Statute of Limitations Upheld in Construction Defect Case
September 30, 2011 —
CDJ STAFFThe Missouri Court of Appeals has ruled in Ball v. Friese Construction Co., finding that Mr. Ball’s claims were barred by the statute of limitations.
Mr. Ball hired Friese Construction Company to build a single-family home. The sale was completed on March 29, 2001. That December, Mr. Ball complained of cracks in the basement floor. SCI Engineering, n engineering firm, hired by Friese, determined that the home’s footing had settled and recommended that Mr. Ball hire a structural engineer to determine if the footings were properly designed and sized. In September 2002, the structural engineer, Strain Engineering, determined that the cracks were due to slab movement, caused in part by water beneath the slab, recommending measures to move water away from the foundation. In 2005, Mr. Ball sent Friese correspondence “detailing issues he was having with the home, including problems with the basement slab, chimney structure, drywall tape, and doors.” All of these were attributed to the foundation problems. In 2006, Friese stated that the slab movement was due to Ball’s failure to maintain the storm water drains.
In 2009, Ball received a report from GeoTest “stating the house was resting on highly plastic clay soils.” He sued Friese in May, 2010. Friese was granted a summary judgment dismissing the suit, as the Missouri has a five-year statute of limitations. Ball appealed on the grounds that the extent of the damage could not be determined until after the third expert report. The appeals court rejected this claim, noting that a reasonable person would have concluded that after the conclusion of SCI and Strain Engineering that “injury and substantial damages may have occurred.”
The court concluded that as there were not “continuing wrongs causing new and distinct damages,” he should have filed his lawsuit after the first two expert reports, not waiting seven years for a third expert to opine.
Read the court’s decision…
Read the court decisionRead the full story...Reprinted courtesy of
Nader Eghtesad v. State Farm General Insurance Company
September 28, 2020 —
Michael Velladao - Lewis BrisboisIn Eghtesad v. State Farm Gen. Ins. Co., 51 Cal.App.5th 406 (June 29, 2020), the California Court of Appeal reversed the trial court’s entry of judgment in favor of State Farm General Insurance Company (“State Farm”) based on an order sustaining a demurrer without leave to amend regarding a complaint filed by Nader Eghtesad. Mr. Eghtesad, representing himself, filed a form complaint checking a box for breach of contract. The complaint alleged two paragraphs contending that State Farm had acted in bad faith and concealed benefits due under a policy issued to a former tenant who rented space in a building owned by Eghtesad. Eghtesad was an additional insured under the tenant’s policy. In that regard, the building was damaged during the time that the building was rented and Eghtesad tendered a claim under the State Farm policy contending that he was an additional insured pursuant to the terms of the lease with the tenant. According to Eghtesad, State Farm advised him that he could only make a claim for slander against the former tenant and that coverage was not afforded for his property damage claim.
After Eghtesad filed his form complaint, State Farm demurred to the complaint and argued that it did not state facts supporting a cause of action for breach of contract. Ultimately, the trial court agreed with State Farm and entered an order sustaining the demurrer without leave to amend, such that a judgment was entered in State Farm’s favor. Due to health reasons, Eghtesad was never able to file an opposition to the demurrer, despite two extensions of time provided by the trial court intended to allow Eghtesad time to retain counsel and to recover from injuries sustained as a result of an automobile accident.
Read the court decisionRead the full story...Reprinted courtesy of
Michael Velladao, Lewis BrisboisMr. Velladao may be contacted at
Michael.Velladao@lewisbrisbois.com
California Supreme Court Upholds Insurance Commissioner’s Authority to Regulate Replacement Cost Estimates
January 26, 2017 —
Christopher Kendrick & Valerie A. Moore – Haight Brown & Bonesteel LLPn Assn. of Cal. Insurance Companies v. Jones ( No. S226529, filed 1/23/17), the California Supreme Court reversed trial and appellate court decisions to hold that California’s Insurance Commissioner Dave Jones had the authority to promulgate California Code of Regulations, title 10, section 2695.183, which sets out specific requirements for estimating replacement cost as part of any application for or renewal of homeowners insurance.
