Billionaire Row Condo Board Sues Developers Over 1,500 Building Defects
September 29, 2021 —
Robert Burnson, BloombergThe condo board at one of New York’s tallest and toniest towers sued the building’s developers, claiming design flaws are to blame for flooding, stuck elevators and “horrible and obtrusive noise and vibration.”
The residential tower at 432 Park Avenue is a 1,396-foot skyscraper overlooking Central Park that was opened in 2015 on the city’s so-called Billionaire Row.
The condo board claims its engineering consultant has identified more than 1,500 construction and design defects — “many of which are described as life safety issues.”
The board that represents the condo owners sued the developers, CIM Group and Macklowe Properties, and the company, also known as sponsor, that the developers formed to build the tower.
The board is seeking $250 million, plus punitive damages, in the lawsuit, filed Thursday in New York Supreme Court.
Read the court decisionRead the full story...Reprinted courtesy of
Robert Burnson, Bloomberg
Illinois Town’s Bond Sale Halted Over Fraudulent Hotel Deals
June 26, 2014 —
William Selway and Elizabeth Campbell – BloombergA city outside Chicago was blocked from selling bonds after the U.S. Securities and Exchange Commission accused it of defrauding investors and steering secret fees to a municipal official.
The case against Harvey, Illinois, a struggling city of 25,000 battered by poverty and crime, involves about $14 million in bonds sold from 2008 to 2010 that were to pay for development of a Holiday Inn hotel and conference venue.
The SEC said that the city hoodwinked investors by using $1.7 million to pay payroll and other operating expenses, while the hotel stands in disrepair with holes in its facade, exposed studs and a gutted interior. The SEC said Comptroller Joseph Letke, 55, also profited by receiving $269,000 in undisclosed payments while advising the developer of the ill-fated project.
Mr. Selway may be contacted at wselway@bloomberg.net; Ms. Campbell may be contacted at ecampbell14@bloomberg.net
Read the court decisionRead the full story...Reprinted courtesy of
William Selway and Elizabeth Campbell, Bloomberg
Endorsement Excludes Replacement of Undamaged Property with Matching Materials
August 20, 2019 —
Tred R. Eyerly - Insurance Law HawaiiThe court approved the insurer's endorsement which stated the insured would not pay for undamaged property in order to match damaged property. Noonan v. Am. Family Mut. Ins. Co., 2019 U.S. App. LEXIS 15545 (May 24, 2019).
After hail and wind damaged part of the roof in the insureds' home, American Family inspected the roof and determined that it had suffered $12,000 in damage. The insureds disputed this amount and demanded an appraisal to provide a binding estimate of the amount of loss. American Family asked the appraisers to divide their estimate into two categories - one for replacing damaged shingles and another for replacing undamaged shingles that would not match those needed to replace the damaged ones. The appraisers did not do so. They instead found that replacing the entire roof would cost $141,000 and noted there was a matching issue because alternative products did not match the current shingles on the roof.
Of the $141,000 needed to replace the entire roof, American Family estimated that $87,232.98 was due to the costs of matching. The insureds sued. The district court remanded the case to the appraisers to clarify the award by differentiating the costs attributable to the actual roof damage from those attributable to shingle matching. The appraisers clarified the award and reported that actual damages were $66,619, meaning that $74,381 was attributable to matching. American Family then paid the actual damages, less the deductible, but refused to pay the rest.
Read the court decisionRead the full story...Reprinted courtesy of
Tred R. Eyerly, Damon Key Leong Kupchak HastertMr. Eyerly may be contacted at
te@hawaiilawyer.com
Meet the Forum's In-House Counsel: ERIN CANNON-WELLS
June 26, 2023 —
Jessica Knox - The Dispute ResolverCompany: Keller North America, Inc.
Email: ecannon@keller-na.com
Website: https://www.keller-na.com/
Under Grad: University of Delaware (Bachelor of Civil Engineering 2000)
Grad School: The University of Texas (Master of Civil Engineering 2002)
Law School: Howard University (JD 2008)
States Where Company Operates/Does Business: Throughout the US and Canada
Q: Describe your background and the path you took to becoming in-house counsel.
A: I studied civil engineering in undergrad and finally found my "calling" when I took a construction course, prompting me to pursue a master's in construction engineering. I started my career at Turner, holding various engineering positions, the last of which introduced me to the "contracting" side of construction. I was inspired to go to law school (in hopes of becoming an in-house lawyer there). After law school, I joined BigLaw, but maintained my desire to practice construction law. I then jumped to a small construction practice group at a mid-size firm, and the mentoring and experience there was everything I could hope for (but for the looming business development and billable hour requirements). From there, I became the sole in-house counsel for a large cement manufacturer and was a true construction generalist. Now I am part of a great legal team for a leading geotechnical specialty contractor. My moves were strategic, and I'm pleased to say that this is the very career I went to law school to have.
