Tennessee Court: Window Openings Too Small, Judgment Too Large
November 18, 2011 —
CDJ STAFFThe Tennessee Court of Appeals has issued a ruling in the case of Dayton v. Ackerman, upholding the decision of the lower court, even as they found that the award was incorrectly computed. The Daytons purchased a house that had been designed and built by the Ackermans, who operated a construction business. The court noted that the warranty with the house promised that “for a period of 60 days, the following items will be free of defects in materials or workmanship: doors (including hardware); windows; electric switches; receptacles; and fixtures; caulking around exterior openings; pluming fixtures; and cabinet work.”
Soon, the Daytons began to experience problems with the house. Many were addressed by the Ackermans, but the Daytons continued to have problems with the windows. Neither side could specify a firm date when the Ackermans were contacted by the Daytons about the window problems. The Ackermans maintained that more than two years passed before the Daytons complained about the windows. The lower court found the Daytons more credible in this.
Initially, the Daytons included the window manufacturer in their suit, but after preliminary investigations, the Daytons dropped Martin Doors from their suit. Martin Doors concluded that the windows were improperly installed, many of them “jammed into openings that were too small for them.”
After the Daytons dismissed Martin Doors, the Ackermans sought to file a third party complaint against them. This was denied by the court, as too much time had elapsed. The Ackermans also noted that not all of the window installations were defective, however, the courts found that the Daytons ought not to have mismatched windows.
Unfortunately for the Daytons, the window repair was done incorrectly and the windows were now too small for the openings. The firm that did the repair discounted the windows and Daytons concealed the problem with plantation shutters, totalling $400 less than the original lowest estimate. However, the appeals court noted that it was here that the trial court made their computation error. Correcting this, the appeals court assessed the Ackermans $12,016.20 instead of $13,016.20.
Finally, the Ackerman’s expert was excluded as he had changed his testimony between deposition and trial. The trial reviewed the expert’s testimony and had it been admissible, it would not have changed the ruling.
Read the court’s decision…
Read the court decisionRead the full story...Reprinted courtesy of
Eighth Circuit Remands to Determine Applicability of Collapse Exclusion
January 06, 2012 —
Tred R. Eyerly - Insurance Law HawaiiThe Eighth Circuit determined a jury instruction regarding the applicability of the "all-risk" policy’s exclusion for "collapse" was inadequate. See KAAPA Ethanol, LLC v. Affiliated FM Ins. Co., 2011 U.S. App. LEXIS 22158 (8th Cir. Nov. 3, 2011).
KAAPA had nine large, cylindrical, stainless steel tanks fabricated at its location. Soon after operations began in 2003, some of the tanks experienced unusual movement and began to shift. A geotechnical engineer found "silty clay" had been used for infill instead of compacted granular fill called for in engineering drawings. A year long plan to repair all nine tanks was implemented.
Affiliated’s "all-risk" policy excluded damage caused by faulty workmanship. It also excluded damage caused by settling or cracking. The settling exclusion went on to provide, "This exclusion will not apply to loss or damage resulting from collapse of: a building or structure; or material part of a building or structure." Affiliated denied coverage because of the faulty workmanship and settling exclusions.
Read the full story…
Reprinted courtesy of Tred R. Eyerly, Insurance Law Hawaii. Mr. Eyerly can be contacted at te@hawaiilawyer.com
Read the court decisionRead the full story...Reprinted courtesy of
BUILD Act Inching Closer To Reality
July 08, 2011 —
Douglas Reiser, Builders Council BlogA select group of Senators have launched a marketing campaign for the BUILD Act. If this is the first you are hearing about the BUILD Act, do not fret. The Act still has a long way to go, but if successful it would bring a national infrastructure bank.
I have been fascinated with the concept of a national infrastructure bank for quite some time. The idea has been around since the Clinton years ? and perhaps beyond. The Act’s purpose is to create a national bank (American Infrastructure Financing Authority) to provide loans and loan guarantees to encourage private investment in upgrading America’s infrastructure. For a number of years, we have seen similar legislation float around Congress. But, none of those initiatives have gained as much traction as BUILD.
Read the full story…
Reprinted courtesy of Douglas Reiser of Reiser Legal LLC. Mr. Reiser can be contacted at info@reiserlegal.com
Read the court decisionRead the full story...Reprinted courtesy of
Housing in U.S. Cools as Rate Rise Hits Sales: Mortgages
April 28, 2014 —
John Gittelsohn and Prashant Gopal – BloombergAfter a roller-coaster decade of boom-bust-boom, the U.S. housing market is going downhill just when many economists thought annual sales would be heading up.
Sales of previously owned properties in March tumbled 7.5 percent from a year earlier to the slowest pace in 20 months, while purchases of new houses sank 14.5 percent from February, according to reports this week. Mortgage applications to buy homes plunged 19 percent from a year earlier, indicating slowing demand during what is typically the busiest season for deals.
