Loss of Use From Allegedly Improper Drainage System Triggers Defense Under CGL Policy
February 28, 2018 —
Katherine E. Miller and Michael S. Levine – Hunton Insurance Recovery BlogThe Eleventh Circuit, in
Mid-Continent Casualty Co. v. Adams Homes of Northwest Florida, Inc., No. 17-12660, 2018 WL 834896, at * 3-4 (11th Cir. Feb. 13, 2018) (per curiam), recently held under Florida law that a homebuilder’s alleged failure to implement a proper drainage system that allowed for neighborhood flooding triggered a general liability insurer’s duty to defend because the allegations involved a potentially covered loss of use of covered property.
Reprinted courtesy of
Katherine E. Miller, Hunton & Williams and
Michael S. Levine, Hunton & Williams
Ms. Miller may be contacted at kmiller@hunton.com
Mr. Levine may be contacted at mlevine@hunton.com
Read the court decisionRead the full story...Reprinted courtesy of
Evolving Climate Patterns and Extreme Weather Demand New Building Methods
May 22, 2023 —
Annette Rubin - Construction ExecutiveCompared to the rest of the world, most buildings in the United States are relatively young. But most residential and commercial properties could use a makeover. Buildings constructed over twenty, fifty and one hundred years ago are, unsurprisingly, not as energy-efficient or as safe as new builds following modern methods—especially when considering the effects of climate change and more frequent extreme weather events on the integrity of that infrastructure.
According to the National Association of Home Builders, over 90% of new homes built in the United States today are wood-framed. These homes are incapable of withstanding a tornado or hurricane, yet they are still being built directly in the path of storms. Even buildings constructed in some of the most earthquake-prone areas of the U.S. may contain design flaws that make them susceptible to damage because they are built using a non-ductile concrete method, which experts say has an inadequate configuration of steel reinforcing bars—making the building vulnerable when shaken. While this building method was banned for new construction, it is not yet required to retrofit older construction to improve safety and structural integrity.
Reprinted courtesy of
Annette Rubin, Construction Executive, a publication of Associated Builders and Contractors. All rights reserved.
Read the court decisionRead the full story...Reprinted courtesy of
Wow! A Mechanic’s Lien Bill That Helps Subcontractors and Suppliers
March 05, 2015 —
Christopher G. Hill – Construction Law MusingsYou know how I’ve stated on many occasions that the contract is king here in Virginia? You know how that included contractual provisions waiving mechanic’s lien rights for subcontractors and suppliers? You know how I thought that the General Assembly would not do anything to make mechanic’s liens in Virginia easier to prosecute?
Well, it seems, at least for waivers of mechanic’s lien rights by subcontractors and suppliers (more about general contractors later) I was wrong. This General Assembly session, the Senate introduced a bill, that has now passed both houses as of February 25, 2015, that adds language to Virginia Code Section 43-3 that effectively nullifies any contractual waiver of lien rights prior to any work having been performed by any tier of construction company aside from general contractors.
Read the court decisionRead the full story...Reprinted courtesy of
Christopher G. Hill, Law Office of Christopher G. Hill, PCMr. Hill may be contacted at
chrisghill@constructionlawva.com
Two Firm Members Among the “Best Lawyers in America”
September 01, 2016 —
A&C Crew – Ahlers & Cressman PLLCWe are excited to announce that John P. Ahlers has been selected as a “Lawyer of the Year” in Construction Law, and John P. Ahlers and Paul R. Cressman, Jr. have been selected as “Best Lawyers in America” in Construction Litigation by Best Lawyers for 2017. Best Lawyers has recognized Mr. Ahlers and Mr. Cressman as “Best Lawyers in America” since 2007 and 2013, respectively.
Read the court decisionRead the full story...Reprinted courtesy of
Rhode Island Examines a Property Owner’s Intended Beneficiary Status and the Economic Loss Doctrine in the Context of a Construction Contract
March 18, 2019 —
Shannon M. Warren - The Subrogation StrategistIn Hexagon Holdings Inc. v. Carlisle Syntec, Inc. No. 2017-175-Appeal, 2019 R.I. Lexis 14 (January 17, 2019), the Supreme Court of Rhode Island, discussing claims associated with allegedly defective construction, addressed issues involving intended beneficiaries to contracts and the application of the economic loss doctrine. The court held that, based on the evidence presented, the building owner, Hexagon Holdings, Inc. (Hexagon) was not an intended third-party beneficiary of the subcontract between the general contractor (A/Z Corporation) and the subcontractor, defendant McKenna Roofing and Construction, Inc. (McKenna). In addition, the court held that, in the context of this commercial construction contract, the economic loss doctrine applied and barred Hexagon’s negligence claims against McKenna.
Approximately nine years after Hexagon entered into a contract with A/Z Corporation for the construction of a building, Hexagon filed suit against A/Z Corporation’s roofing installation subcontractor, McKenna, and the manufacturer of the roofing system. Hexagon alleged that the roof began to leak shortly after McKenna installed it. Notably, Hexagon did not sue A/Z Corporation.
