Jersey City, New Jersey, to Get 95-Story Condo Tower
January 21, 2015 —
David M. Levitt and Terrence Dopp – BloombergA Chinese developer is planning a 95-story condominium tower for the Jersey City, New Jersey, waterfront that would be the tallest building in the state.
China Overseas America Inc. plans to construct the 950-foot (290-meter) building at 99 Hudson St., according to a statement on Tuesday from Mayor Steven Fulop. The skyscraper, with 760 for-sale dwellings, would surpass the Goldman Sachs Group Inc. tower two blocks to the south, which is 781 feet tall, according to the statement.
Mr. Levitt may be contacted at dlevitt@bloomberg.net; Mr. Dopp may be contacted at tdopp@bloomberg.net
Read the court decisionRead the full story...Reprinted courtesy of
David M. Levitt and Terrence Dopp, Bloomberg
Skilled Labor Shortage Implications for Construction Companies
July 15, 2019 —
Tony James & Keith Maciejewski - Construction ExecutiveThe construction industry is facing one of the most significant labor shortages it has ever seen. This labor shortage has far-reaching implications for worker safety and construction quality—both of which could adversely impact a company’s bottom line if investments are not made to address the issue.
What’s causing the labor gap?
There are two underlying trends driving this phenomenon:
- More experienced workers have either not returned to the industry after the Great Recession or are now retiring as they’ve concluded their careers.
- The construction industry has long struggled to attract new, younger workers to the industry, and this problem has only worsened as the broader economy boomed. As a result, construction firms must compete with other industries, such as health care, technology and engineering, for young talent.
Reprinted courtesy of
Tony James & Keith Maciejewski, Construction Executive, a publication of Associated Builders and Contractors. All rights reserved.
Read the court decisionRead the full story...Reprinted courtesy of
A Performance-Based Energy Code in Seattle: Will It Save Existing Buildings?
August 11, 2011 —
Douglas Reiser, Builders Council BlogThe City of Seattle has one of the most stringent energy codes in the nation. Based upon the Washington State Energy Code (which has been embroiled in litigation over its high standards), the code demands a lot from commercial developers. But, does it prevent developers from saving Seattle?s classic and old buildings? Perhaps.
The general compliance procedure requires buildings to be examined during the permitting process. This means that buildings are examined before they begin operating. The procedure is not malleable and is applicable to all buildings, old and new, big and small.
The downside of this procedure is that it eliminates awarding compliance to those buildings exhibiting a number of passive features, such as siting, thermal mass, and renewable energy production. This problem has prevented a number of interesting and architecturally pleasing existing building retrofits from getting off the ground. The cost of complying with the current system can be 20% more, and it might prevent builders from preserving a building?s historical integrity.
Read the full story…
Reprinted courtesy of Douglas Reiser of Reiser Legal LLC. Mr. Reiser can be contacted at info@reiserlegal.com
Read the court decision
Read the full story...Reprinted courtesy of
Residential Construction: Shrinking Now, Growing Later?
August 17, 2011 —
CDJ STAFFJim Haugey, the Chief Economist for Reed Construction Data noted that new residential construction spending fell 0.2% in June and a slightly larger drop of 0.5% in residential remodeling. While economic growth is still low, Haugey states that homebuilders have “record low inventories.” He forecasts a shrinkage of 1.5% in 2011, followed by about 20% growth in 2012.
Read the full story…
Read the court decisionRead the full story...Reprinted courtesy of
Is The Enforceability Of A No-Damage-For-Delay Provision Inappropriate For Summary Judgment
February 24, 2020 —
David Adelstein - Florida Construction Legal UpdatesIs the enforceability of a no-damage-for-delay provision inappropriate for resolution on a summary judgment? The recent decision in U.S. f/u/b/o Kingston Environmental Services, Inc. v. David Boland, Inc., 2019 WL 6178676 (D. Hawaii 2019), dealing with Florida law, suggests that it is inappropriate for a summary judgment resolution, particularly when there is a right to a jury trial.
In this case, a prime contractor was hired on a federal construction project in Hawaii. The prime contractor hired a subcontractor and the subcontractor sued the prime contractor and its surety under the Miller Act. Of interest, the subcontractor was seeking to recover for the costs it incurred due to construction delays. The prime contractor moved for summary judgment as to the no-damage-for-delay provision in the subcontract. The no-damages-for-delay provision read as follows (and it is a well-written no-damage-for-delay provision):
The Subcontractor expressly agrees that the Contractor shall not be liable to the Subcontractor for any damages or additional costs, whether foreseeable or unforeseeable, resulting in whole or in part from a delay, hindrance, suspension, or acceleration of the commencement or execution of the Work, caused in whole or in part by the acts or omissions, whether negligent or not, of the Contractor including other subcontractors or material suppliers to the Project, its agents, employees, or third parties acting on behalf of the Contractor. The Subcontractor’s sole remedy for any such delay, hindrance, suspension, or acceleration shall be a noncompensable time extension.
