CGL Insurer’s Duty To Defend Broader Than Duty To Indemnify And Based On Allegations In Underlying Complaint
April 10, 2019 —
David Adelstein - Florida Construction Legal UpdatesThe duty to defend an insured with respect to a third-party claim is broader than the duty to indemnify the insured for that claim. The duty to defend is triggered by allegations in the underlying complaint. However, an insurer is only required to indemnify its insured for damages covered under the policy. A recent case example demonstrating the duty to defend is broader than the duty to indemnify can be found in Southern Owners Ins. Co. v. Gallo Building Services, Inc., 2018 WL 6619987 (M.D.Fla. 2019).
In this case, a homebuilder built a 270-unit condominium project where the units were included in 51-buildings. Upon turnover of the condominium association to the unit owners, the condominium association served a Florida Statutes Chapter 558 Notice of Construction Defects letter. There was numerous nonconforming work spread out among various subcontractor trades including nonconforming stucco work. The homebuilder incurred significant costs to repair defective work and resulting property damage, and relocated unit owners during repairs. The homebuilder then filed a lawsuit against implicated subcontractors. One of the implicated subcontractors was the stucco subcontractor.
Read the court decisionRead the full story...Reprinted courtesy of
David Adelstein, Kirwin NorrisMr. Adelstein may be contacted at
dma@kirwinnorris.com
California Court of Appeal Vacates $30M Non-Economic Damages Award Due to Failure to Properly Apportion Liability and Attorney Misconduct During Closing Argument
February 08, 2021 —
Krsto Mijanovic, Peter A. Dubrawski, Arezoo Jamshidi & Catherine M. Asuncion - Haight Brown & Bonesteel LLPOn January 20, 2021, the California Court of Appeal, Second District, Division Six (Ventura), in Plascencia v. Deese (B299142), vacated a $30 million non-economic damages award in a highway fatality case because: (1) the award did not properly apportion non-economic damages among everyone at fault in violation of Proposition 51; and (2) the amount of the award appeared to have been influenced by plaintiffs’ counsel’s misconduct and prejudicial remarks during closing argument.
In Plascencia, the plaintiffs sued several defendants for the wrongful death of their daughter arising from a highway fatality accident. All the defendants settled or were dismissed before trial except the trucking defendants. The highway fatality was caused when one defendant driver made an illegal U-turn on a highway as she left another defendant’s fruit stand. The plaintiffs’ daughter swerved to avoid the U-turn driver, lost control of her car, and crashed into the back of the trucking defendants’ diesel tractor-trailer. The truck driver had parked the truck on the side of the highway near the fruit stand, which the trucking defendants’ expert conceded fell below the standard of care.
Reprinted courtesy of
Krsto Mijanovic, Haight Brown & Bonesteel LLP,
Peter A. Dubrawski, Haight Brown & Bonesteel LLP,
Arezoo Jamshidi, Haight Brown & Bonesteel LLP and
Catherine M. Asuncion, Haight Brown & Bonesteel LLP
Mr. Mijanovic may be contacted at kmijanovic@hbblaw.com
Mr. Dubrawski may be contacted at pdubrawski@hbblaw.com
Ms. Jamshidi may be contacted at ajamshidi@hbblaw.com
Ms. Asuncion may be contacted at casuncion@hbblaw.com
Read the court decisionRead the full story...Reprinted courtesy of
Construction Law Advisory: Mechanical Contractor Scores Victory in Prevailing Wage Dispute
September 03, 2014 —
Steven M. Cvitanovic & Jessica M. Lassere Ryland - Haight Brown & Bonesteel LLPOn August 27, 2014, the First District Court of Appeal weighed in on whether prevailing wages are required for public contracts in situations where work is performed in furtherance of the project but at a permanent offsite manufacturing facility that is not exclusively dedicated to the project. In Sheet Metal Workers' International Association, Local 401 v. John C. Duncan and Russ Will Mechanical, the project at issue was for a community college district where Russ Will was the HVAC subcontractor. The contract documents required contractors to pay prevailing wages but they did not limit where or how Russ Will would fabricate sheet metal required for the job. Russ Will used its existing fabrication facility to form the sheet metal.
