Sanctions of $1.6 Million Plus Imposed on Contractor for Fabricating Evidence
March 16, 2017 —
Paul R. Cressman, Jr.King County Superior Court issued sanctions of $1,641,721 in favor of Gefco and against Cascade Drilling, Inc. and its President, Bruce Niermeyer, composed of $1,394,435 in attorneys’ fees and $247,286 in expert fees. [i]
Cascade Drilling is a contractor. Gefco manufactures and sells large drilling machinery. The dispute centered around a project that began in 2008. Cascade was hired to drill a water well at a housing development in Wheeler Canyon, California. Cascade used a 50K drilling rig purchased from Gefco. The pump drive shafts on the drilling rig failed four times. After each failure, Cascade ordered a replacement pump drive shaft from Gefco.
In September 2008, Cascade ordered drilling equipment for an unrelated drilling rig from Gefco, but did not pay Gefco. Gefco then sued to collect. Cascade admitted not paying, but asserted counterclaims alleging that Gefco was indebted to Cascade for non-conforming and defective goods, including the replacement pump drive shafts purchased from Gefco for the Wheeler Canyon project.
Read the court decisionRead the full story...Reprinted courtesy of
Paul R. Cressman, Jr., Ahlers & Cressman PLLCMr. Cressman may be contacted at
pcressman@ah-lawyers.com
Negligent Misrepresentation in Sale of Building Altered without Permits
September 30, 2011 —
CDJ STAFFThe Supreme Court of New Hampshire has ruled in the case Wyle v. Lees. The Leeses owned a two-unit apartment building in North Conway, New Hampshire. They hired a contractor to add a third, larger apartment, including a two-car garage. The Leeses and their contractor submitted a building permit application. They were informed that site plan review was required. After receiving approval on the site plan, construction started. At no point did they obtain a building permit and the construction was never inspected. The Leeses subsequently added more space to the unit, reducing parking spaces below the minimum required. Again, they did not obtain a building permit.
In 2007, three years after all these changes were complete, the Leeses sold their building to Mr. Wyle. To the question “are you aware of any modifications or repairs made without the necessary permits?” they answered “no.” About six weeks after closing, Wyle “received a letter from the town code enforcement officer regarding the legality of the removal of a garage door from the new unit.” A subsequent inspection revealed “numerous building and life safety code violations.”
Mr. Wyle brought a claim against the Leeses for negligent misrepresentation. The defendants filed a motion “seeking to preclude economic loss damages.” At a two-day bench trial, Mr. Wyle won. The Leeses appealed.
The appeals court found that “the defendants negligently misrepresented that the premises were licensed for immediate occupancy and that the defendants had obtained all necessary permits,” and thus upheld the lower court’s finding of negligent misrepresentation. The appeals court also rejected the Leeses’ argument that damages must be apportioned on all parties, including “the plaintiff himself, the plaintiff’s building inspector, and the defendant’s contractor,” finding a lack of “adequate evidence.”
The Leeses further argued that they were unaware that modifications and repairs were accomplished without the required permits. The appeals court noted that “the trial court found that both the conditional approval and final approval for the site plan stated that a building permit and a certificate of occupancy were required prior to any use.” The court concluded that the Leeses “knew or should have known of the falsity of their representation.”
The appeals affirmed the findings of the trial court.
Read the court’s decision…
Read the court decisionRead the full story...Reprinted courtesy of
7 Areas where Technology is Shifting the Construction Business
November 21, 2018 —
Eric Weisbrot – JW Surety BondsThe digital transformation of the last two decades has taken hold of the business environment in a powerful way. Companies in nearly all sectors are experiencing a significant shift in the way business is done, with a heavy focus on improved productivity, increase profitability, and enhanced product and service offerings. The construction industry has been historically slow to update its processes and business models in-line with other industries, but technology is currently making its long-awaited appearance in the sector. Construction professionals can embrace these new solutions to run more efficient businesses and keep a closer eye on profitability by reducing
common costs over time.
These are the seven major areas where technology is changing construction.
