No Additional Insured Coverage for Subcontractor's Work Outside Policy Period
August 19, 2015 —
Tred R. Eyerly – Insurance Law HawaiiIn a dispute between two insurers, the district court determined that the contractor was not an additional insured under the subcontractor's policy. Navigators Spec. Ins. Co. v. St. Paul Surplus Lines Ins. Co., 2015 U.S. Dist. LEXIS 79338 (N. D. Cal. June 17, 2015).
McDevitt & McDevitt Construction Corporation was the general contractor for construction of a condominium complex. McDevitt was insured by Navigators Specialty Insurance Company. F&M was a subcontractor for the project for providing structural steel components. F&M's subcontract required it to obtain liability insurance and name McDevitt as an additional insured under a policy that was to be primary. F&M secured a policy with North American Capacity Insurance Company (NAC) which included an endorsement for additional insureds. The endorsement provided that an entity could be an additional insured only with respect to "occurrences resulting from work performed by you during the policy period, or occurrences resulting from the conduct of your business during the policy period."
McDevitt and F&M were sued for construct defect claims. Navigators defended McDevitt and NAC defended F&M. Navigators tendered McDevitt's defense to NAC because McDevitt was an additional insured under NAC's policy. NAC disclaimed coverage.
Read the court decisionRead the full story...Reprinted courtesy of
Tred R. Eyerly, Insurance Law HawaiiMr. Eyerly may be contacted at
te@hawaiilawyer.com
Congratulations to Haight Attorneys Selected to the 2021 Southern California Super Lawyers List
January 25, 2021 —
Haight Brown & Bonesteel LLPEight Haight attorneys have been selected to the 2021 Southern California Super Lawyers list.
Congratulations to:
Read the court decisionRead the full story...Reprinted courtesy of
Haight Brown & Bonesteel LLP
Court of Appeal Shines Light on Collusive Settlement Agreements
October 21, 2015 —
Kristian B. Moriarty & R. Bryan Martin – Haight Brown & Bonesteel LLPIn Diamond v. Reshko, (filed 8/20/2015, No. A139251) the California Court of Appeal, First District, held that a defendant was entitled to introduce evidence at trial reflecting amounts paid by co-defendants in settlement of a plaintiff’s claim.
Plaintiff, Christine Diamond, was injured during an automobile accident that occurred while she was a passenger in a taxi driven by Amir Mansouri. Christine, and her husband Andrew, filed suit against Mr. Mansouri, the Yellow Cab Collective (“Yellow Cab”), and the driver of the vehicle that collided with the taxi, Serge Reshko. Before trial, Mansouri and the Yellow Cab Collective settled with Plaintiffs, but agreed to appear and participate as defendants at the jury trial of the action. Mansouri and Yellow Cab paid a total of $400,000 to Plaintiffs in settlement.
Reshko filed a pre-trial motion seeking an order permitting Reshko to admit evidence of the settlement between Plaintiffs and the other defendants. The trial court refused to rule on the motion before trial. Ultimately, evidence of the settlement between Plaintiffs, Mansouri and Yellow Cab was excluded during trial. The jury returned a verdict in favor of Plaintiffs in the total amount of $745,778, finding Mansouri 40 percent at fault, and Reshko 60 percent at fault. The Trial Court entered judgment against Reshko in the sum of $406,698.
Reshko appealed the judgment. The First District Court of Appeal reversed, holding that evidence of the settlement should have been admitted at trial because the settling defendant’s position should be revealed to the court and jury to avoid committing a fraud on the court, and in order to permit the trier of fact to properly weigh the settling defendant’s testimony.
Reprinted courtesy of
Kristian B. Moriarty, Haight Brown & Bonesteel LLP and
R. Bryan Martin, Haight Brown & Bonesteel LLP
Mr. Moriarty may be contacted at kmoriarty@hbblaw.com
Mr. Martin may be contacted at bmartin@hbblaw.com
Read the court decisionRead the full story...Reprinted courtesy of
Alaska District Court Sets Aside Rulings Under New Administration’s EO 13795
May 06, 2019 —
Anthony B. Cavender - Gravel2GavelOn March 29, the U.S. District Court for the District of Alaska issued two separate rulings that reversed and set aside energy and environmental decisions made by the current administration, which had revoked decisions made in these same matters by the prior administration. The cases are League of Conservation Voters, et al., v. Trump (concerning the development of oil and gas leases on the Outer Continental Shelf (OCS)) and Friends of Alaska National Wildlife Refuges, et al., v. Bernhardt, Acting Secretary of the U.S. Department of the Interior (which concerns a Land Exchange that would facilitate the construction of a road between two remote Alaska communities when that road would traverse parts of a designated national wilderness).
In the League of Conservation Voters matter, the District Court held that the President’s Executive Order 13795 (released on April 28, 2017), which purported to revoke President Obama’s decisions to withdraw certain OCS tracts from oil and gas exploration and development, was unlawful because it was not authorized by Section 12(a) of the Outer Continental Shelf Lands Act (OCSLA). In 2015 and 2016, President Obama issued Presidential Memorandums and an Executive Order withdrawing these particular tracts.
Read the court decisionRead the full story...Reprinted courtesy of
Anthony B. Cavender, PillsburyMr. Cavender may be contacted at
anthony.cavender@pillsburylaw.com
Court Strikes Down Reasonable Construction Defect Settlement
December 20, 2012 —
CDJ STAFFThe Court of Appeals of Washington has struck down a construction defect settlement between a building owner and the companies she hired to repair the siding, among other repairs to bring the building up to code. Yuan Zhang hired Hawk Construction LLC to do repair work. Hawk, in turn, hired Ready Construction LLC for some aspects of the project. Hawk and Ready were both insured by Capital Specialty Insurance Corporation.
