Second Circuit Certifies Question Impacting "Bellefonte Rule"
December 15, 2016 —
Ellen Burrows – White and Williams LLPCalling into question the continued validity of the so-called “Bellefonte Rule,” on December 8, 2016, the United States Court of Appeals for the Second Circuit certified to the New York Court of Appeals the question whether a facultative reinsurance contract limit is presumptively all-inclusive and “caps” the reinsurer’s total exposure even where the reinsured policy pays defense costs in addition to the limit. Global Reinsurance Corporation v. Century Indemnity Company Docket No. 15-2164-cv (December 8, 2016).[1]
In Bellefonte Reinsurance Company v. Aetna 903 F.2d 910 (2d Cir. 1990), the court ruled that a reinsurer was not liable to pay defense costs above the stated reinsurance contract limit. Although litigants argued that this ruling was dependent on the fact that the reinsured policy limits were defense cost-inclusive, a later panel of the Second Circuit applied the “cap” ruling in Bellefonte to a situation where the reinsured policy limit was not cost-inclusive and where the insurer was obligated to pay defense costs in addition to the policy limit. Unigard Security Insurance Company v. North River Insurance Company 4 F.3d 1049 (2d Cir. 1993).
Read the court decisionRead the full story...Reprinted courtesy of
Ellen Burrows, White and Williams LLPMs. Burrows may be contacted at
burrowse@whiteandwilliams.com
California Court of Appeal Holds a Tenant Owes No Duty to Protect a Social Guest From a Defective Sidewalk Leading to a Condominium Unit
May 22, 2023 —
Garrett A. Smee & Lawrence S. Zucker II - Haight Brown & Bonesteel LLPOn May 5, 2023, the California First District Court of Appeal, Division One, issued an opinion in Moses v. Roger-McKeever (A164405), holding that a condominium tenant owes no duty to a social guest using a walkway that leads to the unit.
Eleanor Moses fell on a walkway outside a condo rented by Pascale Roger-McKeever. Moses would not have used the walkway but for Roger-McKeever’s invite to a small gathering for members of a political activist group. Upon entering the condo for the event that night, Moses brought to Roger-McKeever’s attention the poor lighting in the entryway. Roger-McKeever apologized, and stated that her landlord had delayed repairing the porch light. The accident supposedly happened on a short walkway that had three steps leading away from a street sidewalk. Supposedly, Moses tripped on the second step while leaving the social gathering because of the poor lighting.
Reprinted courtesy of
Garrett A. Smee, Haight Brown & Bonesteel and
Lawrence S. Zucker II, Haight Brown & Bonesteel
Mr. Smee may be contacted at gsmee@hbblaw.com
Mr. Zucker may be contacted at lzucker@hbblaw.com
Read the court decisionRead the full story...Reprinted courtesy of
Home Builders and Developers Beware: SC Supreme Court Beats Up Hybrid Arbitration Clauses Mercilessly
November 15, 2022 —
Matthew Devries - Best Practices Construction LawToday’s guest post is by one of my favorite construction lawyers and friends, Burr partner Ned Nicholson in our Columbia, SC office. Ned regularly represents clients in construction defect and compensation claims, manufacturer/dealer disputes, and insurance coverage lawsuits. He is also a South Carolina certified mediator. Ned can be reached at nnicholson@burr.com or (803) 799-9800.
If you are a homebuilder, residential housing developer, construction industry insurer, or any one of the many participants in the industry providing affordable and decent housing for the citizens of South Carolina, you are already aware that South Carolina courts have for decades prioritized the promotion of consumer (i.e., home buyer) rights, usually at the expense of the providers of housing. There is nothing inherently wrong with that; the goal is laudable. But as in so many things, the implementation has been extremely costly for the residential construction industry as a savvy plaintiff’s bar has taken advantage of grey areas that are inevitably created in our judicial system.
Read the court decisionRead the full story...Reprinted courtesy of
Matthew Devries, Burr & Forman LLPMr. Devries may be contacted at
mdevries@burr.com
What to Do Before OSHA Comes Knocking
December 19, 2018 —
Parker Rains - Construction ExecutiveEvery year, the U.S. Occupational Safety and Health Administration (OSHA) inspects workplaces around the country for safety and occupational hazards. In 2017 alone, OSHA conducted 32,408 inspections – more than half of which were unprogrammed inspections.
There are six reasons OSHA might come knocking on the door. They are (in order of priority):
- imminent danger situations;
- severe injuries and illnesses;
- worker complaints;
- referrals;
- targeted inspections; and
- follow-up inspections.
Reprinted courtesy of
Parker Rains, Construction Executive, a publication of Associated Builders and Contractors. All rights reserved.