An employee of Russ Will filed a complaint with the DIR alleging he should have been paid prevailing wages for work related to the project. The worker fabricated sheet metal for the project but at Russ Will’s Hayward facility, not at the site. The DIR issued a coverage determination in which it concluded that Russ Will was required to pay prevailing wages for the offsite fabrication work associated with the project. The DIR's determination turned on whether Russ Will was exempt from the prevailing wage law as a material supplier. To qualify for the material supplier exemption, the employer must sell supplies to the general public and its fabrication or manufacturing facility must not be established for the particular public works contract or be located at the site of the public work.
Following the DIR determination, Rush Will filed an administrative appeal. The department reversed its initial coverage determination, concluding that the offsite fabrication performed by Russ Will was not subject to the prevailing wage law.
Reprinted courtesy of
Steven M. Cvitanovic, Haight Brown & Bonesteel LLP and
Jessica M. Lassere Ryland, Haight Brown & Bonesteel LLP
Mr. Cvitanovic may be contacted at scvitanovic@hbblaw.com; Ms. Ryland may be contacted at jlassere@hbblaw.com
Read the court decisionRead the full story...Reprinted courtesy of
Appeals Court Finds Manuscript Additional Insured Endorsements Ambiguous Regarding Completed Operations Coverage for Additional Insured
September 07, 2017 —
Christopher Kendrick & Valerie A. Moore – Haight Brown & Bonesteel LLPIn Pulte Home Corp. v. American Safety Indemnity Co. (No. D070478; filed 8/30/17), a California appeals court found that manuscript additional insured endorsements on construction subcontractors’ policies were ambiguous regarding additional insured coverage for the developer, and that substantial evidence supported a finding that the insurer’s refusal to defend the developer was in bad faith. The court also approved awarding punitive damages on a one-to-one basis with the general damages. But the appeals court remanded the case for a further determination on the amount of Brandt fees, based on the developer’s change from a contingency to an hourly agreement.
The Pulte case arose from the development of two residential housing projects beginning in 2003 and sold in 2005-2006. Subcontractors were required to name Pulte as additional insured on their policies, some of them issued by American Safety. In 2013, homeowners sued Pulte based in part on the work of subcontractors insured by American Safety, which then denied coverage to Pulte because the construction had taken place years earlier.
Reprinted courtesy of
Christopher Kendrick, Haight Brown & Bonesteel LLP and
Valerie A. Moore, Haight Brown & Bonesteel LLP
Mr. Kendrick may be contacted at ckendrick@hbblaw.com
Ms. Moore may be contacted at vmoore@hbblaw.com
Read the court decisionRead the full story...Reprinted courtesy of
Contractor’s Burden When It Comes to Delay
October 26, 2020 —
David Adelstein - Florida Construction Legal UpdatesWhen a contractor is challenging the assessment of liquidated damages, or arguing that it is entitled to extended general conditions, the contractor bears a burden of proof to establish there were excusable delays that impacted the critical path and, in certain scenarios, the delays were not concurrent with contractor-caused delay:
When delays are excusable, a contractor is entitled to a time extension, such that the government may not assess liquidated damages for those delays. The government bears the initial burden of proving that the contractor failed to meet the contract completion date, and that the period of time for which the government assessed liquidated damages was correct. If the government makes such a showing, the burden shifts to the contractor to show that its failure to timely complete the work was excusable. To show an excusable delay, a contractor must show that the delay resulted from “unforeseeable causes beyond the control and without the fault or negligence of the Contractor.” “In addition, the unforeseeable cause must delay the overall contract completion; i.e., it must affect the critical path of performance.” Further, the contractor must show that there was no concurrent delay.
Ken Laster Co., ASBCA No. 61292, 2020 WL 5270322 (ASBCA 2020) (internal citations omitted).