The regulation was promulgated in 2010 in response to complaints from homeowners who lost their homes in the Southern California wildfires of 2003, 2007, and 2008, and who discovered that they did not have enough insurance to cover the full cost of repairing or rebuilding their homes because the insurers’ estimates of replacement value were too low when they purchased the insurance.
Reprinted courtesy of
Christopher Kendrick, Haight Brown & Bonesteel LLP and
Valerie A. Moore, Haight Brown & Bonesteel LLP
Mr. Kendrick may be contacted at ckendrick@hbblaw.com
Ms. Moore may be contacted at vmoore@hbblaw.com
Read the court decisionRead the full story...Reprinted courtesy of
Disappearing Data: Avoid Losing Electronic Information to Avoid Losing the Case
February 01, 2022 —
Daniel C. Wennogle & Jennifer Knight Lang - Construction ExecutiveIt happens: A contractor on a delayed project ends up in litigation over liquidated damages, but the key communications regarding delays and approvals were sent and received by the project manager on a mobile device using text messages and personal email accounts. Unfortunately, the project manager left the company a year ago on bad terms and has changed phones. The information that would serve to mitigate the contractor’s liability has disappeared. With better awareness and policies for capturing and managing electronic information, this is avoidable.
Proactive and effective management of electronically stored information on construction projects can not only reduce costs and discovery disputes should litigation arise but can also provide critical evidence in reducing liability exposure in such disputes. The Federal Rules of Civil Procedure (as well as most state rules, which often mirror federal rules), provide for sanctions if a party fails to preserve electronically stored information (ESI) that should have been preserved in anticipation of litigation but is lost due to the failure to take reasonable steps to preserve it.
Even in arbitration, where discovery and disclosure obligations are often more limited than in the court setting, preservation of ESI can help strengthen claims and defenses, avoiding accusations of spoliation that can derail a case. Arbitrators can also fashion appropriate sanctions for destruction of relevant evidence, not to mention the impact that apparent spoliation can have on a party’s credibility.
Reprinted courtesy of
Daniel C. Wennogle & Jennifer Knight Lang, Construction Executive, a publication of Associated Builders and Contractors. All rights reserved.
Ms. Lang may be contacted at jennifer.lang@moyewhite.com
Mr. Wennogle may be contacted at daniel.wennogle@moyewhite.com
Read the court decisionRead the full story...Reprinted courtesy of
The Louvre Abu Dhabi’s Mega-Structure Domed Roof Completed
September 24, 2014 —
Beverley BevenFlorez-CDJ STAFFThe final part of the Louvre Abu Dhabi’s 180-metres (almost 600 feet) long domed roof was put into place on Monday, according to Arabian Business. The 12,000 tonne dome is “made up of a steel structure, weighing 7,000 tonnes (almost as much as the Eiffel Tower), and a further 5,000 tonnes of aluminum cladding.”
Carlos Antonio-Wakim, executive director of development at master developers TDIC, stated (as quoted by Arabian Business) that construction was on schedule for the opening of the museum, which is on Saadiyat Island, by the end of next year.
“The concrete works under the dome is all done, so we have all the galleries up and fit-out of those galleries has already begun,” Antonio-Wakim told Arabian Business. “There is also a lot of electromechanical works. A complex project like this requires a lot of mechanical and electrical coordination.”
Read the court decisionRead the full story...Reprinted courtesy of
Can Your Industry Benefit From Metaverse Technology?
November 06, 2023 —
The Hartford Staff - The Hartford InsightsAs the
metaverse evolves, we know there are inherent
risks for businesses. But what industries can we expect to be impacted and what are the potential upsides and opportunities?
“We are observing how different industries are incorporating this technology to better their business strategy. For example, companies are utilizing augmented reality to assess the risk for large catastrophes, like wildfires. This technology could help prevent major disastrous events if integrated properly,” said Michael Kearney, vice president of emerging technologies and innovation at The Hartford.
As virtual and augmented reality technologies become more popular, there is an uptick in demand across industries to mitigate risk, increase company efficiency and build brand awareness. There are several industries that may be significantly impacted by the evolution of the metaverse, including:
- Technology: It is anticipated that there will be cutting edge technologies at the forefront, building the infrastructure for the metaverse.
