Quick Note: Do Your Homework When it Comes to Selecting Your Arbitrator
July 26, 2017 —
David Adelstein - Florida Construction Legal UpdatesMany construction contracts contain arbitration provisions. Instead of litigating a dispute arising out of the contract, the parties will arbitrate the dispute per the arbitration provision. There are advantages to arbitration and certain disputes bode well for arbitration. The key is you want to make sure you select the RIGHT arbitrator or arbitrators. Do your homework regarding the arbitrator list presented to you by, say, the American Arbitration Association. Strike out those on the list that either do not have the requisite experience you need to decide the dispute or you believe they are not going to be impartial. For instance, if you want an arbitrator that you think will specifically follow the letter of the law or the precise terms of a contract, select those on the list that meet this requirement; strike out others that do not. The same philosophy would apply if you want an arbitrator to have specific factual knowledge or a factual understanding regarding a driving issue in the dispute. Do not neglect the homework required to select –or try to select — the arbitrator you believe is the most qualified to understand the issues.
Now, why is this important? It is important because you need to arbitrate a dispute with the understanding that the arbitrator’s award (decision) is FINAL. There are no appellate rights. None. Vacating an arbitrator’s award is very challenging and the bases to vacate an award are limited and, most of the time, will NOT apply.
Read the court decisionRead the full story...Reprinted courtesy of
David Adelstein, Florida Construction Legal UpdatesMr. Adelstein may be contacted at
Dadelstein@gmail.com
An Obligation to Provide Notice and an Opportunity to Cure May not End after Termination, and Why an Early Offer of Settlement Should Be Considered on Public Works Contracts
August 17, 2020 —
Jeff Kaatz - Ahlers Cressman & SleightIn 2015, the City of Puyallup (“City”) and Conway Construction Company (“Conway”) executed a public works contract for road improvements (“Project”). On March 9, 2016, approximately four months after work started on the Project, the City issued Conway a notice of suspension and breach of contract and identified nine defective and uncorrected work and safety concerns. Conway denied any wrongdoing, and on March 25, 2016, the City issued a notice of termination for default and withheld payments due to Conway.
Conway subsequently filed suit in Pierce County Superior Court and alleged the City’s termination for default breached the contract and sought a determination that the City’s termination for default was improper and should be deemed a termination for convenience. Conway sought approximately $1.25 million in damages and recovery of its attorney fees and costs. Following a bench trial, the Trial Court found the City breached the contract and awarded Conway damages, attorney fees, and costs. The City appealed.[1]
On appeal, after affirming the trial court’s determination that the City improperly terminated Conway, the Court of Appeals considered two other issues raised by the City. First, whether the City was entitled to a set-off for replacing defective work discovered after Conway was terminated. Second, whether Conway is entitled to attorney fees if it did not make the statutorily required offer of settlement per RCW 39.04.240.
Read the court decisionRead the full story...Reprinted courtesy of
Jeff Kaatz, Ahlers Cressman & SleightMr. Kaatz may be contacted at
Jeff.Kaatz@acslawyers.com
Taking Care of Infrastructure – Interview with Marilyn Grabowski
February 06, 2019 —
Aarni Heiskanen - AEC BusinessMarilyn Grabowski leads Atlantic Infrared with a mission to protect and improve infrastructure. In this interview, we discuss her professional background, the technologies that her team uses, and why more women should consider construction as a career.
Marilyn Grabowski, known as “The Lady in Red”, and her team Atlantic Infra employees dubbed “The Red Crew” have been seamlessly filling potholes across the state of New Jersey since 2002. Under her leadership, The Red Crew uses infrared technology and unfailing attention to detail to expertly repair potholes, failed utility cuts and sunken trenches with no break in the road – creating safe and aesthetically pleasing repairs statewide, at a clip of 15,000 potholes per year.
Read the court decisionRead the full story...Reprinted courtesy of
Aarni Heiskanen, AEC BusinessMr. Heiskanen may be contacted at
aec-business@aepartners.fi
Bert L. Howe & Associates Brings Professional Development Series to Their San Antonio Office
March 28, 2014 —
Beverley BevenFlorez-CDJ STAFFMirroring similar seminars currently provided in other regional markets, BHA’s Professional Development Series provides seminar attendees with a heightened level of knowledge and understanding on a wide range of subjects covering construction and construction defect litigation, tailored to the unique needs of local counsel and insureds.
The first seminar in this series will be presented on May 9th, and is entitled THE RESIDENTIAL CONSTRUCTION PROCESS & CONSTRUCTION DEFECT LITIGATION.
This course has been approved for Minimum Continuing Legal Education credit by the State Bar of Texas Committee on MCLE in the amount of 1.0 credit hours, of which 0.0 credit hours will apply to legal ethics/professional responsibility credit.
The seminar will be presented by Don MacGregor, general contractor and project manager, at BHA’s San Antonio office during the noontime hour, and luncheon will be provided. As with all BHA Professional Development activities, there is no cost for participation.
Water intrusion through doors, windows and roofing systems, as well as soil and foundation-related movement, and the resultant damage associated therewith, are the triggering effects for the vast majority of homeowner complaints today and serve as the basis for most residential construction defect litigation.
The graphic and animation-supported workshop/lecture activity will focus on the residential construction process from site preparation through occupancy, an examination of associated damages most often encountered when investigating construction defect claims, and the inter-relationships between the developer, general contractor, sub trades and design professionals.
