BERT HOWE
  • Nationwide: (800) 482-1822    
    landscaping construction building expert Fairfield Connecticut institutional building building expert Fairfield Connecticut housing building expert Fairfield Connecticut condominium building expert Fairfield Connecticut hospital construction building expert Fairfield Connecticut tract home building expert Fairfield Connecticut low-income housing building expert Fairfield Connecticut custom homes building expert Fairfield Connecticut Subterranean parking building expert Fairfield Connecticut townhome construction building expert Fairfield Connecticut concrete tilt-up building expert Fairfield Connecticut retail construction building expert Fairfield Connecticut office building building expert Fairfield Connecticut mid-rise construction building expert Fairfield Connecticut multi family housing building expert Fairfield Connecticut Medical building building expert Fairfield Connecticut custom home building expert Fairfield Connecticut condominiums building expert Fairfield Connecticut casino resort building expert Fairfield Connecticut production housing building expert Fairfield Connecticut industrial building building expert Fairfield Connecticut parking structure building expert Fairfield Connecticut
    Fairfield Connecticut engineering consultantFairfield Connecticut concrete expert witnessFairfield Connecticut consulting general contractorFairfield Connecticut construction expertsFairfield Connecticut construction expert witness consultantFairfield Connecticut construction expert witnessFairfield Connecticut window expert witness
    Arrange No Cost Consultation
    Building Expert Builders Information
    Fairfield, Connecticut

    Connecticut Builders Right To Repair Current Law Summary:

    Current Law Summary: Case law precedent


    Building Expert Contractors Licensing
    Guidelines Fairfield Connecticut

    License required for electrical and plumbing trades. No state license for general contracting, however, must register with the State.


    Building Expert Contractors Building Industry
    Association Directory
    Home Builders & Remo Assn of Fairfield Co
    Local # 0780
    433 Meadow St
    Fairfield, CT 06824

    Fairfield Connecticut Building Expert 10/ 10

    Builders Association of Eastern Connecticut
    Local # 0740
    20 Hartford Rd Suite 18
    Salem, CT 06420

    Fairfield Connecticut Building Expert 10/ 10

    Home Builders Association of New Haven Co
    Local # 0720
    2189 Silas Deane Highway
    Rocky Hill, CT 06067

    Fairfield Connecticut Building Expert 10/ 10

    Home Builders Association of Hartford Cty Inc
    Local # 0755
    2189 Silas Deane Hwy
    Rocky Hill, CT 06067

    Fairfield Connecticut Building Expert 10/ 10

    Home Builders Association of NW Connecticut
    Local # 0710
    110 Brook St
    Torrington, CT 06790

    Fairfield Connecticut Building Expert 10/ 10

    Home Builders Association of Connecticut (State)
    Local # 0700
    3 Regency Dr Ste 204
    Bloomfield, CT 06002

    Fairfield Connecticut Building Expert 10/ 10


    Building Expert News and Information
    For Fairfield Connecticut


    Issues of Fact Prevent Insurer's Summary Judgment Motion in Collapse Case

    Recent Changes in the Law Affecting Construction Defect Litigation

    Feds to Repair Damage From Halted Border Wall Work in Texas, California

    Learning from Production Homes of the Past

    Sales of Existing Homes in U.S. Fall to Lowest Since 2012

    Update: Supreme Court Issues Opinion in West Virginia v. EPA

    When Coronavirus Cases Spike at Construction Jobsites

    Economic Loss Rule Bars Claims Against Manufacturer

    Drones, Googleplexes and Hyperloops

    Florida Federal Court to Examine Issues of Alleged Arbitrator Conflicts of Interests in Panama Canal Case

    Challenging a Termination for Default

    Recent Third Circuit OSHA Decision Sounds Alarm for Employers and Their Officers

    New Joint Venture to Develop a New Community in Orange County, California

    Reduce Suicide Risk Among Employees in Remote Work Areas

    Indemnity Clauses—What do they mean, and what should you be looking for?