Read the court decisionRead the full story...Reprinted courtesy of
David Adelstein, Kirwin Norris, P.A.Mr. Adelstein may be contacted at
dma@kirwinnorris.com
Can Your Industry Benefit From Metaverse Technology?
November 06, 2023 —
The Hartford Staff - The Hartford InsightsAs the
metaverse evolves, we know there are inherent
risks for businesses. But what industries can we expect to be impacted and what are the potential upsides and opportunities?
“We are observing how different industries are incorporating this technology to better their business strategy. For example, companies are utilizing augmented reality to assess the risk for large catastrophes, like wildfires. This technology could help prevent major disastrous events if integrated properly,” said Michael Kearney, vice president of emerging technologies and innovation at The Hartford.
As virtual and augmented reality technologies become more popular, there is an uptick in demand across industries to mitigate risk, increase company efficiency and build brand awareness. There are several industries that may be significantly impacted by the evolution of the metaverse, including:
- Technology: It is anticipated that there will be cutting edge technologies at the forefront, building the infrastructure for the metaverse.
- Gaming: This industry has potential to be the center of the metaverse with gamers developing a deeper connection to the digital world.
Read the court decisionRead the full story...Reprinted courtesy of
The Hartford Staff, The Hartford Insights
Insurance Companies Score Win at Supreme Court
December 26, 2022 —
Mason Fletcher & Ryan Sternoff - Ahlers Cressman & Sleight PLLCIn 2011, the Washington State Department of Transportation (“WSDOT”) contracted with Seattle Tunnel Partners, a joint venture of Dragados USA and Tutor Perini (“STP”) to construct a tunnel (“SR 99 Tunnel”) to replace the dilapidated Alaska Way Viaduct. STP obtained a builder’s “all-risk” insurance policy (“Policy”) from Great Lakes Reinsurance (UK) PLC and several other insurers (collectively, the “Insurers”) which insured against damage to both the project and the tunnel boring machine popularly known as Big Bertha (“Bertha”).
Bertha began excavating in July 2013 but broke down a few months later when the machine stopped working. Work did not resume on the project until December 2015. WSDOT and STP tendered insurance claims for the losses associated with the delays and breakdown of Bertha but the Insurers denied coverage. Thereafter, WSDOT and STP sued.
The Insurers moved the trial court for partial summary judgment to resolve some, but not all, of the coverage disputes. In a unanimous decision, the Washington State Supreme Court affirmed the trial court and Court of Appeals, and held that insurance companies do not have to reimburse WSDOT and STP for costs accrued during a two-year Project delay, under certain provisions of the insurance policies.
Reprinted courtesy of Mason Fletcher, Ahlers Cressman & Sleight PLLC and
Ryan Sternoff, Ahlers Cressman & Sleight PLLC
Mr. Sternoff may be contacted at ryan.sternoff@acslawyers.com
Read the court decisionRead the full story...Reprinted courtesy of
Georgia Court Reaffirms Construction Defect Decision
August 27, 2013 —
CDJ STAFFIn 2011, the Georgia Supreme Court ruled that construction defects could count as “occurrences” under a general liability policy. John Watkins, writing in Law360, notes that the ruling “has potentially broad implications for Georgia insureds.” He goes on to look at a later Georgia Supreme Court case, in which the court reaffirmed its decision in the 2011 Hathaway case.
In the 2013 case, Taylor Morrison Services Inc. v. HDI-Gerlins Ins., the court held that the property damage had to happen to something other than the work performed by the insured, and that a breaches of warranty without fraud claims may be covered. But Watkins notes that this points to “the continuing efforts of insurers to deny coverage for construction defects under CGL policies.”
This overruled some of the past decisions of the United States District Court for the Northern District of Georgia. Watkins noted that the Eleventh Circuit seemed to wonder about the scope of Hathaway, but with Taylor Morrison, “the Georgia Supreme Court provided a clearly stated response.”
Looking at the implications, he gives an example in which if a window installer work causes a window to leak and the water intrusion damages a floor, the floor, but not the window would be covered. But he cautions, “the result may turn on the policy language and the particular facts.” In any case, he assures us that “coverage disputes regarding construction defects are sure to continue.”
Read the court decisionRead the full story...Reprinted courtesy of