Shifting Fees and Costs in Nevada Construction Defect Cases
November 26, 2014 —
Casey J. Quinn - Newmeyer & Dillion LLPIn Nevada, homeowners who sue a builder for residential constructional defects may recover attorneys’ fees and costs caused by the defect. Many times, the request for attorneys’ fees can outpace the size of the actual claim for defects. However, Nevada provides builders with two ways to potentially shift the right to recover attorneys’ fees and costs away from the homeowner and to the builder.
The first arises during the Nevada Revised Statutes (NRS) Chapter 40 process (Nevada’s Right to Repair law). After a builder receives notice of construction defects, it is required to provide the claimant with a written response to each defect, which may include a proposal for monetary compensation (including contribution from a subcontractor, supplier, or design professional). See NRS 40.6472. If a claimant unreasonably rejects a reasonable written offer of settlement included in the response and decides to commence litigation, the court may deny the claimant’s attorneys’ fees and costs and award attorneys’ fees and costs to the builder. See NRS 40.650. Thus, by including a reasonable offer of monetary compensation in a Chapter 40 response, a builder could possibly avoid paying any fees and costs and even recover its own fees in defending against the claim.
A second method for shifting fees and costs is through a written offer of judgment (OOJ). See NRS 17.115 and NRCP 68. Not limited solely to construction defect matters, an OOJ is a useful tool in all kinds of litigation. OOJs are designed to facilitate and encourage pre-trial settlement by incentivizing parties to make reasonable settlement offers that—when unreasonably rejected—have the consequence of shifting the right to recover attorneys’ fees. Basically, when a party rejects an OOJ and fails to obtain a more favorable judgment, the court cannot award any attorneys’ fees and costs to the rejecting party and may award attorneys’ fees incurred from the date of the offer to the entry of judgment, as well as all reasonable costs, to the party who made the offer. In a recent decision, the Nevada Supreme Court affirmed that when a homeowner rejects an OOJ and fails to obtain a more favorable judgment, it can wipe out that homeowner’s right to Chapter 40 fees and costs. See Gunderson, et al. v. D.R. Horton, 130 Nev. Adv. Op. 9 (Feb. 27, 2014). In other words, “While NRS Chapter 40 permits an award of reasonable attorney fees proximately caused by a construction defect, it does not guarantee it.” Id.
Because of the potentially harsh consequences of rejecting an OOJ, there are specific requirements that must be met to trigger them. An offer of judgment must be made in writing, can be made at any time at least 10 days before trial, and is irrevocable for 10 days with no provision for withdrawal before the 10 days expire. See Nava v. Second Judicial Dist. Court, 118 Nev. 396, 46 P.3d 60 (2002). A party may make successive offers of judgment, but the most recent offer extinguishes previous offers and is controlling for determining the date from which attorneys’ fees may be awarded. See Albios v. Horizon Communities, Inc. 132 P.3d 1022 (2006).
In Beattie v. Thomas, 99 Nev. 579, 668 P.2d 268, 274 (1983), the Nevada Supreme Court explained that the purpose of OOJs are not to cause plaintiffs to unfairly forego legitimate claims. However, when a valid offer of judgment is made, the offer is rejected, and the party rejecting the offer fails to obtain a more favorable judgment, a court must evaluate whether the plaintiff's claim was brought in good faith; whether the offer of judgment was reasonable and in good faith in both its timing and amount; whether the plaintiff's decision to reject the offer and proceed to trial was grossly unreasonable or in bad faith; and whether the fees sought by the offer are reasonable and justified. “After weighing the foregoing factors, the district judge may, where warranted, award up to the full amount of fees requested.” Id.
It is worth noting that in Albios v. Horizon Communities, Inc. 132 P.3d 1022 (2006), the Nevada Supreme Court held that when a party rejects a reasonable OOJ and is foreclosed from recovering fees and costs, the party is likewise foreclosed from an award of fees and costs under Chapter 40. This means that even if a builder fails to include a monetary settlement offer as part of a Chapter 40 response, it may still avoid paying the claimant’s fees and costs with a reasonable and timely OOJ.
