Ohio Court of Appeals: Absolution Pollution Exclusion Bars Coverage for Workplace Coal-Tar Pitch Exposure Claims
January 10, 2018 —
Complex Insurance Coverage ReporterOn December 28, 2017, the Ohio Court of Appeals (Eighth District) held in GrafTech International, Ltd., et al. v. Pacific Employers Ins. Co., et al., No. 105258 that coverage for alleged injurious exposures to coal tar pitch was barred by a liability insurance policy’s absolute pollution exclusion. Applying Ohio law, the court concluded that Pacific Employers had no duty to defend GrafTech or pay defense costs in connection with claims by dozens of workers at Alcoa smelting plants that they were exposed to hazardous substances in GrafTech products supplied to Alcoa as early as 1942.
Read the court decisionRead the full story...Reprinted courtesy of
White and Williams LLP
Bay Area Counties Issue Less Restrictive “Shelter in Place” Orders, Including for Construction
May 04, 2020 —
Garret Murai - California Construction Law BlogThe short story: Construction can resume. The long story: Construction can resume beginning Monday, May 4, 2020,
with extensive and detailed restrictions.
Six Bay Area Counties Loosen Shelter-in-Place Restrictions Including Allowing Construction to Resume
Earlier this week, six Bay Area counties and the City of Berkeley issued new orders requiring the use of face coverings when in public. The six Bay Area counties, which also happen to be the first counties in the nation to issue shelter-in-place orders, are Alameda, Contra Costa, Marin, San Francisco, San Mateo and Santa Clara.
When do the revised shelter-in-place orders take effect?
The revised shelter-in-place orders take effect at 11:59 p.m. on May 3, 2020 and will remain in effect until 11:59 p.m. on May 31, 2020 unless extended, rescinded, superseded, or amended. Thus, effectively, the new orders take effect on Monday, May 4, 2020.
Read the court decisionRead the full story...Reprinted courtesy of
Garret Murai, Nomos LLPMr. Murai may be contacted at
gmurai@nomosllp.com
Ongoing Operations Exclusion Bars Coverage
December 09, 2019 —
Tred R. Eyerly - Insurance Law HawaiiThe insurer denied the insured contractor's claim seeking a defense for faulty workmanship based upon the ongoing operations exclusion. PJR Constr. of N.J. v. Valley Forge Ins. Co., 2019 U.S. Dist. LEXIS 127973 (D. N. J. July 31, 2019).
PJR Construction was the general contractor to build a swim club and pavilion building for Cambridge Real Property, LLC. PJR began construction on May 29, 2012, and was to complete the construction by March 1, 2013. The project took much longer than anticipated. PJR was denied access to the site on November 13, 2014. Cambridge contended PJR tolerated shoddy workmanship and breached the terms of the contract documents. Cambridge estimated that the project was between 55% and 74.3% complete.
PJR and Cambridge went to arbitration. PJR sought a defense from the insurers. Coverage was denied based upon exclusions j (5) and j (6). Exclusion j (5), which the court referred to as the "Ongoing Operations Exclusion," provided the policy did not apply to,
Property Damage to . . . [t]hat particular part of real property on which you or any contractors or subcontractors working directly or indirectly on your behalf are performing operations, if the property damage arises out of those operations.
Read the court decisionRead the full story...Reprinted courtesy of
Tred R. Eyerly, Damon Key Leong Kupchak HastertMr. Eyerly may be contacted at
te@hawaiilawyer.com
Update to Washington State Covid-19 Guidance
November 23, 2020 —
Brett M. Hill - Ahlers Cressman & Sleight PLLCYesterday, November 15, 2020, Governor Inslee announced modifications to the current COVID-19 restrictions in response to the current rise in cases across Washington State.
There are no additional restrictions on construction at this time. However, during the Governor’s press conference yesterday, he did indicate that positive cases were increasing on construction sites, and that they would be tracking the statistics over the next 2 – 3 weeks – to see if additional restrictions would be necessary for construction sites in the future. Additionally, the construction industry group is meeting with the Governor’s office today, November 16, 2020, and we will keep you informed of any changes as a result of that meeting.
Unless otherwise specifically noted, the modifications take effect at 12:01 a.m., Tuesday, November 17, 2020. All modifications to existing prohibitions set forth herein shall expire at 11:59 p.m., Monday, December 14, 2020, unless otherwise extended. If an activity is not listed below, currently existing guidance shall continue to apply. If current guidance is more restrictive than the below listed restrictions, the most restrictive guidance shall apply. These below modifications do not apply to education (including but not limited to K-12, higher education, trade and vocational schools), childcare, health care, and courts and judicial branch-related proceedings, all of which are exempt from the modifications and shall continue to follow current guidance. Terms used in this proclamation have the same definitions used in the Safe Start Washington Phased Reopening County-by-County Plan.