There were several problems with Ready’s work. After removing old siding, they did not protect the building, nor did they remove all of the damaged layers. Ready covered, but did not fix, a mildew problem under the old siding. When new siding was reattached, the nails used were too short to adequately attach it.
After paying for an inspection of the work, Zhang had Hawk and Ready begin the repairs again, but the work was abandoned without being completed. Zhang sued Hawk for breach of contract. Hawk then sued Ready, claiming that “Ready was liable to Hawk to the extent that Hawk was liable to Zhang.” Capitol retained defense for both contractors.
Zhang settled with Hawk, in an agreement that gave her “the right to collect and/or pursue all costs and attorney fees paid by Hawk or its insurance company defending against the Zhang’s claims and pursuing claims against Ready.” Subsequently, she also settled with Ready. Both companies ceased operations.
Zhang had the settlements reviewed by a court, which concluded that the settlements were reasonable. Capital was allowed to appeal, claiming that the settlement included costs that were Zhang’s responsibility. The appeals court did not examine the question of the reasonableness of the settlement, concluding that Capitol’s interests were relevant only to “questions of bad faith, collusion, and fraud.”
In the case of Zhang, the court concluded that the relationship between Zhang and her former contractors was collusive. The court noted that “bad faith or collusion may exist when the evidence indicates a joint effort to create, in a non-adversarial atmosphere, a resolution beneficial to both parties, yet highly prejudicial to the insurer as intervener.” The court noted that both companies had minimal assets which were, in any case, exempted from the agreement. Further, the court found that the agreements failed to determine “what amount of the repairs related to preexisting water damage.” Zhang’s calculation of costs also included her expenses for architectural and engineering services, which the court points out, “where always Zhang’s costs to bear.”
The court concluded that “the overall structure of the settlements is highly probative of collusion, fraud, or bad faith.” Zhang’s agreements with Hawk and Ready allowed her to collect compensation from Hawk and then collect Ready’s compensation to Hawk for their portion of the settlement, allowing Zhang to collect the monies twice. Further, she was allowed to pursue Capitol for Hawk’s attorney expenses, even though Hawk had none. “The right to recover Hawk’s fees merely set up a windfall recovery for Zhang.” The court described the agreements among Zhang, Hawk, and Ready as “precisely the type of manipulation [the law] is intended to preclude.”
Read the court decisionRead the full story...Reprinted courtesy of
The Woodland Hills Office Secures a Total Defense Award on Behalf of their High-End Custom Home Builder Client!
June 04, 2024 —
Dolores Montoya - Bremer Whyte Brown & O'Meara LLPPartner Daniel Crespo and Associate Theresa Mallen secured a total defense award in arbitration. Our client is a high-end custom home builder with a decades-long flawless record of museum quality construction. Our client was accused of performing substandard construction and the homeowners asserted a multiple million-dollar cost of repair. We took a zero-liability position and argued that the alleged defects were not defects at all but were rather mere reflections of an incomplete project. In sum, our client was forced to terminate the contract and cease construction due to the homeowners’ failure to make progress payments as they became due. The arbitration endured 16 days of testimony scattered over the course of 7 months.
Ultimately, the arbitrator ruled that there were no construction defects at the project and that the homeowners “shall take nothing.” The arbitrator also ruled in favor of our client on its affirmative claim for monies owed by the homeowners’ breach of contract plus interest. A total victory for our client.
Read the court decisionRead the full story...Reprinted courtesy of
Dolores Montoya, Bremer Whyte Brown & O'Meara LLP
The Right to Repair Act Means What it Says and Says What it Means
December 18, 2022 —
Garret Murai - California Construction Law BlogA rather short case for a short week.
In Gerlach v. K. Hovnanian’s Four Seasons at Beaumont, LLC, 82 Cal.App.5th 303 (2022), the 4th District Court of appeals examined provisions of the Right to Repair Act (Civ. Code §§895 et. seq), also known as “SB 800” after its original bill number, as it applies to roofs.
The Gerlach Case
Lynn Gerlach and Lola Seals are homeowners who purchased their homes in the Four Seasons at Beaumont adult community, for those 55 year old and older, located in Beaumont, California. Gerlach purchased her home when it was built in 2006. Seals purchased her home from the original owners in 2015.
In 2015 and 2016, Gerlach and Seals served the developer, K. Hovnanian’s Four Seasons at Beaumont, LLC, with claim notices under the Right to Repair Act. The Right to Repair Act, as its name implies, provides notice requirements and repair rights by developers of new single-family homes. The Right to Repair Act also includes construction standards, the violation of which, provides homeowners with a statutory basis for bringing construction defect claims.
Read the court decisionRead the full story...Reprinted courtesy of
Garret Murai, Nomos LLPMr. Murai may be contacted at
gmurai@nomosllp.com
San Francisco International Airport Reaches New Heights in Sustainable Project Delivery
November 21, 2022 —
Aileen Cho - Engineering News-RecordTen years ago, Geoff Neumayr decided he was tired of “doing design and construction by combat.” San Francisco International Airport had completed a master plan for the complex and the front of the airport facilities doing things the traditional way.
Reprinted courtesy of
Aileen Cho, Engineering News-Record
Ms. Cho may be contacted at choa@enr.com