Nine Haight Attorneys Selected for Best Lawyers®: Ones to Watch 2021
September 14, 2020 —
Haight Brown & Bonesteel LLPNine Haight Brown & Bonesteel LLP attorneys were selected for Best Lawyers®: Ones to Watch 2021. Congratulations to
Courtney Arbucci,
Frances Brower,
James de los Reyes,
Kyle DiNicola,
Arezoo Jamshidi,
Kristian Moriarty,
Beth Obra-White,
Casey Otis and
Kaitlin Preston!
Since it was first published in 1983, Best Lawyers® has become universally regarded as the definitive guide to legal excellence. Best Lawyers lists are compiled based on an exhaustive peer-review evaluation. Almost 94,000 industry leading lawyers are eligible to vote (from around the world), and Best Lawyers has received over 11 million evaluations on the legal abilities of other lawyers based on their specific practice areas around the world. Lawyers are not required or allowed to pay a fee to be listed; therefore inclusion in Best Lawyers is considered a singular honor. Corporate Counsel magazine has called Best Lawyers “the most respected referral list of attorneys in practice.”
Read the court decisionRead the full story...Reprinted courtesy of
Haight Brown & Bonesteel LLP
Are Modern Buildings Silently Killing Us?
May 16, 2022 —
Michael Rubino - Construction ExecutiveConstruction, in general, is a rapidly evolving industry as contractors, architects, and engineers are tasked with keeping up with government regulations, building practices and technological innovations. While growth and evolution are pivotal components of successful projects and businesses, it’s led to a few issues, one of which involves mold.
Like the construction industry, the world of mold is evolving as more research, understanding, and awareness develops, highlighting its prevalence in buildings and the effect it can have on the health of those exposed. What industry professionals are witnessing time and again is an increasing occurrence of individuals reaching out and asking for help after experiencing exposure that led to chronic illness. The reality is that modern buildings are contributing to this rise.
The Top of the Funnel
An issue aiding in mold’s prevalence in modern-day buildings is the way in which they are built. In an effort to achieve net-zero energy-efficient buildings, construction professionals have adopted the technique of sealing buildings as tightly as possible. While this transition reduces energy costs in the building, it also introduces a few new problems that aren't always addressed in modern construction. One such issue is how the lack of airflow between the indoor and outdoor environments can lead to a buildup of contaminant particles in the building.
Reprinted courtesy of
Michael Rubino, Construction Executive, a publication of Associated Builders and Contractors. All rights reserved.
Read the court decisionRead the full story...Reprinted courtesy of
How to Make the Construction Dispute Resolution Process More Efficient and Less Expensive
July 09, 2014 —
Beverley BevenFlorez-CDJ STAFFJohn P. Ahlers on the Ahlers & Cressman PLLC blog has posted the first of a two-part series on Ways to Make the Construction Dispute Resolution Process More Efficient and Less Expensive: “In our view, construction is well suited to streamlining the resolution process, particularly when experienced lawyers and judges / arbitrators are involved.”
“Discovery can take vast amounts of time and cost a company significant resources,” Ahlers wrote. “Many times, only small portions of a deposition might actually be used at the hearing in cross examination. The question then becomes whether the cost of the discovery is providing a return.”
Ahlers listed several steps and requirements that arbitrators, judges, or the parties themselves can impose to make the process more efficient, such as client involvement, avoiding too much process at the expense of practical outcomes, discovery limitations, among others.
Read the court decisionRead the full story...Reprinted courtesy of
Stuck in Seattle: The Aggravating Adventures of a Gigantic Tunnel Drill
April 01, 2015 —
Karen Weise – BloombergAbout 20 workers wearing hard hats and reflective vests clump together on the edge of a chasm near Seattle’s waterfront, peering down a hole 120 feet deep and 83 feet wide. The last men have been craned out of the pit in a yellow metal cage. Gulls squawk. A TV news helicopter hovers overhead.
A dozen journalists stand nearby on the bed of a truck. We’re here to see Bertha, one of the world’s biggest tunneling machines. Or at least a piece of her. A 240-foot crane is about to haul a 540,000-pound steel shield out of the ground, 20 months after Bertha started digging a highway. Almost imperceptibly, the crane starts rising.
The event, on a Thursday in mid-March, is part of a massive rescue mission to fix the $80 million machine. She broke abruptly in December 2013 after boring through just 1,000 feet, one-ninth of her job. Her seals busted, and her teeth clogged with grit and pieces of an 8-inch steel pipe left over from old groundwater tests. She stopped entirely.
Read the court decisionRead the full story...Reprinted courtesy of
Karen Weise, BloombergMs. Weise may be contacted at
kweise@bloomberg.net
Coverage for Faulty Workmanship Found In South Dakota
October 11, 2017 —
Tred R. Eyerly - Insurance Law HawaiiThe South Dakota Supreme Court found coverage in favor of the general contractor who was sued for alleged faulty workmanship. Owners Ins. Co. v. Tibke Constr., Inc., 2017 S.D. LEXIS 106 (S.D. Aug. 23, 2017).
