Lead Paint: The EPA’s Renovation, Repair and Painting Rule
September 09, 2019 —
Christopher G. Hill - Construction Law MusingsFor this week’s Guest Post Friday here at Musings, we welcome Joshua Glazov for the first time. Josh has been a construction lawyer since 1995. He practices at Much Shelist in Chicago and focuses on negotiating and preparing design and construction contracts for owners, contractors, and lenders, as well as preparing for, and confronting, construction related insolvency when a project participant goes bankrupt or a lender goes into FDIC receivership. Josh publishes on these topics at his blogs: Construction Law Today and the Bank Failure Blog.
Last month the EPA finally issued their Renovation, Repair and Painting Rule (PDF), the one that sets up new requirements for work on projects that may involve lead paint. The requirements are many complex. You’ll need to become familiar with this rule if you do any renovation , repair, or painting work, especially of your work is on buildings built before lead paint was banned in 1978.
- You’ll need to become a certified by the EPA as a Certified Renovation Firm
Read the court decisionRead the full story...Reprinted courtesy of
The Law Office of Christopher G. HillMr. Hill may be contacted at
chrisghill@constructionlawva.com
Properly Trigger the Performance Bond
January 04, 2018 —
David Adelstein - Florida Construction Legal UpdatesOriginally Published by CDJ on January 5, 2017
A performance bond is a valuable tool designed to guarantee the performance of the principal of the contract made part of the bond. But, it is only a valuable tool if the obligee (entity the bond is designed to benefit) understands that it needs to properly trigger the performance bond if it is looking to the bond (surety) to remedy and pay for a contractual default. If the performance bond is not properly triggered and a suit is brought upon the bond then the obligee could be the one materially breaching the terms of the bond. This means the obligee has no recourse under the performance bond. This is a huge downside when the obligee wanted the security of the performance bond, and reimbursed the bond principal for the premium of the bond, in order to address and remediate a default under the underlying contract.
A recent example of this downside can be found in the Southern District of Florida’s decision in Arch Ins. Co. v. John Moriarty & Associates of Florida, Inc., 2016 WL 7324144 (S.D.Fla. 2016). Here, a general contractor sued a subcontractor’s performance bond surety for an approximate $1M cost overrun associated with the performance of the subcontractor’s subcontract (the contract made part of the subcontractor’s performance bond). The surety moved for summary judgment arguing that the general contractor failed to property trigger the performance bond and, therefore, materially breached the bond. The trial court granted the summary judgment in favor of the performance bond surety. Why?
Read the court decisionRead the full story...Reprinted courtesy of
David Adelstein, Florida Construction Legal UpdatesMr. Adelstein may be contacted at
dadelstein@gmail.com
Wisconsin Supreme Court Upholds Asbestos Exclusion in Alleged Failure to Disclose Case
January 22, 2014 —
Beverley BevenFlorez-CDJ STAFFIn the case Phillips v. Parmelee, the Wisconsin Supreme court ruled “that an asbestos exclusion in a liability policy barred a duty to defend and indemnify a building seller for claims that the seller failed to disclose that the building contained asbestos,” according to an article in Mondaq by Ruth S. Kochenderfer and Deanna P. Cook, both from Steptoe & Johnson LLP. The policyholder received a building report stating that the “heating ducts likely contained asbestos,” however, the buyers alleged that the policyholder never provided them the report. After the buyers purchased the property, contractors “cut through the heating ducts, unknowingly dispersing asbestos throughout the building.”
According to Kochenderfer and Cook’s article, “The insurer intervened in the buyers' suit and sought summary judgment against the policyholder and buyers, arguing that an asbestos exclusion precluded coverage for the buyers' suit against the policyholder.” The buyers took the case to the Wisconsin Supreme court and “attacked the asbestos exclusion,” but the court rejected every argument.
Kochenderfer and Cook stated that the “decision is significant because three courts, including Wisconsin's highest court, squarely rejected attempts to narrow a broad, clearly-worded asbestos exclusion. Further, it confirms that such an asbestos exclusion will apply to all causes of action, including an alleged failure to disclose the presence of asbestos.”
Read the court decisionRead the full story...Reprinted courtesy of
Retaining Wall Contractor Not Responsible for Building Damage
July 20, 2011 —
CDJ STAFFThe Court of Appeals of Indiana ruled on July 8 in the case of Rollander Enterprises, Inc. v. H.C. Nutting Co. Judge Baily wrote the opinion affirming the decision of the trial court.
The case involved an unfinished condominium complex, the Slopes of Greendale, in Greendale, Indiana. Rollander is a real estate development company incorporated in Ohio. One of the issues in the case was whether the case should be settled in the Indiana courts or be tried in Ohio. The project was owned by a special purpose entity limited liability corporation incorporated in Indiana.
Rollander hired Nutting to determine the geological composition of the site. Nutting’s report described the site as “a medium plastic clay containing pieces of shale and limestone.” The court summarized this as corresponding with “slope instability and landslides.” Rollander then hired Nutting to design the retaining walls, which were constructed by Scherziner Drilling.
After cracking was discovered on State Route 1, the walls were discovered to be inadequate. More dirt was brought in and a system of tie-backs was designed to anchor the walls. Not only were the tie-backs unsightly, local officials would not approve the complex for occupancy. Further, the failure of the wall below one building lead to damage of that building.
The court concluded that since almost all events occurred in Indiana, they rejected Rollander’s contention that the case should be tried in Ohio. Further, the court notes “the last event making Nutting potentially liable on both claims was an injury that occurred in Indiana and consequently, under the lex loci delicti analysis, Indiana law applies.”
