Court Finds That Split in Underground Storage Tank is Not a Covered Collapse
July 13, 2017 —
Christopher Kendrick & Valerie A. Moore – Haight Brown & Bonesteel LLPIn Tustin Field Gas & Food v. Mid-Century Ins. Co. (No. B268850, filed 7/3/17), a California appeals court ruled that a split in an underground storage tank, caused by the tank sitting on a rock for years, was not a covered “collapse” as a matter of law.
Tustin Field owned a gas station in Palm Springs. The installer of the underground storage tanks did not follow the manufacturer’s instructions to bury them in pea gravel or crushed rock. Instead, the installer just dug a hole, placed the tanks into that hole, and then covered them with “native soil” containing rocks, boulders and other debris.
The tanks were double-walled, steel with a fiberglass sheath. Sixteen years after installation, testing revealed that the fiberglass sheath on one tank was no longer intact. The tank was excavated and the fiberglass sheath was found to be cracked from the tank sitting on a nine-inch boulder. The insured paid to have the crack repaired and made a claim for the cost of excavating and repairing the tank.
Reprinted courtesy of
Christopher Kendrick, Haight Brown & Bonesteel LLP and
Valerie A. Moore, Haight Brown & Bonesteel LLP
Mr. Kendrick may be contacted at ckendrick@hbblaw.com
Ms. Moore may be contacted at vmoore@hbblaw.com
Read the court decisionRead the full story...Reprinted courtesy of
Privity Problems Continue for Additional Insureds in the Second Circuit
November 08, 2017 —
Samantha M. Martino – Saxe Doernberger & Vita, P.C.On October 4, the Second Circuit held that Harleysville Insurance Company had no duty to defend or indemnify a project owner or general contractor as additional insureds under a sub-subcontractor’s commercial general liability (CGL) policy due to lack of direct contractual privity. 1
The underlying claim arose when an employee of The Kimmell Company, Inc. (Kimmell) was injured while repairing an HVAC system at a building owned by the University of Rochester Medical Center (UR). The injured employee sought damages for his injuries and fi led suit against (1) UR; (2) LeChase Construction Corp. (LeChase), the general contractor for the project; and (3) J.T. Mauro Co. Inc. (Mauro), a subcontractor hired by LeChase.
Mauro hired Kimmell as a sub-subcontractor to perform HVAC services at the project. The Mauro-Kimmel contract required Kimmel to add Mauro, UR, and LeChase as additional insureds under Kimmell’s CGL policy.
Read the court decisionRead the full story...Reprinted courtesy of
Samantha M. Martino, Saxe Doernberger & Vita, P.C.Ms. Martino may be contacted at
smm@sdvlaw.com
Construction Spending Drops in March
May 10, 2013 —
CDJ STAFFReuters reports that construction spending dropped by 1.7 percent in March, bringing it to the lowest level since August, more than wiping out February’s increase of 1.5 percent. Economists had predicted a mild gain of 0.7 percent. Spending fell due to a 4.1 percent drop in public construction projects, bringing it to its lowest in six and a half years.
Read the court decisionRead the full story...Reprinted courtesy of
Rio Olympic Infrastructure Costs of $2.3 Billion Are Set to Rise
January 31, 2014 —
Tariq Panja and David Biller – BloombergBrazilian authorities announced 5.6 billion reais ($2.3 billion) will be spent on infrastructure directly related to the 2016 Rio de Janeiro Olympic Games and those costs will rise as projects are added.
Yesterday’s announcement comes months behind schedule, and after pressure on public bodies to reveal exactly how much it will cost for Rio to be the first South American city to host the quadrennial showpiece. Delays and cost overruns to several projects related to this year’s soccer World Cup have sharpened the focus on the Olympics.
“We are committed to being on schedule,” Sports Minister Aldo Rebelo said at a press conference in Rio to announce the spending plans. “It is the first time we have a consortium of three levels of government. It is in an effort to ensure the success and execution of all the commitments to deliver the Olympics in Rio in 2016.”
Mr. Panja may be contacted at tpanja@bloomberg.net and Mr. Biller may be contacted at dbiller1@bloomberg.net.
Read the court decisionRead the full story...Reprinted courtesy of
Tariq Panja and David Biller, Bloomberg
Connecticut Crumbling Concrete Cases Not Covered Under "Collapse" Provision in Homeowner's Policy
July 01, 2019 —
Kerianne E. Kane - Saxe Doernberger & Vita, P.C.What do you do when your house falls out from underneath you? Over the last few years, homeowners in northeastern Connecticut have been suing their insurers for denying coverage for claims based on deteriorating foundations in their homes. The lawsuits, which have come to be known as the “crumbling concrete cases,” stem from the use of faulty concrete to pour foundations of approximately 35,000 homes built during the 1980s and 1990s. In order to save their homes, thousands of homeowners have been left with no other choice but to lift their homes off the crumbling foundations, tear out the defective concrete and replace it. The process typically costs between $150,000 to $350,000 per home, and homeowner’s insurers are refusing to cover the costs. As a result, dozens of lawsuits have been filed by Connecticut homeowners in both state and federal court.