1 - Business Management
One of the most apparent shifts taking place in the construction industry thanks to technology is the advancement of business processes and systems behind the scenes. Construction managers and job site owners have countless
digital tools at their fingertips to help with managing all aspects of the business. This includes more efficient ways to manage material use and equipment inventory, logging subcontractor hours and pay, and maintaining reporting requirements from regulatory perspectives. Many software solutions integrate with older, legacy systems, making this change an easy one for construction businesses across the board.
2 – Jobsite Productivity
Another area of transformation in construction is productivity on each job site. Technology has offered job owners and general contractors more efficient methods to keep track of project timelines as well as subcontractor progress from start to finish. The technology advancements in this arena come in the form of wearable devices that track work performed, as well as mobile devices that help keep the often mundane tasks necessary for a project’s success up to date and completed on time.
3 – Worker Safety
Although wearables are being utilized in several different ways in the construction business, these devices are making a significant difference in the safety of workers. From smart helmets to digitally enhanced eyewear, workers are alerted to potential hazards on the job that they otherwise could not identify. Similarly, augmented and virtual reality solutions are being used to train workers before they arrive at a job, preparing them for safety concerns well in advance. Even though most licensed and
bonded construction workers have appropriate training throughout their careers, the addition of these resources has the ability to further reduce the risks often associated with construction work.
4 – Surveying and Monitoring
Unmanned aerial vehicles, also known as
drones, are being used throughout construction. These digital tools are equipped with cameras to offer a bird’s eye view of a construction site to help with surveying and identifying potential hazards for workers. Drones also help with inspections throughout a project’s progression, offering some reduction in cost and improving efficiencies.
5 – Improved Materials
Technology is also playing a role in the materials used on job sites. The addition of 3D printing has proven beneficial for construction companies, as concrete composites, plastics, and other materials are being printed and used to create structures on-site. This offers a more cost-effective and accurate way to complete a project.
6 – Self-operating Equipment
Some technology firms are making waves in the construction industry because they are currently developing and implementing
autonomous equipment solutions. Heavy machinery, like excavators, bricklayers, and bulldozers, are already being used on construction sites to help ease the burden of the labor shortage in the industry. While these machines are not yet mainstream, the benefits they offer mean they are likely to become a staple in construction in the years to come.
7 – Big Data
Finally, technology is shifting the construction business by way of big data analytics. With the detailed information from new software solutions, wearable tech, and drones, construction site managers have more data than they have ever had. This influx of information offers a way to analyze job site progress, budgets, timelines, and efficiency for companies large and small.
Author:
Eric Weisbrot is the Chief Marketing Officer of
JW Surety Bonds. With years of experience in the surety industry under several different roles within the company, he is also a contributing author to the surety bond blog.
Read the court decisionRead the full story...Reprinted courtesy of
Construction Mediation Tips for Practitioners and 'Eyes Only' Tips for Construction Mediators
December 05, 2022 —
Stacy L. La Scala - Construction ExecutiveConstruction mediation can occur during or after construction and prior to or during arbitration or litigation. But, regardless of when a construction mediation occurs, its success often depends on the parties’ willingness to exchange critical information well in advance of the mediation session.
Tips for the Construction Practitioner
- Schedule a mandatory pre-session call.
A pre-session call with the mediator is the first and most effective opportunity to convey your client’s position and to allow the mediator to absorb and evaluate that information without distraction. On that call, counsel should describe the dispute and identify the decision-makers. Additionally, counsel should address the following questions:
- Are the parties working together and sharing information, or are they at war?
- Have the parties shared expert information?
- Have demands been published?
- Will the parties be publishing their briefs?
- What confidential information is not in the mediation brief?
- Will the decision-makers be participating? Are there any decision-makers who are not available or “behind the scenes”?
Reprinted courtesy of
Stacy L. La Scala, Construction Executive, a publication of Associated Builders and Contractors. All rights reserved.