Finally, it is important to remember that OOJs are a powerful tool that can cut both ways. If an OOJ is not reasonable and timely, or if it fails to contemplate all the potential recovery of an offeree, the OOJ may have no effect on the outcome of a case. Moreover, if a party rejects an OOJ and fails to obtain a more favorable judgment, that party could end up paying the offeror’s costs and attorney’s fees incurred from the date of the offer. Given this powerful impact, OOJs should be an integral part of pre-litigation planning and overall litigation strategy.
About the Author
Casey J. Quinn is an associate in the Las Vegas office of
Newmeyer & Dillion LLP. His practice focuses on complex commercial, construction, and insurance litigation and appellate work. Casey can be reached by email at Casey.Quinn@ndlf.com.
Read the court decisionRead the full story...Reprinted courtesy of
Amazon’s Fatal Warehouse Collapse Is Being Investigated by OSHA
December 13, 2021 —
Josh Eidelson & Spencer Soper - BloombergThe Occupational Safety and Health Administration has opened an investigation into the collapse of an Amazon.com Inc. warehouse, according to a Labor Department spokesperson.
A tornado struck the Amazon delivery station in Edwardsville, Illinois, on Friday, killing six workers and destroying much of the facility at the peak of the holiday shopping season.
“OSHA has had compliance officers at the complex since Saturday, Dec. 11, to provide assistance,” the spokesperson said. “OSHA has six months to complete its investigation, issue citations and propose monetary penalties if violations of workplace safety and or health regulations are found.”
Reprinted courtesy of
Josh Eidelson, Bloomberg and
Spencer Soper, Bloomberg Read the court decisionRead the full story...Reprinted courtesy of
Near-Zero Carbon Cement Powers Sustainable 3D-Printed Homes
August 07, 2023 —
Aarni Heiskanen - AEC BusinessEco Material Technologies and Hive 3D have unveiled the first 3D-printed homes using near-zero carbon cement as part of a housing project called The Casitas @ The Halles.
The homes, ranging from 400 to 900 square feet, are constructed using Eco Material’s durable, longer-lasting cement called PozzoCEM Vite®. The cement replaces 100% of traditional Portland cement, has 92% lower emissions, and sets much faster.
Hive 3D has developed a system to mix Eco Material’s cement replacement products with locally-sourced aggregates on-site, enabling cost-efficient and affordable construction. The collaboration aims to offer sustainable housing solutions and transition the construction industry away from high-carbon materials.
Read the court decisionRead the full story...Reprinted courtesy of
Aarni Heiskanen, AEC BusinessMr. Heiskanen may be contacted at
aec-business@aepartners.fi
As Trump Visits Border, Texas Landowners Prepare to Fight the Wall
February 11, 2019 —
Associated Press - Engineering News-RecordHIDALGO, Texas (AP) — As President Donald Trump traveled to the border in Texas to make the case for his $5.7 billion wall , landowner Eloisa Cavazos says she knows firsthand how the project will play out if the White House gets its way.
The federal government has started surveying land along the border in Texas and announced plans to start construction next month. Rather than surrender their land, some property owners are digging in, vowing to reject buyout offers and preparing to fight the administration in court.
Read the court decisionRead the full story...Reprinted courtesy of
Engineering News-RecordENR may be contacted at
ENR.com@bnpmedia.com
That’s Common Knowledge! Failure to Designate an Expert Witness in a Professional Negligence Case is Not Fatal Where “Common Knowledge” Exception Applies
June 03, 2019 —
Lyndsey Torp - Snell & Wilmer Real Estate Litigation BlogIn reversing summary judgment for defendants, the California Fourth District Court of Appeal recently held that homeowners suing their real estate broker for negligence did not need an expert witness to establish the elements of their causes of action. Ryan v. Real Estate of the Pacific, Inc. (2019) 32 Cal. App. 5th 637. Typically, expert witnesses are required to establish the standard of care in professional negligence cases. But in Ryan, the court of appeal held that the “common knowledge” exception applied despite this general rule, because the conduct required by the particular circumstance of the case was within the common knowledge of a layman. The conduct in question here? The broker’s failure to disclose to his client that the client’s neighbor told him that she planned extensive renovations that would obstruct the client’s property’s ocean views.