Of those cases, three related lawsuits against Allstate Insurance Company were the first to make it to the federal appellate level.1 The Second Circuit Court of Appeals was tasked with deciding one common issue: whether the “collapse” provision in the Allstate homeowner’s policy affords coverage for gradually deteriorating basement walls that remain standing.
The Allstate policies at issue were “all-risk” policies, meaning they covered “sudden and accidental direct physical losses” to residential properties. While “collapse” losses were generally excluded, the policies did provide coverage for a limited class of “sudden and accidental” collapses, including those caused by “hidden decay,” and/or “defective methods or materials used in construction, repair or renovations.” Covered collapses did not include instances of “settling, cracking, shrinking, bulging or expansion.”
Read the court decisionRead the full story...Reprinted courtesy of
Kerianne E. Kane, Saxe Doernberger & Vita, P.C.Ms. Kane may be contacted at
kek@sdvlaw.com
"Occurrence" May Include Intentional Acts In Montana
June 22, 2016 —
Tred R. Eyerly – Insurance Law HawaiiThe Montana Supreme Court found that policy language defining "accidents may include intentional acts." Employers Mut. Cas. Co. v. Fisher Builders, Inc., 2016 Mont. LEXIS 269 (Mont. Sup. Ct. April 19, 2016).
Jerry and Karen Slack hired Fisher Builders to build a remodeled home located on the site of their home at Flathead Lake. The existing home was an aged vacation home. The County zoning regulations required the remodeled home to incorporate the existing structure. The permit issued to the Slacks required the existing deck to remain unchanged.
Fisher elevated the existing home structure on steel beams to pour a new foundation. Fisher began to dismantle the walls while the structure was resting on the beams, and found an infestation of carpenter ants. The ant-infested planks were cut out, apparently in order to salvage what usable materials he could from the remaining structure. The ant-infested boards were subsequently burned. Eventually, the deck collapsed.
Read the court decisionRead the full story...Reprinted courtesy of
Tred R. Eyerly, Insurance Law HawaiiMr. Eyerly may be contacted at
te@hawaiilawyer.com
Another TV Fried as Georgia Leads U.S. in Lightning Costs
June 26, 2014 —
Kelly Gilblom – BloombergGeorgia tops a shocking list: most likely place to have property damaged by lightning.
Georgia residents were reimbursed for $56 million of lightning-related damage in homes last year tied to more than 11,000 claims, according to a top-10 list from the Insurance Information Institute. Texas ranked second at $54.2 million.
Once lightning is “in the wiring, it’s electrifying anything connected to that,” John Jensenius, a lightning-safety specialist at the National Weather Service, said today in a phone interview. “Televisions, and even things like microwaves, they all have little chips in them so they all can get fried pretty easily.”
Lightning cost insurers $5,869 per claim in the U.S. last year, more than double the average in 2004, as homeowners added electronics such as computers and high-definition televisions. Still, the total expense for the industry declined 8.4 percent nationwide in that span, to $673.5 million in 2013, because better lightning-protection systems and fewer storms decreased the frequency of claims, the industry group said.
Read the court decisionRead the full story...Reprinted courtesy of
Kelly Gilblom, BloombergMs. Gilblom may be contacted at
kgilblom@bloomberg.net
Arbitrator May Use Own Discretion in Consolidating Construction Defect Cases
September 01, 2011 —
CDJ STAFFThe Mississippi Court of Appeals has ruled in the case of Harry Baker Smith Architects II, PLLC v. Sea Breeze I, LLC. Sea Breeze contracted with Harry Baker Smith Architects II, PLLC (HBSA) to design a condominium complex, which would be built by Roy Anderson Corporation. All parties agreed to arbitration.
Subsequently, Sea Breeze alleged defects and sought arbitration against the architectural firm and started a separate arbitration proceeding against the contractor. The special arbitrator appointed by the American Arbitrators Association determined that it would be proper to consolidate the two actions “since they arose from a common question of fact or law.” HBSA filed in chancery court seeking injunctive relief and a reversal of the decision. Sea Breeze and Roy Anderson filed a motion to compel the consolidated arbitration.
The court noted that the special arbitrator “established that the contract between Sea Breeze and Roy Anderson expressly allowed for consolidation of the two cases.” Further, the arbitrator “concluded that HBSA expressly agreed to consolidation by written consent through its 2008 letter, through which it insisted upon Roy Anderson’s involvement ‘in any mediation and/or arbitration.’”
The court concluded that the chancery court “did not have the power to fulfill HBSA’s request.” The court affirmed the chancery court’s judgment.
Read the court’s decision…
Read the court decisionRead the full story...Reprinted courtesy of