Read the court decisionRead the full story...Reprinted courtesy of
Shannon M. Warren, White and WilliamsMs. Warren may be contacted at
warrens@whiteandwilliams.com
New York: The "Loss Transfer" Opportunity to Recover Otherwise Non-Recoverable First-Party Benefits
May 13, 2014 —
Robert M. Caplan – White and Williams LLPNew York’s “no-fault” legislation reflects a public policy designed to make the insurer of first-party benefits absorb the economic impact of loss without resort to reimbursement from its insured or, by subrogation, from the tortfeasor. Country Wide Ins. Co. v. Osathanugrah, 94 A.D.2d 513, 515 (N.Y. 1st Dept. 1983). The no-fault concept embodied in New York’s Insurance Law modifies the common law system of reparation for personal injuries under tort law. Safeco Ins. Co. of Am. v. Jamaica Water Supply Co., 83 A.D.2d 427, 431 (N.Y. 2nd Dept. 1981). “[F]irst party benefits are a form of compensation unknown at common law, resting on predicates independent of the fault or negligence of the injured party.” Id. at 431. The purpose of New York’s no-fault scheme is “to promote prompt resolution of injury claims, limit cost to consumers and alleviate unnecessary burdens on the courts.” Byrne v. Oester Trucking, Inc., 386 F. Supp. 2d 386, 391 (S.D.N.Y. 2005).
New York’s no-fault scheme—contained in Article 51 of its Consolidated Laws (“Comprehensive Motor Vehicle Insurance Reparations”)—requires owners of vehicles to carry insurance with $50,000 minimum limits which covers basic economic loss, i.e., first-party benefits, on account of personal injury arising from the use or operation of a motor vehicle. Basic economic loss includes, among other things: (1) medical expenses; (2) lost earnings up to $2,000 per month for three years; and (3) out-of-pocket expenses up to $25 per day for one year. N.Y. INS. LAW § 5102(a).
Read the court decisionRead the full story...Reprinted courtesy of
Robert M. Caplan, White and Williams LLPMr. Caplan may be contacted at
caplanr@whiteandwilliams.com
Congratulations to BWB&O’s Newport Beach Team on Obtaining a Defense Verdict in Favor of their Subcontractor Client!
April 02, 2024 —
Dolores Montoya - Bremer Whyte Brown & O'Meara LLPBremer Whyte Brown & O’Meara’s Newport Beach Partner Morgan Stiefel and Associate Brandon Cook obtained a defense verdict after years-long litigation in favor of their subcontractor client.
This lawsuit stemmed from a claim made by Plaintiff for eye injuries arising out of claimed negligence and strict liability associated with our client’s performance of a sandblasting job at a construction site adjacent to Plaintiff’s home. Plaintiff alleges that while she was in her backyard, sand hit her in the eyes at a high velocity speed, resulting in permanent damage to her eyes.
We argued our clients took all necessary safety precautions in the performance of this job, and Plaintiff’s eye irritation symptoms could not have been caused by our client. All of her alleged injuries were either pre-existing or could be explained by circumstances other than our client’s actions. Through expert testimony and our arguments, we were able to show the jury that Plaintiff lied about the sand entering her eyes at a high velocity and her symptoms being caused by our clients’ performance of the sandblasting job.
Read the court decisionRead the full story...Reprinted courtesy of
Dolores Montoya, Bremer Whyte Brown & O'Meara LLP
Construction Warranties and the Statute of Repose – Southern States Chemical, Inc v. Tampa Tank & Welding Inc.
January 20, 2020 —
David R. Cook - AHC Construction and Procurement BlogIn a recent holding by the Georgia Court of Appeals, the court held that Georgia’s eight-year statute of repose applied to bar the project owner’s warranty claims. The renovation work by the contractor on the owner’s chemical tank constituted an improvement of real property, and thus, the statute of repose bared any claims eight years after substantial completion thereof. In addition, the court rejected the project owner’s claim that it qualified as a third-party beneficiary of an extended warranty contained in a report given by a subcontractor to the contractor.
Factual Background
In 2000, Southern States Phosphate and Fertilizer Company (“Southern States”) hired Tampa Tank & Welding, Inc (“Tampa Tank”) to renovate a tank to hold sulfuric acid. The parties’ written contract contained an express one-year warranty for material and workmanship from the date of completion. Two years later, in January 2002, the tank renovation was completed. Tampa Tank contracted with Corrosion Control Inc. (“CCI”) to design, assist with, and test the cathodic corrosion system. CCI provided only consultation and did not provide any onsite installation. Upon completion of installation, CCI supplied a report to Tampa Tank that the system was properly installed and fully functioning. Additionally, a post–installation report from CCI to Tampa Tank calculated an estimated life expectancy of forty-three to forty-five years.
Read the court decisionRead the full story...Reprinted courtesy of
David R. Cook, Autry, Hall & Cook, LLPMr. Cook may be contacted at
cook@ahclaw.com