- Gaming: This industry has potential to be the center of the metaverse with gamers developing a deeper connection to the digital world.
Read the court decisionRead the full story...Reprinted courtesy of
The Hartford Staff, The Hartford Insights
Landowners Try to Choke Off Casino's Water With 19th-Century Lawsuit
December 17, 2015 —
Edvard Pettersson – BloombergCalifornia’s latest water war is being waged at the edge of wine country against an Indian tribe planning a massive casino expansion as a group of landowners tries to stop them with a lawsuit from 1897.
The Santa Ynez Band of Chumash Indians is spending $170 million to build out its resort, featuring a 12-story tower on a bucolic landscape where only the mountains are higher. The tribe has also snapped up 1,400 more acres to house cramped residents of its reservation.
Read the court decisionRead the full story...Reprinted courtesy of
Edvard Pettersson, Bloomberg
Applying Mighty Midgets, NY Court Awards Legal Expenses to Insureds Which Defeated Insurer’s Coverage Claims
February 10, 2020 —
Anthony L. Miscioscia & Timothy A. Carroll - White and Williams LLPIs an insured (or putative insured) entitled to recover its legal expenses if it is successful in coverage litigation? In some states, no. In many other states, yes – based on either a statute or the common law. In New York, an insured may recover such expenses if it was “cast in a defensive posture by the legal steps an insurer takes in an effort to free itself from its policy obligations,” and, while forced into that posture, the insured defeats the insurer’s claim. Mighty Midgets, Inc. v. Centennial Ins. Co., 389 N.E.2d 1080, 1085 (N.Y. 1979). As a corollary to that rule, the insured is not entitled to its expenses “in an affirmative action brought by [the insured] to settle its rights. . . .” Id. at 1085. Earlier this week, the New York federal court in United Specialty Ins. Co. v. Lux Maint. & Ren. Corp., 2019 U.S. Dist. LEXIS 201805 (S.D.N.Y. Nov. 20, 2019) became the latest to apply the Mighty Midgets rule, awarding several insureds their legal expenses after defeating the insurer’s declaratory judgment action.
In Lux, the CGL insurer of a façade-renovation contractor sued the contractor (its named insured) and several owners of a hospital (putative additional insureds) at which the façade-renovation work took place, claiming that the insurer did not owe a defense or indemnity to any of those companies in connection with an underlying bodily injury action brought by an employee of the contractor who was injured while performing the work. The insurer and the putative additional insureds filed cross-motions for summary judgment on the coverage issues, with the putative additional insureds also seeking to recover their legal expenses for defending against the insurer’s action. The U.S. District Court for the Southern District of New York concluded that, based on the contractor’s agreement to provide coverage for the hospital owners, and a comparison between the underlying allegations and the policy, the insurer owed the hospital owners coverage as additional insureds to the contractor’s policy; the court also concluded that the insurer owed coverage for the contractor’s contractual defense and indemnity obligations to the hospital owners. After concluding that the insurer’s claim that it did not owe coverage lacked merit, the court turned to the additional insureds’ request for their legal expenses.
The court examined the “well settled” rule under New York law “that an insured cannot recover his legal expenditure in a dispute with an insurer over coverage, even if the insurer loses and is obligated to provide coverage,” but also New York’s “limited exception” to that rule, “under which an insured who is ‘cast in a defensive posture by the legal steps an insurer takes in an effort to free itself from its policy obligations, and who prevails on the merits, may recover attorneys’ fees incurred in defending against the insurer’s action.’ ” Lux, 2019 U.S. Dist. LEXIS 201805, at *18 (quoting Mighty Midgets, 389 N.E.2d at 1085).
Reprinted courtesy of
Anthony L. Miscioscia, White and Williams and
Timothy A. Carroll, White and Williams
Mr. Miscioscia may be contacted at misciosciaa@whiteandwilliams.com
Mr. Carroll may be contacted at carrollt@whiteandwilliams.com
Read the court decisionRead the full story...Reprinted courtesy of