The homeowners hired Tibke Construction Inc. as general contractor to build a new house. Tibke hired Jerry's Excavating Inc. as a subcontractor to prepare the soil and perform excavation work. After the project was completed, the homeowners sued Tibke and Jerry's Excavating for negligent construction and breach of contract. The homeowners alleged that Jerry's Excavating failed to conduct soil-compaction testing before construction. They alleged that the home was built upon highly expansive soils, resulting in damage to the home by "excessive settlement, cracking, structural unsoundness and other damages." The complaint further alleged that damages existed only on portions of the home not worked on by Jerry's Excavating.
Read the court decisionRead the full story...Reprinted courtesy of
Tred R. Eyerly, Insurance Law HawaiiMr. Eyerly may be contacted at
te@hawaiilawyer.com
California Contractors – You Should Know That Section 7141.5 May Be Your Golden Ticket
February 18, 2020 —
Amy L. Pierce, Mark A. Oertel & John Lubitz - Lewis Brisbois Bisgaard & Smith LLPUnder California’s Contractors’ State License Law, Cal. Bus. & Prof. Code §§ 7000 et seq., all contractors’ and subcontractors’ licenses expire two years from the last day of the month in which the license issued, or two years from the date on which the renewed license last expired. The Contractors State License Board (CSLB) sends licensees a renewal application 60 to 90 days prior to the date the license is set to expire.
Most contractors have various controls in place to make sure that the renewal application is timely filed and the required fee paid. Even so, we are only human and mistakes are made, and a renewal application filing deadline can be missed for a variety of reasons, e.g., the licensee’s mailing address has not been updated on the CSLB’s records, the individual responsible for filing the license renewal is out on leave, there has been a death in the family or a serious health issue, etc. Quoting Robert Burns, even “[t]he best-laid schemes of mice and men go oft awry” (To a Mouse, 1786).
General contractors should be cognizant of both their and their subcontractors’ license renewal obligations and deadlines.
If a licensee missed timely filing its renewal application, Business & Professions Code Section 7141.5may provide some relief. Section 7141.5 provides that the Registrar of Contractors,
“may grant the retroactive renewal of a license if the licensee requests the retroactive renewal in a petition to the registrar, files an application for renewal on a form prescribed by the registrar, and pays the appropriate renewal fee and delinquency fee prescribed by this chapter. This section shall only apply for a period not to exceed 90 days from the due date and only upon a showing by the contractor that the failure to renew was due to circumstances beyond the control of the licensee.”
Reprinted courtesy of Lewis Brisbois Bisgaard & Smith LLP attorneys
Amy Pierce,
Mark Oertel and
John Lubitz
Ms. Pierce may be contacted at Amy.Pierce@lewisbrisbois.com
Mr. Oertel may be contacted at Mark.Oertel@lewisbrisbois.com
Mr. Lubitz may be contacted at John.Lubitz@lewisbrisbois.com
Read the court decisionRead the full story...Reprinted courtesy of
Construction Firm Sues City and Engineers over Reservoir Project
October 28, 2011 —
CDJ STAFFThe city of Fremont, Ohio and Arcadis have been sued by Trucco Construction. Trucco had been hired by the city to build a reservoir designed by Arcadis, the News-Messenger reports. Peter Welin, attorney for Trucco, said that he found “startling evidence of the company’s negligence” when he deposed Arcadis engineers. “This project could never be built the way they bid it.”
Their suit alleges that Arcadis and the city were aware that the site was not conducive to construction and also that Arcadis failed to be a neutral party in discussions between Trucco and the city regarding compensation.
Sam Wamper, an attorney for Fremont, said he was going to file a motion which would include “quite an interesting story,” but declined to elaborate.
Read the full story...
Read the court decisionRead the full story...Reprinted courtesy of
Sales of New U.S. Homes Slump to Lowest Level Since November
October 28, 2015 —
Victoria Stilwell – BloombergPurchases of new U.S. homes slumped in September to a 10-month low, disrupting a trend of steady improvement this year in the industry.
Sales dropped 11.5 percent to a 468,000 annualized pace and the prior two months were revised lower, Commerce Department figures showed Monday. The September rate, which included a record percentage decline in the Northeast, was weaker than all economists’ forecasts in a Bloomberg survey.
Limited inventory of affordable homes and viable lots on which to build them may be holding back progress in housing, which has helped buffer the U.S. from slower growth abroad. Builders may need confirmation that fundamentals supporting the housing recovery -- job growth and cheap borrowing costs -- remain in place before investing in additional land and labor.
Read the court decisionRead the full story...Reprinted courtesy of
Victoria Stilwell, Bloomberg