Ryan and Patricia Ryan (the Ryans) hired defendant Real Estate of the Pacific, Inc., doing business as Pacific Sotheby’s International Realty (Sotheby’s) and defendant real estate broker to sell their residence in La Jolla, California. During an open house at the residence, a neighbor informed the Ryan’s real estate broker that she planned extensive renovations at her home that would, among other things, permanently obstruct the Ryan’s westerly ocean views and take several years to complete. The real estate broker never informed the Ryans of this, nor the subsequent buyer. The subsequent buyer purchased the property for $3.86 million, and defendants received $96,500 as commission for the sale. The day after escrow closed, the buyers learned of the renovations, and sought to rescind the purchase. Based on advice of defendants, the Ryans refused, and the dispute proceeded to arbitration. The buyer obtained a rescission of the purchase, with the Ryans order to pay damages, interest, and attorneys’ fees and costs in excess of $1 million. The Ryans then sued Sotheby’s and the real estate broker to recover these amounts and damages caused by defendants’ alleged negligence.
Read the court decisionRead the full story...Reprinted courtesy of
Lyndsey Torp, Snell & WilmerMs. Torp may be contacted at
ltorp@swlaw.com
N.J. Voters Approve $116 Million in School Construction
March 19, 2014 —
Stacie Sherman – BloombergNew Jersey voters in 11 of 13 school districts with bond referendums this week approved $116.1 million of construction.
The largest project, out of a total of $180 million proposed, failed. Voters in the Greater Egg Harbor Regional High School District rejected $37 million in renovations to three schools. The work would have increased property taxes as much as $36 a year, according to the district, which serves four towns at the Jersey Shore.
Read the court decisionRead the full story...Reprinted courtesy of
Stacie Sherman, BloombergMs. Sherman may be contacted at
sbabula@bloomberg.net
“Unwinnable”: Newark Trial Team Obtains Unanimous “No Cause” Verdict in Challenging Matter on Behalf of NYC Mutual Housing Association
May 15, 2023 —
Lewis BrisboisNewark, N.J. (May 8, 2023) – Newark Partner Afsha Noran and New Jersey Managing Partner Colin P. Hackett recently obtained a “no cause” verdict on behalf of multi-unit apartment owners and managers, notwithstanding that the trial judge initially deemed the matter an “unwinnable case” for the defense.
In this matter, Lewis Brisbois represented a large New York City mutual housing association that owned and managed a single multi-unit apartment building in Paterson, New Jersey. The plaintiffs – a mother and her two children – alleged that the housing association failed to maintain the property, which led to defective conditions and mold throughout their apartment. They further contended that the mold caused multiple pulmonary, nasal, and skin injuries. Despite
the shortage of trial judges in New Jersey, this case proceeded to trial, with the plaintiffs’ significant six-figure demand in place.
Over the course of the four-day trial, the plaintiffs presented five witnesses: the plaintiff mother, the plaintiff 18-year-old child, the liability expert, and two medical experts. The client chose not to retain either liability or damages experts to counter those of the plaintiffs. As such, Lewis Brisbois’ trial team was left to defend the matter with an opening statement, a cross-examination of the plaintiffs and their experts, the testimony of the client’s property manager, and a closing argument.
Read the court decisionRead the full story...Reprinted courtesy of
Lewis Brisbois
Substitutions On a Construction Project — A Specification Writer Responds
July 03, 2022 —
Melissa Dewey Brumback - Construction Law in North CarolinaIn response to the post about
Substitute Materials on a construction project, Phil Kabza explains how his company,
SpecGuy, handles tracking of all such materials on a project.
Phil writes:
Excellent and important topic, about which there is much confusion among design professionals and contractors. We try to maintain definitions for: