Beverley BevenFlorez-CDJ STAFFDespite a “no cracks” welding code and contract provision for the San Francisco-Oakland Bay Bridge, in 2008 Caltrans proceeded with the project despite welding cracks created by the Chinese firm hired to build the roadway, according to the Sacramento Bee. By the time the cracks had been discovered, the costs were at $6.5 billion and climbing, and fixing the cracks would be time-consuming and expensive.
However, there is some dispute as to rather the welding “cracks represent a hazard to the traveling public.”
“Examine history,” Brian Maroney, Caltrans’ chief engineer for the bridge, said in a recent interview by the Sacramento Bee. “… Caltrans reviewed major quakes around the globe and never found a case in which weld cracks caused bridge-roadway fractures.”
However, the Sacramento Bee reported that there was a case where welding cracks led to fractures. For instance, after the southern California earthquake in 1994 centered in Northridge, the Santa Clara River Bridge “suffered several fractures in steel girders. The breaks were traced to tiny cracks in welds, likely present before the quake, and worsened by vibrations of heavy trucks passing overhead. When the quake struck, the girders fractured.”
The Santa Clara bridge did not collapse. Sacramento Bee claimed it remained standing because the I-beam-shaped girders were “not fracture-critical.” However, the Bay Bridge’s “roadway consists of box-girder segments welded together. In effect, they create one contiguous, fracture-critical girder,” Abolhassan Astaneh-Asl, UC Berkeley engineering professor told the Sacramento Bee. “If welds crack and grow rapidly during a large quake, the entire roadway could fail.”
Read the court decisionRead the full story...Reprinted courtesy of
Damages or Injury “Likely to Occur” or “Imminent” May No Longer Trigger Insurance Coverage
January 05, 2017 —
Masaki J. Yamada – Ahlers & Cressman PLLCWashington Courts allow an insurer to determine its duty to defend an insured against a lawsuit based only on the face of the complaint and the limitations of the insurance policy. This is otherwise known as the “eight corners” rule (four corners of the complaint plus the four corners of the policy). In other words, the insurance company is not permitted to rely on facts extrinsic to the complaint in order to deny its duty to defend an insured. See Truck Ins. Exch. v. VanPort Homes, Inc., 147 Wn.2d 751, 763 (2002). The laws in Washington provide greater protection to the insured over the insurer when it comes to the insurer’s duty to defend. The duty to defend a claim is triggered if a claim could “conceivably” be covered under the policy. See Woo v. Fireman’s Insurance, 161 Wn.2d 43 (2007). If there is any ambiguity in a policy with regard to coverage, the ambiguity is interpreted in favor of the insured.
As a result, contractors in Washington regularly tender claims or potential claims to their insurers even when damage has not occurred but will occur in the imminent future. Especially in the context of construction defect cases, a contractor will tender such a claim to its insurer to trigger the broad duty of the insurer to provide a defense. We also regularly recommend this to our contractor clients. For example, if a building owner serves a contractor with a claim that the construction and installation of a window system will imminently cause leaks and corrosion, we would recommend that the contractor tender the claim to its commercial general liability insurer. Washington courts have found a duty to defend when there are allegations in the complaint that covered damages will occur in the imminent future.
Read the court decisionRead the full story...Reprinted courtesy of
Masaki J. Yamada, Ahlers & Cressman PLLCMr. Yamada may be contacted at
myamada@ac-lawyers.com
Are COVID-19 Claims Covered by Builders Risk Insurance Policies?
May 04, 2020 —
Jason M. Adams, Gibbs Giden Locher Turner Senet & Wittbrodt LLP and Cheryl L. Kozdrey, Saxe Doernberger & Vita, P.C.If you are an attorney, insurance broker, or other professional representing developers and contractors, then your clients have likely reached out with concerns about losses related to COVID-19. One common question is whether there is potential coverage under builders risk insurance policies.
The short answer is: It depends. As with most questions pertaining to insurance coverage, the answers depend on the specific policy language and underlying facts required to trigger coverage. Builders risk policies are even more fact specific due to the lack of uniformity of base policy forms and endorsements between insurance carriers.