Typical plaintiff homeowner/HOA expert allegations will be examined in connection with those building components most frequently associated with construction defect and claims litigation.
The workshop will examine:
* Typical construction materials, and terminology associated with residential construction
* The installation process and sequencing of major construction elements, including interrelationship with other building assemblies
* The parties (subcontractors) typically associated with major construction assemblies and components
* The various ASTM standard testing protocols utilized to field test buildings
* An analysis of exposure/allocation to responsible parties
Attendance at THE RESIDENTIAL CONSTRUCTION PROCESS & CONSTRUCTION DEFECT LITIGATION seminar will provide the attendee with:
* A greater understanding of the terms and conditions encountered when dealing with common construction defect issues
* A greater understanding of contractual scopes of work encountered when reviewing construction contract documents
* The ability to identify, both quickly and accurately, potentially responsible parties
* An understanding of damages most often associated with construction defects, as well as a greater ability to identify conditions triggering coverage
* Assistance in the satisfaction of important continuing education requirements.
Course #: 901290467 / Sponsor #: 14152
To register for the event, please email Don MacGregor at dmac@berthowe.com.
Read the court decisionRead the full story...Reprinted courtesy of
Denver Airport Terminates P3 Contract For Main Terminal Renovation
November 12, 2019 —
Mark Shaw - Engineering News-RecordIn a move that stunned transportation planners around the country, Denver International Airport terminated the contractor team working on a $650-million terminal renovation. The move also ended the airport’s $1.8-billion public-private partnership with Great Hall Partners, a consortium led by Ferrovial Airports, with partners Saunders/JLC Infrastructure.
Mark Shaw, Engineering News-Record
Mr. Shaw may be contacted at shawm@enr.com
Read the full story... Read the court decisionRead the full story...Reprinted courtesy of
Superior Court Of Pennsylvania Holds That CASPA Does Not Allow For Individual Claims Against A Property Owner’s Principals Or Shareholders
January 07, 2015 —
William J. Taylor and Michael Jervis – White and Williams LLPIn Scungio Borst Assocs. v. 410 Shurs Lane Developers, LLC, the Superior Court of Pennsylvania held that an individual principal/shareholder of a property owner could not be held personally liable as an “agent of the owner” for unpaid invoices, penalties, and attorneys fees under the Pennsylvania Contractor and Subcontractor Payment Act (CASPA), 73 P.S. §§ 501-516, even though the property owner itself had failed to make payments allegedly due under a construction contract.
CASPA is a Pennsylvania statute which is designed to protect contractors and subcontractors from nonpayment and which, to that end, establishes rules and deadlines for payment under construction contracts between property owners, contractors, and subcontractors. An owner or contractor who does not adhere to the Act’s payment requirements is subject to the imposition of interest, penalties, and attorneys’ fees. In this recent case, the property owner, a limited liability company, had retained the plaintiff contractor to perform construction services on a condominium project. Upon completion of the work, the contractor was not paid approximately $1.5 million that it was owed under the contract. The contractor filed suit under CASPA to obtain the payment it was owed plus interest, penalties and fees, and named both the property owner and its individual principal as defendants. The trial court granted summary judgment to the individual principal on all claims asserted against him, and the contractor appealed, arguing that CASPA allows for claims against both a property owner and its principal when the principal is an “agent of the owner acting with the owner’s authority.”
Reprinted courtesy of
Michael Jervis, White and Williams LLP and
William J. Taylor, White and Williams LLP
Mr. Jervis may be contacted at jervism@whiteandwilliams.com; Mr. Taylor may be contacted at taylorw@whiteandwilliams.com
Read the court decisionRead the full story...Reprinted courtesy of
Helsinki Stream City: A Re-imagining Outside the System
August 13, 2019 —
Jenni Ripatti - AEC BusinessModern man lives under the illusion of being the most intelligent being out there. This is the paradox of human nature; we all want to make the best decisions with the knowledge we have at any given time, but on the other hand, our thinking is largely based on how our ancestors organized the world in their time.
Possibly the most tangible example of this in our everyday lives is infrastructure. While there seems to be plenty of candidates offering new solutions to the already existing urban environment, there are not that many looking to challenge the current urban order. Cities are full of talk—but who walks the walk?
Re-imagining Urban Environments
Olli Hakanen, a long-term specialist in re-imagining workspaces and urban environments, has an extensive background in both architecture and consultancy. His latest venture, Respace, aims to address how urban environments are being developed to better suit the needs of their residents as well as the environment. According to the ideology behind Respace, instead of always building something new, often all that is needed is a re-thinking.
Read the court decisionRead the full story...Reprinted courtesy of
Jenni Ripatti, AEC BusinessAEC Business may be contacted at
info@aec-business.com
Sales of New U.S. Homes Surged in August to Six-Year High
September 24, 2014 —
Jeanna Smialek – BloombergNew-home sales in the U.S. surged in August to the highest level in more than six years, a sign that the housing recovery is making progress.
Purchases of new houses jumped 18 percent to a 504,000 annualized pace, the strongest since May 2008 and surpassing the highest forecast in a Bloomberg survey of economists, Commerce Department figures showed today in Washington. The one-month increase was the biggest since January 1992.
The housing market is improving in fits and starts this year amid slow wage growth and tight credit conditions. Sustained improvement in the job market will be needed to push up pay and sustain a stronger recovery.
Read the court decisionRead the full story...Reprinted courtesy of
Jeanna Smialek, BloombergMs. Smialek may be contacted at
jsmialek1@bloomberg.net