Read the court decisionRead the full story...Reprinted courtesy of
Brett M. Hill, Ahlers Cressman Sleight PLLCMr. Hill may be contacted at
brett.hill@acslawyers.com
Insurance Measures Passed by 2015 Hawaii Legislature
June 10, 2015 —
Tred R. Eyerly – Insurance Law HawaiiThe 2015 Hawaii legislative session passed three insurance-related bills which have all been signed by the governor. Bills that have been enacted are the following:
SB0589 - We previously devoted this post to the legislation. The bill provides relief for residents in lava zones on the Big Island. The bill limits the number of property policies that an insurer can refuse to renew in a lava zone. Further, a moratorium on the issuance of policies can be lifted in a state of emergency due to the threat of imminent disaster from a lava flow.
SB0736 - Provisions relating to reimbursement for accident and health or sickness insurance benefits are amended. Further, the bill provides that prior to initiating any recoupment or offset demand efforts, an entity must send a written notice to the health care provider at least 30 days prior to engaging in recoupment or offset efforts. An entity may not initiate recoupment or offset efforts more than 18 months after the initial claim payment was received by the health care provider or health care entity.
Read the court decisionRead the full story...Reprinted courtesy of
Tred R. Eyerly, Insurance Law HawaiiMr. Eyerly may be contacted at
te@hawaiilawyer.com
Climate Change a Factor in 'Unprecedented' South Asia Floods
July 18, 2022 —
The Associated Press (Aniruddha Ghosal & Al-Emrun Garjon) - BloombergSylhet, Bangladesh (AP) -- Scientists say climate change is a factor behind the erratic and early rains that triggered unprecedented floods in Bangladesh and northeastern India, killing dozens and making lives miserable for millions of others.
Although the region is no stranger to flooding, it typically takes place later in the year when monsoon rains are well underway.
This year's torrential rainfall lashed the area as early as March. It may take much longer to determine the extent to which climate change played a role in the floods, but scientists say that it has made the monsoon — a seasonable change in weather usually associated with strong rains — more variable over the past decades. This means that much of the rain expected to fall in a year is arriving in a space of weeks.
Read the court decisionRead the full story...Reprinted courtesy of
Bloomberg
2023 Executive Insights From Leaders in Construction Law
June 12, 2023 —
Construction ExecutiveIf a major project is interrupted or canceled, are there any laws that provide protection for unpaid contractors that have performed work?
Angela Richie
Partner, Co-Chair, Construction Practice Group
Gordon Rees Scully Mansukhani
With the current volatility and uncertainty in the economy, project interruptions and cancellations are on the rise; hence, you need to take steps now to make sure you have a method to get paid for the work you have performed.
For private projects, make sure you have followed the pre-lien notification requirements for the state in which the project is located before you start work, if they are required. Then, be sure to follow the lien notice and lien filing requirements for the state. Each state is different, so you want to be ready with the appropriate documentation in advance of the project interruption or cancellation.
Reprinted courtesy of
Construction Executive, a publication of Associated Builders and Contractors. All rights reserved.
Read the court decisionRead the full story...Reprinted courtesy of
Court Affirms Summary Adjudication of Bad Faith Claim Where Expert Opinions Raised a Genuine Dispute
July 06, 2020 —
Christopher Kendrick & Valerie A. Moore – Haight Brown & Bonesteel LLPIn 501 East 51st Street etc. v. Kookmin Best Ins. Co., Ltd. (No. B293605, filed 4/2/20, ordered pub. 4/16/20), a California appeals court affirmed summary adjudication and dismissal of a bad faith claim based on the genuine dispute doctrine.
501 East 51st Street Long-Beach-10, LLC (501) was the owner of a 10-unit apartment complex, insured by Kookmin Best. In 2017, an underground water main alongside the building burst which, according to 501, caused the building to move and crack. 501 made a claim and supplied a geotechnical report finding cracks in the foundation walls, cracks in the stucco and significant floor deformation and tilting near the water leak. The engineer’s opinion concluded that that “existing building distress was substantially contributed to by the water main break. The water introduced to the soil medium appears to have triggered differential foundation movement causing the stress features to develop.”
Kookmin retained its own engineers to investigate, who returned an opinion that the leak had exacerbated long-term pre-existing settlement which would continue. Under the policy, damage to the building caused by earth movement and settlement were excluded, but water damage resulting from an “accidental discharge” of water was covered. Kookmin then obtained an opinion from coverage counsel, who opined that only damage allocable to the water leak would be covered.
Reprinted courtesy of
Christopher Kendrick, Haight Brown & Bonesteel LLP and
Valerie A. Moore, Haight Brown & Bonesteel LLP
Mr. Kendrick may be contacted at ckendrick@hbblaw.com
Ms. Moore may be contacted at vmoore@hbblaw.com
Read the court decisionRead the full story...Reprinted courtesy of