The first step in any analysis is to gather facts and carefully document any impending and potential damages or delays. The facts are crucial because the coverage analysis may vary depending on the specific reason the project was shut down. For example, the analysis would be different if the project was shut down as a result of an express government order, such as those in Northern California and Washington, versus the project shutting down as a result of workers testing positive for COVID-19. Properly analyzing builders risk coverage involves a granular account of the facts and damages, and can require a great deal of hair splitting with respect to specific policy language.
Regardless of the strength of the insured’s facts and damages, or the breadth of its policy language, the policyholder still likely faces an uphill battle in finding coverage for COVID-19 related claims. The unfortunate reality of most builders risk policies is that they are property policies that require some evidence of physical loss or damage to trigger coverage. Whether or not COVID-19 claims constitute property damage will be the subject of great debate and litigation over the coming months and years. The outcome will likely depend on how the insured’s jurisdiction ultimately rules on the litany of COVID-19 cases that have already been filed – specifically, how broadly each court interprets the meaning of “physical loss or damage.”
Although these key issues have yet to be clearly defined by the courts, some policies are better than others and there are specific variables that could affect the likelihood of coverage. For example, some of the more policyholder-friendly insurance programs may contain coverage extensions for delay in completion, business interruption, loss of rental income, or civil authority that may not be tied to the property damage requirement, and which would tend to support coverage for COVID-19 claims.
Even if the insured crosses the initial threshold and can demonstrate a covered claim, the following common endorsements and exclusions may require additional analysis depending on the facts.
- Virus or Pandemic Exclusions: Virus or pandemic exclusions are not as common on builders risk policies as they may be on other forms of coverage. However, they do exist and, if present, result in a significant barrier to coverage. As with the policy itself, every endorsement is different and should be analyzed in terms of the express language contained in the endorsement and the facts.
- Abandonment or Cessation of Work: Most builders risk policies include provisions that preclude coverage in the event of the abandonment of the project or a lengthy cessation of work. As a result, the insured should take steps to articulate to the carrier that the project has not been abandoned, and that there exists an intent to return as soon as possible. The insured should also maintain a record of ongoing project oversight and protection efforts taken during the period when construction operations are suspended.
- Security and Safety Requirements: Many builders risk policies contain provisions requiring the insured to maintain protective safeguards and security protocols throughout the pendency of the project. Safety fencing, lighting and security guards are common examples. The policy should be analyzed to ensure that the policyholder can meet any such requirements during a COVID-19 related shutdown. For example, can the insured continue to staff a security guard? If not, arrangements will likely need to be made with the carrier depending on the language of the policy.
- Insurable Limits: Builders risk policies are typically underwritten based upon the total completed value of the structure, including materials and labor. The insured will need to analyze the policy to consider whether increased material or labor costs as a result of COVID-19 will alter the terms of coverage, trigger any escalation clauses, or result in an increase in premium due. If increased cost projections become apparent, the insured should report these changes to the carrier immediately.
- Extensions of Coverage: The insurance industry was facing a hard market even before the COVID-19 pandemic, which resulted in higher premiums and limited coverage options. The COVID-19 pandemic has only exacerbated these issues and it may be difficult to obtain coverage extensions on projects that have been shut down. The insured should work with its risk management team (risk manager, insurance broker and lawyer) to engage the carriers to negotiate any necessary coverage extensions resulting from COVID-19 related project delays.
To summarize, builders risk coverage for COVID-19 claims is far from certain, but not impossible. Insureds should provide notice of a claim to all potentially applicable carriers in order to preserve their rights. The insured should also report increased construction cost and articulate its intent to return to the project to preserve their escalation clause and avoid arguments that they have abandoned the project. The insured should continue to document its claims and damages, and be ready to substantiate its claims and push back on any coverage denial. Throughout the entirety of this process, the insured should work with its risk management team to get out in front of any extensions it may need to complete the project. In a climate where insurance carriers are receiving an insurmountable number of claims, the insured should be prepared to fight for coverage and not simply throw up its hands in the face of a denial. Given the intense social, legislative and executive pressure to cover COVID-19 claims, there may be a tendency for the courts to find coverage in gray areas, particularly if the insured was fortunate enough to have purchased one of the broader coverage forms referenced above.
