ago.
Prior to 2011, Colorado did not permit civil litigants to seek appellate review prior to final judgment, except in a small handful of situations. As I discussed in an article at the time, this changed with the passage of C.R.S. § 13-4-102.1 and the adoption of Rule 4.2, which granted the court of appeals discretion to permit the immediate appeal of certain district court orders. These provisions allowed parties to seek interlocutory review of orders before the conclusion of a case if a district court could certify that (1) immediate review might promote a more orderly disposition or establish a final disposition of the litigation, and (2) the order involved a controlling and unresolved question of law. The rule was patterned after 28 U.S.C. § 1292(b), which provides similar relief in the federal courts.
Read the court decisionRead the full story...Reprinted courtesy of
Jesse Howard Witt, The Witt Law FirmMr. Witt welcomes comments at www.acerbicwitt.com
It Was a Wild Week for Just About Everyone. Ok, Make that Everyone.
April 06, 2020 —
Garret Murai - California Construction Law BlogIt was a crazy week last week as the number of coronavirus cases in the United States jumped to 32,783 cases as of Sunday, from 3,680 cases, just a week before. In an attempt to “flatten the curve” and help those impacted by the virus, numerous federal, state, and local orders were issued, including orders requiring that residents “shelter in place.”
For businesses impacted by the “shelter in place” orders, which, in California, means virtually every business in the state following Governor Newsom’s state-wide “shelter in place” order, there’s been confusion as to who can and can’t continue to work under the orders including among contractors and project owners. Although things have been changing, sometimes daily, here’s what you need to know about the “shelter in place” orders:
The Local “Shelter In Place” Orders
On Monday, March 16, 2020, six Bay Area counties, and the City of Berkeley, issued “shelter in place” orders requiring that residents in those counties and city shelter in place except for “Essential Activities,” if performing “Essential Governmental Functions,” or if operating “Essential Businesses.”
Read the court decisionRead the full story...Reprinted courtesy of
Garret Murai, Nomos LLPMr. Murai may be contacted at
gmurai@nomosllp.com
Surety’s Several Liability Under Bonds
March 20, 2023 —
David Adelstein - Florida Construction Legal UpdatesWhen a payment or performance bond is issued on behalf of its bond-principal, the surety is jointly and severally liable with its bond-principal. This means the surety has several liability under the bond, i.e., you don’t need to pursue the principal of the bond to pursue liability under the bond, which is a separate written intrument. Thus, if you are claiming damages of $500,000, by way of example, you can sue both the principal and surety under the bond, you can ONLY sue the principal under the bond (which is rarely practical), or you can ONLY sue the surety under the bond (which, oftentimes, is very practical). In many instances where I am pursuing a bond claim on behalf of a client, particularly a payment bond claim, I only sue the surety and do not sue the bond-principal unless there are certain strategic reasons in doing so. This is because of the surety’s several liability under the bond and there may be solvency issues with the principal or contractual reasons that, strategically, make much more sense to exclude the principal from the action.
In MJM Electric, Inc. v. National Union Fire Ins. Co. of Pittsburgh, PA, 2023 WL 2163087 (M.D.Fla. 2023), an electrical subcontractor was hired to perform electrical work by the prime contractor. The prime contractor had a payment bond. The project was delayed for two years. The electrical subcontractor claimed the prime contractor failed to compensate it for significant delays and out of scope work.
Read the court decisionRead the full story...Reprinted courtesy of
David Adelstein, Kirwin Norris, P.A.Mr. Adelstein may be contacted at
dma@kirwinnorris.com