Read the court decisionRead the full story...Reprinted courtesy of
Faulty Workmanship Exclusion Does Not Bar Coverage
November 18, 2011 —
Tred R. Eyerly - Insurance Law HawaiiThe court determined that the Faulty Workmanship Exclusion only barred coverage for damages arising from problems with the property under construction itself and not to losses incurred to correct damage from accidents during construction. See 1756 First Associates, LLC v. Continental Casualty Co., 2011 U.S. Dist. LEXIS 117100 (S.D.N.Y. Oct. 3, 2011).
A tower crane collapsed at the construction site, causing damage. First Associates tendered the claim to its insurer, Continental. Continental reimbursed First Associates for certain costs arising from damage to and cleanup of the construction site and building stemming from the crane collapse. Continental refused, however, to reimburse First Associates for costs associated with construction delays resulting from the collapse.
Read the full story…
Reprinted courtesy of Tred R. Eyerly, Insurance Law Hawaii. Mr. Eyerly can be contacted at te@hawaiilawyer.com
Read the court decisionRead the full story...Reprinted courtesy of
Windstorm Exclusion Found Ambiguous
September 10, 2018 —
Tred R. Eyerly - Insurance Law HawaiiThe Second Circuit reversed the District Court's issuance of summary judgment to the insurer because a windstorm exclusion was deemed ambiguous. 7001 East 71st Street, LLC v. Continental Cas. Co., 2018 U.S. App. LEXIS 17334 (2nd Cir. June 26, 2018).
A windstorm during Hurricane Sandy caused the roof of 7001 East 71st Street LLC (7001) to tear, allowing rainwater to seep in and damage 7001's "Covered Equipment" as defined by the policy. Continental denied coverage based upon the windstorm exclusion and the district court granted summary judgment to Continental.
Read the court decisionRead the full story...Reprinted courtesy of
Tred R. Eyerly, Damon Key Leong Kupchak HastertMr. Eyerly may be contacted at
te@hawaiilawyer.com
Account for the Imposition of Material Tariffs in your Construction Contract
March 28, 2018 —
David Adelstein – Florida Construction Legal UpdatesAfter Hurricane Irma, I wrote an article that contractors should revisit the
force majeure provisions in their construction contracts. Not later. But Now.
The force majeure provision is an important provision in a construction contract to account for certain uncertainties that you have NO control over.
Recently, another reason has given rise to contractors needing to revisit their force majeure provisions, as well as any provisions dealing with material escalations. Not later. But now. The
imposition of raw steel and aluminum tariffs (tax on imported goods) and the back-and-forth regarding a potential trade war leads to the kind of uncertainty that should be assessed as a risk.
A risk in both time and cost from material escalations.
Read the court decisionRead the full story...Reprinted courtesy of
David Adelstein, Florida Construction Legal UpdatesMr. Adelstein may be contacted at
dadelstein@gmail.com
De-escalating The Impact of Price Escalation
August 10, 2021 —
Brian C. Padove - ConsensusDocsWhat happens when construction material prices abruptly rise by 15%, 35%, 50%? Moreover, what happens to a construction project when such volatility occurs? While there is no definite answer, delays in procuring such materials and associated cost overruns will likely impact the construction project. The last 15 months contractors have had to work through extraordinary construction material price increases, such as a 90% price increase for lumber from April 2020 to April 2021. While there is no statistic quantifying the impact these increases have had on the construction industry, the increases surely have had an influence, whether it has been through lost profits, delays, or damage to contractors’ otherwise strong reputation for timely performance.
Considerations Prior To Contract Execution
The first way to mitigate price escalation is identifying materials most susceptible to price volatility during the bidding process and then having an open discussion with upstream parties regarding the potential price volatility. Additionally, the bid may also include either (1) an allowance for the materials providing additional funds, if necessary, should the material price increase, or (2) a shortened timeframe in which the bid is open, which would lessen the time in which a price shift may occur.
Read the court decisionRead the full story...Reprinted courtesy of
Brian C. Padove, Watt, Tieder, Hoffar & Fitzgerald, LLPMr. Padove may be contacted at
bpadove@watttieder.com