About the Authors
Jason M. Adams, Esq. (jadams@gibbsgiden.com) is a partner at Gibbs Giden representing construction professionals in the areas of Construction Law, Insurance Law and Risk Management and Business/Civil Litigation. Adams is also a licensed property and casualty insurance broker and certified Construction Risk & Insurance Specialist (CRIS). Jason represents developers, contractors, public entities, investors, lenders, REITs, design professionals, and other construction professionals at all stages of the construction process. Jason is a published author and sought-after speaker at seminars across the country regarding high level construction risk management and insurance topics. Gibbs Giden is nationally and locally recognized by U. S. News and Best Lawyers as among the “Best Law Firms” in both Construction Law and Construction Litigation. Chambers USA Directory of Leading Lawyers has consistently recognized Gibbs Giden as among California’s elite construction law firms.
Cheryl L. Kozdrey, Esq. (clk@sdvlaw.com) is an associate at Saxe Doernberger & Vita, P.C., a national insurance coverage law firm dedicated exclusively to policyholder representation and advocacy. Cheryl advises insurance brokers, risk managers, and construction industry professionals regarding optimal risk transfer strategies and insurance solutions, including key considerations for Builder’s Risk, Commercial General Liability, D&O, and Commercial Property policies. She assists clients with initial policy reviews, as well as renewals and modification(s) of existing policies to ensure coverage needs are satisfied. Cheryl also represents policyholders throughout the claims process, and in coverage dispute litigation against insurance carriers. She is currently working on some of the largest construction defect cases in the country. Cheryl is a published author and is admitted to practice in the State of California and all federal district courts within the State.
Read the court decisionRead the full story...Reprinted courtesy of
Insurer Incorrectly Relies Upon "Your Work" Exclusion to Deny Coverage
June 10, 2019 —
Tred R. Eyerly - Insurance Law HawaiiThe Eleventh Circuit reversed the district court's determination that there was no coverage based upon the policy's "your work" exclusion. Southern-Owners Ins. Co. v. Mac Contractors of Fla, LLC, 2019 U.S. App. LEXIS 10689 (11th Cir. April 11, 2019).
Mac Contractors contracted with the homeowners to custom build their home. After construction began, Mac left the site before completing the project and before the issuance of a certificate of occupancy. The homeowners sued, alleged damage to wood floors and the metal roof.
Southern-Owners originally agreed to defend under the CGL policy, but later withdrew the defense and filed this action for declaratory relief. The parties cross-filed motions for summary judgment. Southern-Owners argued that the "your work" exclusion applied to bar coverage. The "your work" exclusion barred coverage for "'property damage' to 'your work' arising out of it or any part of it and included in the 'products' completed operations hazard.'" The "products' completed operations hazard" included all "'property damage' occurring away from premises you own or rent and arising out of . . . 'your work' except . . . (1) products that are still in your physical possession; or (2) work that has not yet been completed or abandoned."
Read the court decisionRead the full story...Reprinted courtesy of
Tred R. Eyerly, Damon Key Leong Kupchak HastertMr. Eyerly may be contacted at
te@hawaiilawyer.com
Los Angeles Is Building a Future Where Water Won’t Run Out
February 28, 2022 —
Brian Eckhouse & Laura Bliss - BloombergA helicopter whisks off a rooftop in downtown Los Angeles, climbs above a thin layer of haze and soars over barren mountains past the city’s edge. Soon, scars of climatic stress are evident to L.A. Mayor Eric Garcetti and Martin Adams, general manager and chief engineer of the city’s water and power department, as they peer out the windows. Trees torched years ago by wildfire. Flats parched by sun and little precipitation.
It’s another July scorcher, days after California Governor Gavin Newsom asked residents to conserve amid one of the worst droughts on record. The crisis spans across the southwestern U.S. Outside Las Vegas, the enormous Lake Mead reservoir that feeds the Golden State as well as Nevada and Arizona plunged in June to its lowest level since 1937. In August, federal officials ordered the first-ever water cuts on a Colorado River system that sustains about 40 million people. Even after pounding holiday storms, 64% of the land in Western states was still experiencing severe to exceptional drought in January, which is on track to be the driest on record in some parts.