    William Lyon to Acquire RSI Communities

    Third Circuit Court of Appeals Concludes “Soup to Nuts” Policy Does Not Include Faulty Workmanship Coverage

    Reconstructing the Francis Scott Key Bridge Utilizing the Progressive Design-Build Method

    Buy a House or Pay Off College? $1.2 Trillion Student Debt Heats Up in Capital

    Coronavirus and Contract Obligations

    Pacing in Construction Scheduling Disputes

    Georgia Passes Solar CUVA Bill

    Narrow House Has Wide Opposition

    First Circuit Limits Insurers’ Right to Recoup Defense Costs or Settlement Payments

    A Place to Study Eternity: Building the Giant Magellan Telescope

    Affordable Global Housing Will Cost $11 Trillion

    Trends and Issues which Can Affect Workers' Compensation Coverage for Construction Companies

    Canada’s Largest Homebuilder Sets U.S. Growth Plan

    Security on Large Construction Projects. The Payment Remedy You Probably Never Heard of

    Ninth Circuit Holds that 1993 Budget Appropriations Language Does Not Compel the Corps of Engineers to use 1987 Wetlands Guidance Indefinitely

    Construction Contract Clauses Only a Grinch Would Love – Part 4

    Cooperating With Your Insurance Carrier: Is It a Must?

    Buffalo-Area Roof Collapses Threaten Lives, Businesses After Historic Snowfall

    FAA Seeks Largest Fine Yet on Drones in Near-Miss Crackdown

    Pandemic-Related Construction Materials Pricing Poses Challenges in Construction Lawsuits

    Colorado Introduces Construction Defect Bill for Commuter Communities

    U.S., Canada, Mexico Set New Joint Clean-Energy Goal

    Lawyer Claims HOA Scam Mastermind Bribed Politicians

    Plaintiffs In Construction Defect Cases to Recover For Emotional Damages?

    Admissibility of Expert Opinions in Insurance Bad Faith Trials

    The Courts and Changing Views on Construction Defect Coverage

    Claims Made Insurance Policies

    Daily Reports – The Swiss Army Knife of Project Documentation

    “Genuine” Issue of “Material” Fact and Summary Judgments

    Maybe Supervising Qualifies as Labor After All

    OSHA Investigating Bridge Accident Resulting in Construction Worker Fatality

    The G2G Year in Review: 2019

    Supreme Court Finds Insurance Coverage for Intentional (and Despicable) Act of Contractor’s Employee

    Construction defect firm Angius & Terry moves office to Roseville

    White House Seeks $310M To Fix Critical San Diego Wastewater Plant
    Corporate Profile

    FAIRFIELD CONNECTICUT BUILDING EXPERT
    DIRECTORY AND CAPABILITIES

    The Fairfield, Connecticut Building Expert Group is comprised from a number of credentialed construction professionals possessing extensive trial support experience relevant to construction defect and claims matters. Leveraging from more than 25 years experience, BHA provides construction related trial support and expert services to the nation's most recognized construction litigation practitioners, Fortune 500 builders, commercial general liability carriers, owners, construction practice groups, and a variety of state and local government agencies.

    Building Expert News & Info
    Fairfield, Connecticut

    Colorado statutory “property damage” caused by an “occurrence”

    August 04, 2011 —

    Colorado General Assembly House Bill 10-1394 was signed into law by the Governor on May 21, 2010, codified at Colo. Rev. Stat. § 13-20-808 (2010)

    13-20-808. Insurance policies issued to construction professionals

    (1) (a) The general assembly finds and determines that:

    (I) The interpretation of insurance policies issued to construction professionals is of vital importance to the economic and social welfare of the citizens of Colorado and in furthering the purposes of this part 8.

    (II) Insurance policies issued to construction professionals have become increasingly complex, often containing multiple, lengthy endorsements and exclusions conflicting with the reasonable expectations of the insured.

    (III) The correct interpretation of coverage for damages arising out of construction defects is in the best interest of insurers, construction professionals, and property owners.

    Read the full story…

    Reprinted courtesy of CDCoverage.com

    Read the court decision
    Read the full story...
    Reprinted courtesy of

    California Insurance Commissioner Lacks Authority to Regulate Formula for Estimating Replacement Cost Value

    April 15, 2015 —
    In Assn. of Cal. Insurance Companies v. Jones ( No. B248622, filed 4/8/15), a California appeals court held that California’s Insurance Commissioner Dave Jones lacked the authority to promulgate California Code of Regulations, title 10, section 2695.183, which set out specific requirements for estimating replacement cost as part of any application or renewal for homeowners insurance. The regulation was promulgated in 2010 in response to complaints from homeowners who lost their homes in the wildfires in Southern California in 2003, 2007, and 2008, and who discovered that they did not have enough insurance to cover the full cost of repairing or rebuilding their homes because the insurers’ estimates of replacement value were too low when they purchased the insurance. Reprinted courtesy of Valerie A. Moore, Haight Brown & Bonesteel LLP and Christopher Kendrick, Haight Brown & Bonesteel LLP Ms. Moore may be contacted at vmoore@hbblaw.com Mr. Kendrick may be contacted at ckendrick@hbblaw.com Read the court decision
    Read the full story...
    Reprinted courtesy of

    Make Sure to Properly Perfect and Preserve Construction Lien Rights

    December 07, 2020 —
    If you recording a construction lien (referred to as a claim of lien) and looking to perfect your construction lien foreclosure rights, it is imperative that you work with counsel to ensure your rights are properly preserved. This is good practice! A claim of lien must be served on an owner within 15 days after recording. Florida Statute s. 713.08(4)(c) says: “The claim of lien shall be served on the owner. Failure to serve any claim of lien in the manner provided in s. 713.18 before recording or within 15 days after recording shall render the claim of lien voidable to the extent that the failure or delay is shown to have been prejudicial to any person entitled to rely on the service.” Florida Statute s. 713.18, hyperlinked for your review, includes the statutory ways to serve “notices, claims of lien, affidavits, assignments, and other instruments permitted or required under [Florida Statutes Chapter 713].” Read the court decision
    Read the full story...
    Reprinted courtesy of David Adelstein, Kirwin Norris, P.A.
    Mr. Adelstein may be contacted at dma@kirwinnorris.com

    Cybersecurity “Flash” Warning for Construction and Manufacturing Businesses

    April 05, 2021 —
    On March 23, 2021, the FBI’s Cyber Division issued a “Flash” warning for several business sectors, including industrial, commercial, manufacturing and construction businesses. The FBI is warning that a strain of ransomware, known as “Mamba,” has been used to weaponize a widely-used encryption software known as DiskCryptor. Mamba works through the open-source DiskCryptor program to encrypt a company’s operating system and demand ransom payment. This new ransomware attack is a threat to any business which employs DiskCryptor, specifically manufacturing and construction companies. What Should I Do? If your company utilizes DiskCryptor, the FBI suggests a number of recommendations to mitigate and ward off any ransomware attack. Most of these suggestions fall within the guidelines of proper cyber hygiene, and include (but are not limited to) the following:
    • Regularly back up data, as well as copies of data;
    • Segment your network;
    • Request administrator credentials to install software;
    Read the court decision
    Read the full story...
    Reprinted courtesy of Jeffrey M. Dennis, Newmeyer Dillion
    Mr. Dennis may be contacted at jeff.dennis@ndlf.com

    Determining Occurrence for Injury Under Commercial General Liability Policy Without Applying “Trigger Theory”

    July 19, 2021 —
    Oftentimes an occurrence in a commercial general liability policy is defined as “an accident, including continuous or repeated exposure to substantially the same general harmful conditions.” It is this occurrence that causes the bodily injury or property damage that may be covered by the policy. An interesting non-construction case determined an occurrence under a commercial general liability policy occurred when the negligent act occurred irrespective of the date of discovery or the date the claim was discovered or asserted. See Certain Underwriters at Lloyd’s, London Subscribing to Policy No. J046137 v. Pierson, 46 Fla.L.Weekly D1288c (Fla. 4thDCA 2021). This is interesting because the appellate court did NOT apply a “trigger theory” to first determine the occurrence’s policy period. The appellate court found it did not need to determine which “trigger theory” applied to determine the occurrence for the injury and relied on a cited case: “trigger theories are generally used in the context of deciding when damage occurred ‘in cases involving progressive damages, such as latent defects, toxic spills, and asbestosis’ because the time between the ‘injury-causing event (such as defective construction, a fuel leak, or exposure to asbestos), the injury itself, and the injury’s discovery or manifestation can be so far apart.” Pierson, supra, citing and quoting Spartan Petroleum Co. v. Federated Mut. Ins. Co., 162 F.3d 805, 808 (4th Cir. 1998). Read the court decision
    Read the full story...
    Reprinted courtesy of David Adelstein, Kirwin Norris, P.A.
    Mr. Adelstein may be contacted at dma@kirwinnorris.com

    Colorado Finally Corrects Thirty-Year Old Flaw in Construction Defect Statute of Repose

    March 29, 2017 —
    The Colorado Supreme Court has finally settled a decades-old conundrum surrounding the state’s construction defect statute of repose. A statute of repose is similar to a statute of limitations insofar as both restrict the time a party can bring a claim. A statute of repose period begins on a fixed date (such as the day someone finishes work on a project), while a statute of limitations period begins when someone discovers an injury (such as a defectively installed window). In 1986, at the height of the so-called “tort reform” movement, the Colorado General Assembly voted to shorten both the statute of repose and the statute of limitations for construction defect claims. Historically, Colorado’s statute of repose had given a homeowner ten years following construction to file an action, and its statute of limitations had required that any such action be filed within three years of the date that the claimant discovered a defect. After 1986, however, these time periods changed; the new statute of repose required suits to be filed within six years of the end of construction, and the new statute of limitations gave claimants only two years following discovery of the physical manifestation of a defect to seek legal relief.[1] Reprinted courtesy of Jesse Howard Witt, Acerbic Witt Mr. Witt may be contacted at www.witt.law Read the full story... Read the court decision
    Read the full story...
    Reprinted courtesy of

    When Construction Defects Appear, Don’t Choose Between Rebuilding and Building Your Case

    October 11, 2021 —
    When construction defects occur during construction, they intensify pressure from a schedule that may already be tight. Defects must be analyzed, confirmed, removed, and replaced and this can be time consuming. Or course, a construction schedule rarely anticipates defects, demolition, and rework and the owner will still expect the project to be completed on time; however, pressing forward with immediate remediation may have unintended consequences. Before starting demolition, consider the evidentiary doctrine of spoliation. Spoilation occurs when a party destroys or unreasonably deprives another party of evidence and courts have imposed sanctions on a party that deprives an opponent of evidence. The doctrine has historically concerned documents, but its application has extended to electronic data, and courts also apply it to building conditions in construction defects cases. So, before tearing out or fixing defective work, consider the need to allow the opposing party to inspect, test and document it. Imagine this scenario. The concrete in a slab placed by your subcontractor shows low compressive strength results in the 28-day cylinder tests. Tearing out the slab and replacing it will put you at least a month behind schedule and you don’t want to waste any time before removing and replacing it. Nevertheless, while you’re rebuilding the defective slab, be mindful that you are also building a case. If you plan to recover the costs you incur because of the defective concrete from the responsible parties, you should allow the subcontractor (and possibly the concrete supplier and other implicated parties) to examine, preserve, and/or test the work in question. Failure to do so may subject you to spoliation sanctions and jeopardize your right to recover damages. Read the court decision
    Read the full story...
    Reprinted courtesy of Curtis Martin, Peckar & Abramson
    Mr. Martin may be contacted at cmartin@pecklaw.com

    Delays and Suspension of the Work Under Fixed Price Government Contract

    July 22, 2024 —
    Here is an interesting fact pattern and case decided by the Civilian Board of Contract Appeals dealing with (1) force majeure type events and epidemics (Covid-19); (2) suspension of the work; and (3) delays. These are three topics important to all contractors including federal contractors. In Lusk Mechanical Contractors, Inc. v General Services Administration, 2024 WL 1953697, CBCA 7759 (CBCA 2024), a contractor entered into a fixed price contract with the government to repair, replace, and modernize site and building systems at a federal building. The contractor commenced work right before Covid-19. When Covid-19 hit, the government issued the contractor a two-week suspension of work notice on March 27, 2020. The suspension of work allowed off-site administrative work to continue but suspended on-site physical work. The government extended the suspension of work three more times. The contractor could resume work on the exterior on June 1, 2020, but was not permitted to resume work on the interior until July 20, 2020. On the same date that the contractor was able to commence interior work, it submitted a modification for delay caused by the suspension – 64 days for the time period the entire site shutdown, and 51 days for the interior work shutdown. Read the court decision
    Read the full story...
    Reprinted courtesy of David Adelstein, Kirwin Norris, P.A.
    Mr. Adelstein may be contacted at dma@kirwinnorris.com