Read the court decisionRead the full story...Reprinted courtesy of
David Adelstein, Kirwin Norris, P.A.Mr. Adelstein may be contacted at
dma@kirwinnorris.com
Real Estate & Construction News Round-Up (01/11/23) – Construction Tech, Housing Market Confidence, and Decarbonization
February 01, 2023 —
Pillsbury's Construction & Real Estate Law Team - Gravel2Gavel Construction & Real Estate Law BlogTo kick of 2023, this week’s news round-up dives into contech inventions projected to impact the industry, shifting home prices and buyer confidence, investors prioritizing decarbonization efforts, and more.
- From holograms to robots, these 6 contech innovations are projected to tackle some of construction’s toughest issues. (Robyn Griggs Lawrence, Construction Dive)
- Manufacturing and data center projects will support the U.S. construction industry as work begins to slow on retail projects, warehouses and offices. (Sebastian Obando, Construction Dive)
- Despite macroeconomic headwinds, doubling down on decarbonization efforts is projected to be top-of-mind for investors and occupiers in 2023. (JLL)
Read the court decisionRead the full story...Reprinted courtesy of
Pillsbury's Construction & Real Estate Law Team
Reconstructing the Francis Scott Key Bridge Utilizing the Progressive Design-Build Method
June 04, 2024 —
Lisa D. Love - The Dispute ResolverHaving awakened on the morning of March 26 to the devastating news of the collapse of Baltimore’s Francis Scott Key Bridge after being struck by the Dali, a 984 length /52 beam foot cargo container ship, I thought of the many times I crossed the bridge as a child growing up in Washington, D.C. I also recalled Montgomery Schyler’s comments on the opening of the Brooklyn Bridge, when he stated that “the work which is likely to be our most durable monument, and to convey some knowledge of us to the most remote posterity, is a work of bare utility; not a shrine, not a fortress, not a palace, but a bridge.”
I thought of the beauty of New York’s Mario Cuomo Bridge, a 3.1-mile cable-stayed twin-span bridge with eight traffic lanes, bicycle and pedestrian paths, six lookout points and room for future rapid transit. It was completed in 2018 and constructed under a design-build procurement model[i] at a cost of $3.98 billion. Accelerated bridge construction (ABC) techniques were utilized in its construction. ABC techniques employ innovative planning, design, materials, and construction methods in a safe and cost-effective manner to reduce the on-site construction time that occurs when building new bridges or replacing and rehabilitating existing ones. ABC techniques improve site constructability, total project delivery time, work-zone safety for the traveling public and traffic impacts, on-site construction time, and weather-related time delays.[ii]
I also thought of the gracefulness of Boston’s Leonard P. Zakim Bunker Hill Memorial Bridge, a 0.27-mile hybrid cable-stayed steel and concrete bridge with pedestrian and bicycle access that holds 10 lanes of traffic. The Zakim Bridge was completed in 2004 at a cost of approximately $100 million as part of the $24.3 billion Big Dig.[iii] Despite its elegant, streamlined appearance, the bridge was designed to be exceptionally strong, withstand winds over 400 miles per hour and endure a magnitude 7.9 earthquake.[iv]
Read the court decisionRead the full story...Reprinted courtesy of
Lisa D. Love, JAMS
Ninth Circuit Holds that 1993 Budget Appropriations Language Does Not Compel the Corps of Engineers to use 1987 Wetlands Guidance Indefinitely
October 09, 2018 —
Anthony B. Cavender - Gravel2GavelOn September 21, 2018, the U.S. Court of Appeals for the Ninth Circuit decided the case of Tin Cup, LLC v. U.S. Army Corps of Engineers. A divided panel of the Court of Appeals (although all members concurred in the result) held that legislative language in a 1993 appropriations act does not require the U.S. Army Corps of Engineers (Corps) to continue to use its 1987 Clean Water Act (CWA) wetlands guidance beyond 1993. The Ninth Circuit noted that it approaches the interpretation of budget bills somewhat differently.
Read the court decisionRead the full story...Reprinted courtesy of
Anthony B. Cavender, PillsburyMr. Cavender may be contacted at
anthony.cavender@pillsburylaw.com