Reprinted courtesy of
Brian Eckhouse, Bloomberg and
Laura Bliss, Bloomberg Read the court decisionRead the full story...Reprinted courtesy of
Mediating Contract Claims and Disputes at the ASBCA
December 20, 2021 —
Brian Waagner - Construction ExecutiveThe Contract Disputes Act establishes the formal process for resolving nearly all claims and disputes that arise under federal government contracts. It is the source of the requirement that contractors certify claims in excess of $100,000, the contracting officer’s final decision and the deadlines for bringing a dispute to the court of federal claims or an agency board of contract appeals.
It is also the source of the federal government’s authority to use mediation and other forms of alternative dispute resolution. Here are six key factors contractors should know about mediating contract claims and disputes at the Armed Services Board of Contract Appeals (ASBCA).
1. The Parties Control the Parameters of ADR Proceedings
Many commercial contracts and court rules require mediation of every dispute. There is no settlement meeting, mediation or any other type of mandatory ADR proceedings in cases brought to the ASBCA. The parties control the process, and they may adopt any approach to ADR that they believe will be effective. Mediation is nevertheless voluntary. Without the agreement of both parties, it won’t happen.
Reprinted courtesy of
Brian Waagner, Construction Executive, a publication of Associated Builders and Contractors. All rights reserved.
Read the court decisionRead the full story...Reprinted courtesy of
Contractors Pay Heed: The Federal Circuit Clarifies Two Important Issues For Bid Protestors
September 13, 2021 —
Andrew Balland - ConsensusDocsThe United States Court of Appeals for the Federal Circuit (Federal Circuit) recently decided two cases that are relevant to many disappointed offerors considering a bid protest. One decision rendered in March 2021 confirmed the authority of the United States Court of Federal Claims (COFC) to hear a protest based on an agency’s breach of an implied-in-fact contract. A second decision issued in February 2021 reversed a COFC decision from last year regarding the timeliness requirements to obtain a CICA stay and their interplay with Department of Defense (DoD) enhanced debriefing regulations.
Federal Circuit Confirms The Court Of Federal Claims’ Jurisdiction Over Procurement-Related Implied Contract Claims
When a contractor’s bid protest is denied by the Government Accountability Office (GAO), the unsuccessful protestor may challenge the GAO’s decision as arbitrary and capricious in an action before the COFC. While 28 U.S.C. § 1491(b)(1) authorizes the COFC to hear such procurement-related challenges, § 1491(a) also permits the court to adjudicate claims against the United States based on any express or implied contracts.
Read the court decisionRead the full story...Reprinted courtesy of
Andrew Balland, Watt, Tieder, Hoffar & Fitzgerald, LLP
Insured's Failure to Prove Entire Collapse of Building Leads to Dismissal
July 19, 2021 —
Tred R. Eyerly - Insurance Law HawaiiThe Fifth Circuit affirmed the district court's dismissal of the insured's claim for damage to her home caused by collapse. Stewart v. Metropolitan Lloyds Ins. Co. of Texas, 2021 U.S. App. LEXIS 14221 (5th Girl May 13, 2021).
One evening, the insured was awakened by a loud bang that shook her house. The next morning, she noticed the damage to her home, cracked sheetrock and sunken floors. She cut a hole through her floor and discovered that a couple of joists below her subfloor had broken and fallen away. The insured filed a claim with Metropolitan.
Metropolitan hired an expert who found broken and deteriorated floor joists, deteriorated floor decking, walls not plumb and gaps in the wall-to-ceiling interface. It was determined that the rot in the floor joists and subfloor decking were caused by a combination of termite damage and exposure to moisture over the lifespan of the structure, resulting in the broken floor joists and unlevel floors. The insured's own expert agreed that termite damage and wood rot were the cause of the foundation collapse failure.
Read the court decisionRead the full story...Reprinted courtesy of
Tred R. Eyerly, Damon Key Leong Kupchak HastertMr. Eyerly may be contacted at