Nor did the court find that Nutting was responsible for the damage to the rest of the project, citing an Indiana Supreme Court ruling, that “there is no liability in tort to the owner of a major construction project for pure economic loss caused unintentionally by contractors, subcontractors, engineers, design professionals, or others engaged in the project with whom the project owner, whether or not technically in privity of contract, is connected through a network or chain of contracts.”
The court concluded:
Because Rollander was in contractual privity with Nutting, and Indy was connected to Nutting through a chain of contracts and no exception applies, the economic loss rule precludes their recovery in tort. Damage to Building B was not damage to "other property," and the negligent misrepresentation exception to the economic loss rule is inapplicable on these facts. The trial court therefore did not abuse its discretion by entering judgment on the evidence in favor of Nutting on the Appellants' negligence and negligent misrepresentation claims.
Read the court’s decision…
Read the court decisionRead the full story...Reprinted courtesy of
Managing Narrative, Capturing Context, and Building Together: Talking VR and AEC with David Weir-McCall
October 19, 2020 —
Aarni Heiskanen - AEC BusinessWe sat down with David Weir-McCall of Epic Games to discuss the role VR plays in the modern AEC ecosystem. Our conversation covered the power of merging digital innovation with human insight, the importance of accessible data visualization, and the role that the Unreal platform plays across a range of sectors every day.
Can you tell us a little bit about your career to date and what drove you to merge architectural design with tech dev?
Sure – I initially studied architecture and. after graduation, was looking at what I wanted to work on. What really interested me was big, complex, and large-scale projects because of the degree of challenge. So, I ended up heading out to the Middle East for seven and a half years and worked in a variety of multidisciplinary firms.
Read the court decisionRead the full story...Reprinted courtesy of
Aarni Heiskanen, AEC BusinessMr. Heiskanen may be contacted at
aec-business@aepartners.fi
Acquisition, Development, and Construction Lending Conditions Ease
May 21, 2014 —
Beverley BevenFlorez-CDJ STAFFAccording to the National Association of Home Builders’ (NAHB) Eye on Housing, “[b]uilders and developers continue to report easing credit conditions for acquisition, development, and construction (AD&C) loans according to NAHB’s survey on AD&C financing.”
Eye on Housing stated that while “commercial banks remain the primary source of credit for AD&C by a wide margin, private individual investors have emerged as a viable alternative, especially for A&D loans.”
Read the court decisionRead the full story...Reprinted courtesy of
New Mexico Holds One-Sided Dispute Resolution Provisions Are Unenforceable
November 05, 2024 —
Bill Wilson - Construction Law ZoneDispute resolution provisions that grant one party the unilateral right to choose either litigation or arbitration to resolve disputes are common in the construction industry. The main difference between the two forums is that courts are more likely to strictly enforce contract terms as written as well as the applicable law, while arbitrators make decisions on more equitable considerations, untethered to the contract terms and—to some degree—the law. The party with the sole discretion to select the dispute resolution procedure can select the process most beneficial to its interests based on the nature of the dispute, regardless of who brings the claims. In Atlas Electrical Construction, Inc. v. Flintco, LLC, 550 P.3d 881 (N.M. Ct. App. 2024), the Court of Appeals of New Mexico recently held that an arbitration provision in a subcontract, under which the contractor retained the exclusive right to choose whether disputes arising under the subcontract were litigated in court or arbitrated was unreasonably one-sided, substantively unconscionable, and unenforceable.
The Atlas Electrical case involved two sophisticated entities with equal bargaining strength to negotiate the terms of a subcontract. The parties agreed to a subcontract provision which provided in the relevant part:
In the event [contractor] and [subcontractor] cannot resolve the dispute through direct discussions or mediation … then the dispute shall, at the sole discretion of [contractor], be decided either by submission to (a) arbitration … or (b) litigation …
Read the court decisionRead the full story...Reprinted courtesy of
Bill Wilson, Robinson & Cole LLPMr. Wilson may be contacted at
wwilson@rc.com
As Laura Wreaks Havoc Along The Gulf, Is Your Insurance Ready to Respond?
October 19, 2020 —
Walter J. Andrews, Michael S. Levine, Andrea DeField & Meagan R. Cyrus - Hunton Insurance Recovery BlogAs Texas and Louisiana brace for Hurricane Laura to make landfall, policyholders in the affected regions should be making last minute preparations to ensure their properties are covered in the storm’s wake.
Hurricane Laura is expected to make landfall as a Category 4 storm tonight, or early Thursday morning between Houston, Texas and Lake Charles, Louisiana. With wind speeds reaching over 120 mph, Laura has the potential for catastrophic damage to life and property and long-term disruption of normal business operations. The following three steps are crucial to ensuring that you protect your property and business and maximize insurance proceeds should your property fall in the path of this storm:
- Locate a copy of your policy.
Having your policy on hand prior to a loss will aid in starting your claim as soon as possible, as it may be more difficult to get in touch with your broker following a storm where thousands of claims are taking place simultaneously.
Reprinted courtesy of
Walter J. Andrews, Hunton Andrews Kurth,
Michael S. Levine, Hunton Andrews Kurth,
Andrea DeField, Hunton Andrews Kurth and
Meagan R. Cyrus, Hunton Andrews Kurth
Mr. Andrews may be contacted at wandrews@HuntonAK.com
Mr. Levine may be contacted at mlevine@HuntonAK.com
Ms. DeField may be contacted at adefield@HuntonAK.com
Ms. Cyrus may be contacted at mcyrus@HuntonAK.com
Read the court decisionRead the full story...Reprinted courtesy of