Read the court decisionRead the full story...Reprinted courtesy of
Mr. Rains may be contacted at
prains@fbbins.com
Construction Law Alert: A Specialty License May Not Be Required If Work Covered By Another License
March 07, 2011 —
Steven M. CvitanovicContractors should always be sure that they understand the licensing in any Subcontract or Prime Contract before entering into any agreement. However, on March 3, 2011, in the case of Pacific Casson & Shoring, Inc. v. Bernards Bros., Inc. 2011 Cal.App.Lexis 236, the Court of Appeal determined that if a specialty license is subsumed within another license, the specialty license may not be required.
Bernards entered into a subcontract with Pacific to excavate, backfill, grade and provide geotechnical design parameters for a hospital. The Prime Contract required the bidder to maintain a Class C-12 specialty earthwork license. However, Pacific only held a Class A general engineering license which it turns out was suspended during the performance of the work. Pacific sued Bernards for nonpayment of $544,567, but the lawsuit was dismissed because the trial court found that Pacific (1) lacked a C-12 license, and (2) Pacific’s Class A license was suspended for failure to pay an unrelated judgment. Pacific was also ordered to disgorge $206,437 in prior payments.
The Court of Appeal reversed and remanded. The Court of Appeal agreed with Pacific and held that a C-12 specialty license was not required despite the Prime Contract. The Court of Appeal found that the C-12 specialty license would have been “superfluous” since it was fully encompassed within the Class A requirements. However, the Court of Appeal also remanded the case for further
Read the full story...
Reprinted courtesy of Steve Cvitanovic of Haight Brown & Bonesteel, LLP.
Read the court decisionRead the full story...Reprinted courtesy of
OSHA/VOSH Roundup
August 31, 2020 —
Christopher G. Hill - Construction Law MusingsIn an unusual flurry of occupational safety related activity, the Virginia courts decided two cases in the last week relating to either the review of occupational safety regulations themselves or their enforcement.
In Nat’l College of Business & Technology Inc. v. Davenport (.pdf), the Virginia Court of Appeals considered what constitutes a “serious” violation of the exposure to asbestos Virginia Occupational Safety & Health (VOSH) regulations. The facts found by the Salem, Virginia Circuit Court were that employees of the petitioner college were exposed to asbestos insulation when they were required to enter a boiler room to retrieve paper files. However, no evidence was presented regarding the length of time or level of exposure at the Circuit Court level. Despite the lack of evidence regarding the level or extent of exposure, the Circuit Court upheld the VOSH citation for exposure and the level of violation at a “serious” level with the attendant penalty.
The Virginia Court of Appeals disagreed with the second finding. The appellate court determined that the lack of evidence regarding the level of exposure (whether length or extent) made the serious level violation an error. The Court stated that merely presenting evidence that asbestos is a carcinogen is not enough given the number of carcinogenic materials in existence and then remanded the case back to Circuit Court to reconsider the penalty level.
Read the court decisionRead the full story...Reprinted courtesy of
The Law Office of Christopher G. HillMr. Hill may be contacted at
chrisghill@constructionlawva.com
Smart Home Products go Mainstream as Consumer Demand Increases
November 05, 2014 —
Beverley BevenFlorez-CDJ STAFFGigaom reported that Wal-Mart announced yesterday that they will begin selling Insteon gear, one of the Smart Home products, in 1,500 of its stores across the country. "The products in store will include a starter kit, motion sensors, dimmers, IP cameras, LED bulbs, leak sensors and door/window sensors among others. Wal-Mart also sells Chamberlain gear and a few other connected devices on its web site." According to Builder, a Savant survey demonstrated that "Americans are eager for home automation, proving that technology is a great way for builders to distinguish their new homes from the rest of the market."
In another article, Gigaom announced that Netgear will be introducing a line of Smart Home products under the name Arlo.
Read the full story, Gigaom, Wal-Mart now sells Insteon gear...
Read the full story, Gigaom, Netgear launches its Arlo smart home brand with a camera...
Read the full story, Builder... Read the court decisionRead the full story...Reprinted courtesy of
Back to Basics – Differing Site Conditions
December 19, 2018 —
Tracey W. Pruiett - Smith CurrieEncountering an unexpected site condition is one of the more common risks on a construction project. A “differing site condition”, or it is sometimes called a “changed condition”, is generally understood to be a physical condition that is discovered while performing work and that was not visible or otherwise expected at the time of bidding. Often, the condition could not have been discovered by a reasonable site investigation. Examples of common differing site conditions include: soil with inadequate bearing capacity to support the building being constructed, soil that cannot be reused as structural fill, unanticipated groundwater, quicksand, mud, rock formations, or other artificial subsurface obstructions. Differing site conditions may also occur within the walls or ceilings of a renovation project such as the renovation of a hospital or historic building.
Read the court decisionRead the full story...Reprinted courtesy of
Tracey W. Pruiett, Smith CurrieMs. Pruiett may be contacted at
twpruiett@smithcurrie.com