Read the court decisionRead the full story...Reprinted courtesy of
Jessica Knox, Stinson LLPMs. Knox may be contacted at
jessica.knox@stinson.com
Pensacola Bridge Halted Due to Alleged Construction Defects
July 21, 2018 —
David Suggs – Bert L. Howe & Associates, Inc.The Pensacola News Journal reported that cracks were discovered again in the Pensacola Bay Bridge, which caused construction of said bridge to be halted once more: “Cracks found in a portion of the concrete in the Pensacola Bay Bridge project have twice halted construction in the last several months, raising concerns about oversight and disclosure from the state, particularly in light of the Miami bridge collapse earlier this year.”
The Florida Department of Transportation stated “that the cracks were found during a routine visual inspection of newly placed concrete in March,” according to the Pensacola News Journal. The $400 million project began in 2017 and was scheduled to be completed by 2020.
Read the court decisionRead the full story...Reprinted courtesy of
Is an Initial Decision Maker, Project Neutral, or Dispute Resolution Board Right for You?
July 14, 2016 —
David Adelstein – Florida Construction Legal UpdatesRecently, I participated in a roundtable hosted by JAMS with experienced South Florida construction lawyers and retired circuit court judges to discuss the pros and cons of utilizing an initial decision maker (“IDM” and also referred to as a project neutral) or a dispute resolution board (“DRB”) to resolve disputes on construction projects. The IDM and DRB are designed to resolve disputes, specifically claims (whether for time, money, or both), during construction to keep the project progressing forward without being bogged down by the inevitable claim. There are numerous avenues to resolve disputes without resorting to filing a lawsuit or a demand for arbitration. The thought is that dispute resolution will be facilitated by techniques designed to assist the parties with the resolution of claims during construction. While direct discussions between the parties, meetings with the executives for business decision purposes, mediations, etc., are certainly helpful, sometimes these avenues are simply not enough to truly resolve a complex claim on a construction project that occurs during construction.
Read the court decisionRead the full story...Reprinted courtesy of
David M. Adelstein, Kirwin NorrisMr. Adelstein may be contacted at
dma@kirwinnorris.com
Zillow Topping Realogy Shows Web Surge for Housing Market
July 30, 2014 —
Prashant Gopal and John Gittelsohn – BloombergZillow Inc. (Z)’s purchase of Trulia Inc. makes the online company such a force in U.S. real estate that its market value now surpasses that of Realogy Corp., owner of renowned brokerage brands from Coldwell Banker to Century 21.
Zillow, the biggest U.S. real estate website, has seen its market value jump to about $5.83 billion from $4.99 billion on July 23, the day before Bloomberg News reported the deal talks with rival Trulia. Realogy, the largest residential brokerage operator, has a market value of about $5.47 billion, compared with $5.67 billion last week, data compiled by Bloomberg show.
The shift underscores the growing role of the Web in U.S. home sales as buyers start their hunt for homes and mortgages online and rely less on real estate agents, a migration that has taken longer than in industries such as music or travel. While Zillow is unlikely to compete directly with brokers, whose ad dollars are its top revenue source, buying Trulia (TRLA) gives it more command over marketing fees, sparking concerns among Realtors such as Stephen FitzMaurice that costs will rise.
Mr. Gopal may be contacted at pgopal2@bloomberg.net; Mr. Gittelsohn may be contacted at johngitt@bloomberg.net
Read the court decisionRead the full story...Reprinted courtesy of
Prashant Gopal and John Gittelsohn, Bloomberg
Impaired Property Exclusion Bars Coverage When Loose Bolt Interferes with MRI Unit Operation
May 16, 2018 —
Christopher Kendrick & Valerie A. Moore - Haight Brown & Bonesteel, LLPIn All Green Electric v. Security National Ins. Co. (No. B279456, filed 3/19/18, ord. pub. 4/17/18), a California appeals court ruled that the impaired property exclusion barred coverage for a claim based on the insured’s failure to tighten a loose bolt that resulted in stray magnetic fields interfering with operation of an MRI machine and allegedly threatening the health of personnel.
All Green was an electrical contractor hired to perform wiring for an MRI unit installation. Stray magnetic fields interfered with the unit’s operation. Efforts to remediate the problem included installing shielding and ultimately relocating the unit to another room. An expert finally determined that a bolt left loose by All Green was causing the magnetic field, which disappeared when the bolt was properly tightened. The facility sought damages for negligence, including costs for unnecessary modifications and repairs, payments to outside sources for substitute mammography testing, operational costs and expenses, damage to reputation, lost profits, and the loss of an HMO contract.
Reprinted courtesy of
Christopher Kendrick, Haight Brown & Bonesteel LLP and
Valerie A. Moore, Haight Brown & Bonesteel LLP
Mr. Kendrick may be contacted at ckendrick@hbblaw.com
Ms. Moore may be contacted at vmoore@hbblaw.com
Read the court decisionRead the full story...Reprinted courtesy of