The housing market’s underlying fragility is emerging as outside influences that fueled a two-year rebound are receding. Mortgage interest rates are rising from record lows as the central bank withdraws its stimulus, and investors, who had helped drive national prices up more than 20 percent as they went on a buying spree, are now retreating.
Mr. Gittelsohn may be contacted at johngitt@bloomberg.net; Mr. Gopal may be contacted at pgopal2@bloomberg.net
Read the court decisionRead the full story...Reprinted courtesy of
John Gittelsohn and Prashant Gopal, Bloomberg
New Research Shows Engineering Firms' Impact on Economy, Continued Optimism on Business Climate
October 28, 2024 —
The ACEC Research InstituteWASHINGTON – The ACEC Research Institute – the leading source of original research for the business of engineering – released the results of two important studies on the current and future state of the engineering industry, and its role in the overall U.S. economy.
The reports, the
2024 Economic Assessment of the Engineering & Design Services Industry and the
Engineering Business Sentiment Report for 2024 Q4, both point to continued optimism for the industry and its firms, though somewhat softened compared to previous quarters.
"This research shows the outsized impact the engineering industry has on the American economy," said ACEC Research Institute Chair Mike Carragher. "As the engineering industry's contributions grow year over year, the Institute's research helps firm executives position their businesses for a successful future."
All told, the industry added $656 billion to the U.S. GDP in 2023, supported well over five million jobs directly or indirectly, and contributed $92 billion to federal tax coffers, with an additional $44 billion in state and local taxes.
Overall, the report found that the engineering and design services industry has continued to build on its year-over-year post-COVID gains, growing 5.5% in 2023 to $436 billion, with much of that growth driven by infrastructure projects. Non-residential and non-building construction, flush with government funding through the IIJA and Inflation Reduction Act, remained on an upward trajectory.
Read the court decisionRead the full story...Reprinted courtesy of
Continuity and Disaster Recovery Plans for Contractors: Lessons From the Past
November 28, 2022 —
Rich Sghiatti - Construction ExecutiveThere is no shortage of natural disasters to illustrate the importance of being prepared. Wildfires, hurricanes, winter storms and floods can hit a construction job site hard. Appropriate property-casualty insurance and surety bonds are necessary protections for a contractor and project owner. But the addition of well-thought-out continuity and disaster recovery plans will better position the contractor to deal with whatever Mother Nature brings.
Consider Hurricane Katrina, the costliest hurricane to hit the United States. Pummeling Florida, Louisiana and Mississippi in August 2005, the storm led to 1,833 fatalities and an estimated $108 billion in damages. Levees meant to protect New Orleans from Lake Pontchartrain did not hold, flooding 80% of the city.
Utilities including power, water and sanitary sewers were severely damaged. Homes were destroyed. Roadways were closed. Communications systems were down.
Contractors who had good business continuity and disaster recovery plans fared better than those who did not.
Reprinted courtesy of
Rich Sghiatti, Construction Executive, a publication of Associated Builders and Contractors. All rights reserved.
Read the court decisionRead the full story...Reprinted courtesy of
A Behind-the-Scenes Look at Substitution Hearings Under California’s Listing Law
March 04, 2019 —
Garret Murai - California Construction Law BlogThe next case, JMS Air Conditioning and Appliance Service, Inc. v. Santa Monica Community College District, 2nd District Court of Appeal, Case No. B284068 (December 17, 2018), provides an interesting behind-the-scenes look at substitution hearings under the Subletting and Subcontracting Fair Practices Act.
The Subletting and Subcontracting Fair Practices Act
- The Subletting and Subcontracting Fair Practices Act (Public Contract Code Section 4100 et seq.), also commonly referred to as the “Listing Law,” requires that prime contractors on state and local public works projects “list” the following subcontractors in their bids:
- Subcontractors who are anticipated to perform work with a value in excess of 0.5% of the prime contractor’s total bid; and
Subcontractors, on street, highway and bridge projects, who are anticipated to perform work with a value in excess of the greater of: (a) 0.5% of the prime contractor’s total bid; or (b) in excess of $10,000.
Read the court decisionRead the full story...Reprinted courtesy of
Garret Murai, Wendel RosenMr. Murai may be contacted at
gmurai@wendel.com
An Increase of US Metro Areas’ with Normal Housing & Economic Health
February 05, 2015 —
Beverley BevenFlorez-CDJ STAFFAccording to the National Association of Home Builders’ (NAHB) Eye on Housing, 63 (out of 351) US metropolitan areas have returned to or exceeded their last normal level of housing and economic health—that’s up from 60 last quarter.
NAHB reported that “The Leading Markets Index measures a market’s proximity to normal as defined by the level of single-family housing permits, home prices and employment.”
Read the court decisionRead the full story...Reprinted courtesy of